UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., ATLANTA, GEORGIA 30323 Report Nos.:
50-280/88-37-and 50-281/88-37 Licensee:
Virginia Electric and Power Company Richmond, VA 23261 Docket Nos.:
50-280 and 50-281 Facility Name:
Surry 1 and 2 License Nos.: DPR-32 and DPR-37 Inspection 1988 Section Safety SUMMARY
/c I !;*j s.
D te Signed
/D lrs-/s 9" o&te Signed Scope:
This routine, unannounced inspection was conducted in the areas of Inservice Inspection (!SI) including review of ISI program admini-strative procedures, review of NOE procedures, observation and review of activities associated with NOE. examinations, revtew. of ISI examination data, and discussions and reviews of activities associated with NRC Bulletin 87-01 and previously opened item Results:
In the areas inspected, violations or deviations were not identifie The licensee has very recently issued a revised !SI inspection manual that includes both new and revised administrative and NOE procedure The administrative procedures establish a more comprehensive control of !SI activities and the NOE procedures, in most cases, are an improvement over previously used procedure The licensee has an adequate, comprehensive, pipe wall thinning detection plan in place, as evidenced by the recent detection of excessive wall loss rates in recently replaced 90 degree elbows on the suction side of both the A and B main feedwater pumps in Unit The wall loss was detected through normal application of the inspection plan *
All other areas inspected appeared to be adequately controlle as1~030014c~ o50002so PDR AD n
PNU Q
- REPORT DETAILS Persons Contacted Licensee Employees
- D. Benson, Station Manager
- R. Blount, Superintendent, Technical Services
- R. Bilyeu, Licensing D. Dodson, Senior Staff Specialist
- D. Grady, Supervisor, NOE
- D. Hart, Supervisor - Quality (Auditing)
J. Maciejewski, Manager, ISI NOE Services
- H. Miller, Assistant Station Manager
- D. Rogers, Corporate ISI Group Other licensee employees contacted during* this inspection included craftsmen, engineers, security force members, technicians, and admini-strative personne NRC Resident Inspector
- W. Holland, Senior Resident Inspector
- Attended exit interview Acronyms and initialisms used throughout this report are listed in the last paragrap.
Licensee Action on Previous Enforcement Matters (92702) (Open) Unresolved Item 281/86-34-02, QA records do not agree with visual examination conclusions. Refer to Report No. 50-281/88-15 for background information and licensee commitment The 1 icensee agreed to research historical documentation for the Unit 2 reactor vessel outlet nozzles in order to try and determine what the physical configuration of the inside surface of the nozzles is suppose to be according to the fabrication documentatio The licensee has researched the QA/QC documentation including a review of radiographic fil The results of the documentation search was reported by memo, Innsbrook - 3NW, dated September 14, 198 The inspector reviewed the memo which basically concludes that due to the manner in which the examination reports were completed that the records review did not conclusively establish the condition of the inside surface of the nozzles over the entire required surfac *
The review fulfills one of the commitments agreed to by the licensee however, until the remaining commitment is satisfied this item will remain ope (Open) Unresolved Item 281/86-34-03, Reactor Nozzle Indications -
Refer to Report No. 50-281/88-15 for background information and licensee commitment The licensee committed to establishing documented assigned respon-sibility for the technical review of in-process ISI examination reports and for a technical review of fi-Ral ISI reports. A revision to procedure NDE-7.2 has been issued which establishes specific responsibility for these review The inspector reviewed procedure NDE-7.2 and has concluded this fulfills one of the commitments agreed to.by the license Additional information is needed in order to close the original item, therefore, this item will remain ope.
