Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19210D157 + (02:38:51, 5 January 2025)
- ML19210D155 + (02:38:52, 5 January 2025)
- ML19210D152 + (02:38:52, 5 January 2025)
- ML19210D150 + (02:38:53, 5 January 2025)
- 05000321/LER-1979-086-03, /03L-0:on 791027,secondary Containment Violated by Simultaneous Opening of Airlock Doors Between Reactor Bldg & Radwaste Bldg.Caused Y Design Deficiency.Interlocking Scheme Under Review + (02:38:54, 5 January 2025)
- ML19210D147 + (02:38:56, 5 January 2025)
- ML19210D146 + (02:38:57, 5 January 2025)
- ML19210D145 + (02:38:57, 5 January 2025)
- ML19210D144 + (02:38:58, 5 January 2025)
- ML19210D143 + (02:38:59, 5 January 2025)
- ML19210D142 + (02:39:00, 5 January 2025)
- ML19210D140 + (02:39:01, 5 January 2025)
- ML19210D141 + (02:39:01, 5 January 2025)
- 05000321/LER-1979-086, Forwards LER 79-086/03L-0 + (02:39:03, 5 January 2025)
- ML19210D137 + (02:39:04, 5 January 2025)
- ML19210D135 + (02:39:05, 5 January 2025)
- ML19210D134 + (02:39:06, 5 January 2025)
- 05000334/LER-1979-043-03, /03L-0:on 790301,during Period Mar-Sept 1979, Analysis of Diesel Fuel Not Completed within Specified Time. Caused by Incomplete Instructions for Modes 5 & 6.Chemistry Manual Revised to Clarify Sampling + (02:39:07, 5 January 2025)
- ML19210D132 + (02:39:08, 5 January 2025)
- ML19210D131 + (02:39:09, 5 January 2025)
- ML19210D130 + (02:39:10, 5 January 2025)
- ML19210D129 + (02:39:10, 5 January 2025)
- ML19210D128 + (02:39:11, 5 January 2025)
- 05000334/LER-1979-043, Forwards LER 79-043/03L-0 + (02:39:12, 5 January 2025)
- ML19210D125 + (02:39:13, 5 January 2025)
- ML19210D124 + (02:39:14, 5 January 2025)
- ML19210D120 + (02:39:15, 5 January 2025)
- ML19210D122 + (02:39:15, 5 January 2025)
- ML19210D119 + (02:39:16, 5 January 2025)
- 05000366/LER-1979-116-03, /03L-0:on 791025,HPCI Steam Line Inboard Valve Failed to Isolate During Calibr & Testing.Caused by Conservative Setting of Torque Switch.Engineering Package Review Revealed That Higher Setting Should Be Used + (02:39:17, 5 January 2025)
- ML19210D117 + (02:39:19, 5 January 2025)
- ML19210D115 + (02:39:20, 5 January 2025)
- 05000313/LER-1979-019-03, /03L-0:on 791012,condensate Isolation Valve CV-1065 to Quench Tank Failed to Close from Control Panels C-16 & 18.Caused by Burnt Out Solenoid Coils.Replaced AC Coils by Coils & Tested Valve + (02:39:22, 5 January 2025)
- 05000366/LER-1979-116, Forwards LER 79-116/03L-0 + (02:39:24, 5 January 2025)
- ML19210D111 + (02:39:28, 5 January 2025)
- ML19210D110 + (02:39:29, 5 January 2025)
- 05000325/LER-1979-074-03, /03L-0:on 791019,reactor Scram Received from High Radiation Signal on Main Steam Line High Radiation Monitors. Caused by Resin Injection from Reactor Water Cleanup Sys.Sys Depressurized + (02:39:31, 5 January 2025)
- ML19210D108 + (02:39:33, 5 January 2025)
- 05000313/LER-1979-019, Forwards LER 79-019/03L-0 + (02:39:34, 5 January 2025)
- ML19210D104 + (02:39:35, 5 January 2025)
- ML19210D103 + (02:39:36, 5 January 2025)
- 05000325/LER-1979-074, Forwards LER 79-074/03L-0 + (02:39:37, 5 January 2025)
- ML19210D098 + (02:39:39, 5 January 2025)
- ML19210D097 + (02:39:40, 5 January 2025)
- ML19210D096 + (02:39:41, 5 January 2025)
- ML19210D095 + (02:39:42, 5 January 2025)
- ML19210D094 + (02:39:42, 5 January 2025)
- 05000267/LER-1979-049-03, /03L-0;on 791014,while Operating at 63% Power, Upset in Circulator Buffer Helium Sys Caused Release of Radioactivity to Reactor Bldg & Ventilation Exhaust Stack. Caused by Leaking Velan Valve HV-21352.Valve Repaired + (02:39:44, 5 January 2025)
- ML19210D092 + (02:39:45, 5 January 2025)
- ML19210D091 + (02:39:46, 5 January 2025)
- ML19210D090 + (02:39:47, 5 January 2025)
- ML19210D089 + (02:39:47, 5 January 2025)