ML18152B284

From kanterella
Jump to navigation Jump to search
Confirms 881123 Telcon Re 881222 Enforcement Conference at Region II Ofc Concerning Corrective Action Problems at Plant
ML18152B284
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/28/1988
From: Ernst M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Cartwright R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18152B285 List:
References
NUDOCS 8812060170
Download: ML18152B284 (2)


Text

NOV % 8 1988 Virginia Electric and Power Company ATTN:

Mr. R. W. Cartwright, Vice President Nuclear Operations 5000 Dominion Blvd.

Glen Allen, VA 23060 Gentlemen:

SUBJECT:

CONFIRMATION OF ENFORCEMENT CONFERENCE ARRANGEMENTS DOCKET NOS. 50-280 AND 50-281 This confirms the conversation betwee'n N.

E. Hardwick of your staff and F. Cantrel 1 of my staff, on November 23, 1988, concerning an Enforcement Conference to be conducted at the NRC Region II _Office on December 22, 1988, at 8:30 a~m.

W~ requeste~ this meeting to discuss corrective action problems which have occurred at Surry.

Enclosed is a proposed meeting agenda.

Should you have any questions concerning this letter, please contact us.

Enclosure:

Proposed Meeting Agenda cc w/encl:

M. R. Kansler, Station Manager N; E. Hardwick, Manager - Nuclear Programs and Licensing Commonwealth of Virginia bee w/encl:

NRC Resident Inspector Document Control Desk G. Jenkins, EICS Director, DRP Director, DRS thief, Branch 2, DRP NRR Project Directorate, PD-II-2 Sincerely, Original signed by Malcolm L. Ernst Acting Regional Administrator RII:DRP M~fi 11/ 25188 RII:DRP i.&h FCantrel 11/2518 RII~Rf CJ~i~n ll/').!188 7 -

,-,,=, l 1 *~.. ::*

ss120601 u 3~bo5~so PDR. ADOCK PDC 1:;-i o-Pf

I.

I I.

III.

ENCLOSURE PROPOSED MEETING AGENDA VIRGINIA ELECTRIC AND POWER COMPANY MEETING WITH NRC DECEMBER 22, 1988 Opening Remarks Issues of Concern A.

Reactor Cavity Seal Leak Issues As Described In Inspection Report No. 50-280, 281/88-34 B.

Additional Examples-Of Failure To Take Corrective Action As Identified In Inspection Report No; 50-280, 281/88-41 C.

The Service Water System Design Control Issues As Described In Inspection Report No. 50-280, 281/88-32 D.

The Qualification Of Safety-Related Motor Operated Valves To Perform Their Design Function As Described In Your 10 CFR 50.72 Report To The NRC Closing Remarks NRC VEPCO NRC