Inservice Inspection (ISI)
The inspector examined documents, activities, and records as indicated below to determine whether ISI was being conducted in accordance,with applicable procedures, regulatory requirements and licensee commitment The applicable code for ISI is American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME B&PV) Code,Section XI, 1980 edition with addenda through winter 198 Primary ISI examinations had not yet started for this outage however augmented ISI examinations, as required by the Site Technical Specifi-cations, were being conducted on a limited basi The examinations were being conducted by Virginia Corporation of Richmond and Virginia Power Personne Inservice Inspection, Programmatic Review, Units 1 and 2 (73051)
The inspector reviewed the below listed documents relating to the licensee's Inservice Inspection (ISI) program (Plan) for the current outage in the areas of:
program approval; QA program requirements including organizational structure; audit requirements; general QA requirements (examination reports, control of deviations from established program; quality documentation and identification of components); work and quality inspection procedures; control of processes; corrective action; document control; control of examina-tion equipment; quality records; inspection scope; inspection intervals; personnel qualifications; and, NOE records including provisions for storag NOE 6.3 (RO) Storage and Control of NOE Calibration Standards NDE 7.2 (Rl) General Requirements for ISI Nondestructive Examination Plant Specific Guidelines Eddy Current Data Analysis And Training Surry Unit 2 September 1988 Outage
Inservice Inspection Manual Section 7.16 (RO) Control and Storage of Records Section 6.7 (Rl) Steam Generator Tube Examination Program Section 7.2 (Rl) Inservice Inspection Program Interval/Period Plan Procedure Section 7.4 (RO) Review and Control of Westinghouse Steam Generator Tube Eddy.turrent Examination Plans and Reports Section 7.9 (RO) Discrepancy Resolution Procedure Section 7.14 (RO) Ninety Day Inservice Inspection Report Review of Procedures, Units 1 *and 2 (73052)
(1)
The inspector reviewed the procedures indicated below to determine whether the procedures were consistent with regulatory requirements and licensee commitment The procedures were also reviewed in the areas of procedure approval, requirements for qualification of NOE personnel, and compilation of required records; and if applicable, division of responsibility between the licensee and contractor personnel if contractor personnel are involved in the IS! effor Procedure ID VPAiVIR-ISI-8 (RO)
VPA/VIR-ISI-88 (RO)
NDE-UT-205 (Rl)
NOE-MT ~201 (RO)
NDE-PT-201 (RO)
NDE-UT-201 (Rl)
NDE-UT-202 (Rl)
Title Visual Examination for Surry Unit No. 1 and No. 2 Underwater Remote Visual Examination for Surry Units 1 and 2 Manual Ultrasonic Examination of Reactqr Coolant Piping Welds Magnetic Particle Examination Liquid Penetrant Examination Manual Ultrasonic Examination of Piping Welds Ultrasonic Examination of Vessel Welds Less Than 2" In Thickness
- NOE-UT -203 ( Rl)
Ultrasonic Examination of Vessel Welds Greater Than 211 In Thickness (2)
The inspector reviewed the visual examination procedures to determine whether they contained sufficient instructions to assure that the following parameters were specified and controlled within the limits permitted by the applicable code, standard, or any additional specification requirement; method -
direct visual, remote visual or translucent visual: application
- hydrostatic t~sting, fabrication procedure, visual examination of welds, leak testing, etc.; how visual examination is to be performed, type of surface condition available; method or implement used for surface preparation, if any; whether direct or remote viewing is used; special illumination, instruments, or equipment to be used, if any; sequence of performing examina-tion, when applicable; data to be tabulated, if any; acceptance criteria.is.specified and consistent with the applicable code section or controlling specification; and, report form completio (3)
The inspector reviewed the UT Procedures to ascertain whether they had been reviewed and approved in accordance with the licensee's established QA procedure The procedures were reviewed for technical adequacy and conformance.with the ASME Code,Section V Article 5 and other licensee commitments/
requirements in the following listed areas:
type of apparatus used; extent of coverage of weldment; calibration requirements; search units; beam angles; DAC curves; reference level for monitoring di sconti nuiti es; method for demonstrating penetra-tion; limits for evaluating and recording indications; recording significant indications; and, acceptance limit ( 4)
The inspector reviewed PT Procedure NDE-PT-201 to ascertain whether it had been reviewed and approved in accordance with the licensee's established QA procedure The above procedure was reviewed for technical adequacy and conformance with the ASME Code,Section V, Article 6 and other licensee committments/
requirements in.the following areas:
specified method; penetrant material identification; penetrant materials analyzed for sulfur; penetrant materials analyzed for total halogens; acceptable pre-examination surface; drying time; method of penetrant application; surface temperature; solvent removal; surface drying prior to developing; type of developer;. examina-tion technique; evaluation technique; and, procedure requalifi-catio (5)
The inspector reviewed MT Procedure NDE-MT-201 to ascertain whether it had been revised and approved in accordance with the licensee's established QA procedure The procedure was
..
