ML18152B252
| ML18152B252 | |
| Person / Time | |
|---|---|
| Site: | Surry, North Anna, 05000000 |
| Issue date: | 10/19/1988 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Cruden D VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| References | |
| NUDOCS 8810310348 | |
| Download: ML18152B252 (1) | |
Text
October 19, 1988 Docket _Nos. 50-338, 50-339, 50-280, and 50-281 Virginia Electric and Power Company ATIN:
Mr. D.S. Cruden, Vice President, Nuclear Operations P. O. Box 26666 R1chmond, VA 23261
SUBJECT:
ACCEPTANCE Of CHANGE TO THE OPERATIONAL QUALITY ASSURANCE PROGRAM (VEP-1-5A) FOR SURRY UNITS 1 AND 2 AND NORTH ANNA UNITS 1 AND 2 Your letter dated June 21, 1988, (88-319) transmitted VEP 1-SA (Update-4/88) in accordance with 10 CFR 50.54(a).
This report provides the current quality assurance program description for Surry and North Anna *
. Our review of the VEPCO QA Program included the following material:
Scope:
Surry North Anna FSAR Section 15.2 Revision 6 FSAR Section 3.2 Revision 7
- Commitment to Regulatory Guides:
VEP 1-SA 4/88 Updated QA Program
Description:
VEP 1-5A 4/88 Updated This review, including a teleconference conducted between NRC and VEPCO personnel on August 17, 1988, indicates that VEP 1-5A (Update-4/88) continues to satisfy 10 CFR 50, Appendix B requirements and is therefore acceptable.
Please contact Mr. G. A. Belisle at 404-331-5596 if you have any questions concerning this letter.
cc:
G. E. Kane, Station Manager N. E. Hardwick, Manager - Nuclear Programs and Licerising D. L. Benson, Station Manager bee: NRC Resident Inspector
- Surry DRS Technical Assistant Document Control Desk Cornnonwealth of Virginia Sincerely, Original signed by Al Belisle For Caudle A. Julian, Chief Operations Branch North Anna Residen\\ ~n~pr RI!,
RI!.,
- .:- ~<lj~II lJ/S ~
, /ub i{Y
("
- Jv/ /(;'P U!
v RM"oore:sh GBelisle CAJulian 08/,.'/88 08/, /88
-087; / /88 I,
IC I (
I T