ML18152B286

From kanterella
Jump to navigation Jump to search
Notification of 881222 Enforcement Conference W/Util in Atlanta,Ga to Discuss Failure to Take Adequate Corrective Action During & After Reactor Cavity Seal & Svc Water Sys Design Control Issue
ML18152B286
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/28/1988
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18152B285 List:
References
NUDOCS 8812060173
Download: ML18152B286 (2)


Text

NOV.2 8 19~8 e

NOTICE OF SIGNIFICANT ~EETING Name of Licensee:

Virginia Electric and Power Companj Name oy Facility: Surry Docket Nos.

50-280 and 50-281 Date and Time of Meeting:

December 22, 1988, at 8:30 a.m.

Location of Meeting:

Region II Office, Atlanta, Georgia Pur~ose of Meeting:

Enforcement Conference to discuss failure to take adequate corrective action*during and after the reactor cavity seal event as indicated in NRC Inspection Report No. 50-280, 281/88'."34 arid 50-280, 281/88-41; service water system design

~ontrol issues as. described in Inspection Report No. 50-280, 281/88-32; and qualification of motor operated valves to perform their design function.

NRC Attendees:

M. L. Ernst, Acting Regional Administr~tor G. R. Jenkins, Director, Enforcement and Investigation Coordination Staff L.A. Reyes, Director, Division of Reactor Projects (DRP)

A. F. Gibson, Director, Division of Reactor Safety B.. A. Wilson, Chief, Reactor Projects Branch 2, DRP F. S. Cantrell, Chief; Project Section 2A, DRP B. C. Buckley, Project Manager, Office of Nuclear Reactor Regulation Licensee Attendees:. W.R. Cartwright, Vice President, Nucl~ar Operations R. W. Calder, Manager of Nuclear Engineering N. E. Hardwick, Manager, Nuclear Programs and Licensing M. R. Kansler, Station Manager, Surry E. S. Grecheck, Assistant Station Manager, Surry NOTE:

Attendance by NRC personnel at this NRC/Licensee meeting should be made known by 1:00 p.m., December 14, 1988, via telephone call to M. A. Scott at FTS:

242-0429.

Distribution:

(See Page 2)

  • 17~,._q~_:1128 881206~--~

F*~R ADU~K 050002~U i..;

p[IC G!

Original signed by )

Approved by:

w

  • K Poertner ( :f:c:,, _

F. Cantrell, Chief Reactor Projects Section 2A

I.

e Notice of Significant Meeting 2

Distribution: J.M. Taylor, DEDRO J. H. *Sniezek, De~uty Director, NRR

  • J. Lieberman, Di rector, OE
e.

liU V 2 8 }ijij8 G. c. Lainas, A/D for Region II Reactors, NRR R. W. Borchardt, Regional Coordinator, EDO C. Patel, Licensing Project Manager, NRR bee:

M. L. Ernst L.A. Reyes A. F. Gibson D. M.,. Coll ins G. R. Jenkins R. J. Goddard K. M. Clark H. N. Berkow, NRR

  • All NRG Attendees Employee D~velopment Specialist Receptionist RIIJ;,PRP

. \\<{'?.

MScott ll/'2988 RII:~R'i l~\\

!J._988 RI~S c}ti{i~n ll/'),C::l/88 RI\\tRRS ~II:

p AG~n h

llfJS/88 1 D,.5'/88