reviewed for technical adequacy and for confonnance with the ASME Code Section V, Article 7, and other licensee commitment/
requirements in the following areas:
examination methods; contrast of dry power particle color with background; surface temperature; suspension medium for wet particles; viewing conditions; examination overlap and directions; pole or prod spacing; current of lifting power (yoke); andj acceptance criteri Observation of Work and Work Activities (73753)
The inspector observed a limited amount of work activities due to the small number of examinations accomplished during this inspection perio The inspector reviewed certification records of equipment, materials, and NOE personnel which had been and will be utilized during the required ISI examinations during this outag The observations and reviews conducted by the inspector are documented belo (1)
The inspector observed calibration activities and the in-process ultrasonic weld profile thickness measurements being taken on weld #13 drawing VIR-2-2300, main steam syste The observation was compared with the applicable procedures and the Code in the following areas:
availability of and compliance with approved NOE procedure; use of knowledgeable NOE personnel; use of NOE personnel qualified to the proper level; type of apparatus used; extent of coverage; calibration requirements; search units; and, beam angle The following listed ultrasonic equipment and materials certification records were reviewed:
Ultrasonic Instruments with serial nos. 05304E and 04363 The inspector reviewed spectrum analysis data for ultrasonic transducers with serial numbers F18164 and G28612 Ultrasonic Couplant Batch 8868 (2)
The inspector reviewed the below listed liquid penetrant materials certification records to ascertain if the sulfur and halogen content of the material was within acceptable content limit Material Liquid Penetrant Cleaner/Remover Developer Batch Number 628F47 75E4 828C6 (3)
The inspector reviewed the NOE qualification documentation for two Vi rgi ni a Corp. of Richmond and Vi rgi ni a Power examiners in the following areas:
employer's name; person certified; activity qualified to perform; effective periods of certifi-cation; signature of employer's designated representative; basis used for certification; and annual visual acuity, color vision examination, and periodic recertificatio Inservice Inspection, Data Review and Evaluation, Unit 2 (73755)
- Records of completed nondestruc:tive examinations were selected and reviewed to ascertain whether:.. the.method(s), technique, and extent of the examination complied with the ISI plan and applicable NOE procedures; findings were properly recorded and evaluated by qualified personnel; programmatic deviations were recorded as required; personnel, instruments, calibration blocks, and NOE materials (penetrants, couplants) were designate Records selected for this review are listed below..
Sketch Item/Weld ID Method S.}'.'.Stem VIR-2-2301 W-21 UT FW VIR-2-2200 W-29 UT MS VIR-2-2201 W-24 UT ___
FW VIR-2-2101 W-25 UT FW VIR-2-2101 W-26 UT FW VIR-1-2100 16-Bolts VT PZR VIR-1-4501 8-Studs/Nuts VT PZR VIR-1-4503 8-Studs/Nuts VT PZR VIR-2-1300 W-2 UT SWI VIR-2-2522 W-4 UT/PT SI VIR-2-2522 W-3 UT/PT SI VIR-2-2522 W-2 UT/PT SI VIR-2-2522 W-1 UT/PT SI VIR-2-2542 W-33 UT/PT SI VIR-1-4658 W-25 PT RS VIR-1-4658 W-9 PT RS VIR-2-2540 W-19 UT/PT SI Within the areas inspected, violations or deviations were not identifie IE Bulletin 87-01, Thinning of Pipe Walls in Nuclear Power Plants, Units 1 and The licensee has officially responded to the requirements of Bulletin 87-0 The inspector conducted a review of documentation and data relative to the actions being generated as a result of this bulletin. The inspector also observed work being performed as a result of actions being taken by the license The documentation reviews and observations conducted by the inspector are documented in the following subparagraph i * Plan Review The inspector had previously reviewed the below 1 i sted document relating to the inspection plan in the areas of:
plan approval; general QA requirements; examination procedures; control of examinations and examination equipment; quality records; personnel qualifications; and NOE record SUADM-M-33 Secondary Piping Inspections - A~ril 7, 1988 The inspector had previously reviewed Ultrasonic Procedure NDE-UT-4 RO~
This procedure is being utilized to obtain_the.thickness reading required by the licensee's inspection pla The inspector observed approximately 1500 thickness readings being taken on the Unit 2 items listed belo The inspector also reviewed certification records of equipment, materials, and NOE personnel being utilized during the examination of these item Test Location 2-FW-PSFT-3 14" - WFPD-126-901 to 18"- WFPD-101-901 2-FW-PSF2-30 14" - FW Sketch 11548-WFPD-15 11546-WFPD-18
- The inspector conducted an independent verification on several of the thickness readings taken on the above test location The verifi-cation readings were made following the completion of the examina-ti ans conducted by 1 i censee personne 1 and with the use of the licensee's equipment, couplant, and calibration bloc The verification readings obtained were within an acceptable tolerance range although minor deviation were noted that could be attributed to transducer placemen The inspector reviewed the thickness data and associated records for a sample of test location The data was reviewed to determine whether the reported thickness was consistent with the data being obtained in the fiel The data was also reviewed to determine compliance with requirements for examination record Discussions with licensee personnel and a review of the past completed examination results shows that replacement of several items has been necessar The very recent discovery of excessive wa 11 thinning rates in recently replaced 90 degree elbows at the suction side of both the A and B main feedwater pumps in Unit 2, which was detected through the normal application of the plant inspection plan, indicates that the plan is functioning adequatel Discussions with the Project Engineer regarding the pipe wall thinning discovered in the relatively new elbows at the main feedwater pumps indicated the elbows have been in service approxi-mately 1.2 years and that the growth rate of the wall thinning
~*
-:-
'1 *
mandates the replacement of these two elbows prior to plant startu The Project Engineer indicated that the elbows will be replaced with the same type material that is currently in place due primarily to the availability of the materia An immediate examination of the same location elbows in Unit 1 is to be made, however this had no been accomplished by the end of this inspection. Also, the licensee intends to conduct a study to determine if the material now in use at these locations should be replaced with a different type materiaJ and/or if the system design needs to be altered in order to eliminate the excessive wall loss at these locations in the futur Within the areas inspected, no viol at ions. or devi ati ans were identifie.
Exit Interview The inspection scope and results were summarized on September 23, 1988, with those persons indicated in paragraph. The inspector described the areas inspected and discussed in detail the inspection result Proprietary information is not contained in this repor Dissenting comments were not received from the license.
Acronyms and Initialisms ASME American Society Of Mechanical Engineers B&PV Boiler and Pressure Vessel BU Bulletin FW Feedwater ISI Inservice Inspectio MT Magnetic particle MS Main Steam NDE Nondestructive Examination PZR Pressurizer PT Liquid penetrant QA Quality Assurance QC Quality Control R
Revision RS Recirculation Spray RV Reactor Vessel SG Steam Generator SI Safety Injection SWI Seal Water Injection UT Ultrasonic VT Visual