Potential Significant Deficiency Re Exposed Area in Control Cable.Partially Exposed Wire Discovered in Area of Insulation Splice in Control Cable Bundle.Faulty Splice Removed
ML19210D111
Person / Time
Site: North Anna Dominion icon.png
Issue date: 10/26/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
NUDOCS 7911200546
Download: ML19210D111 (2)


Text

4' L />:

.r.

VraorNrA Ex.ECTRIC AND Powan COMPANY Hrcunown,VxmorazA nO261 7

October 26, 1979 Mr. James P. O'Reilly, Director Serial No. 881 Office of Inspection and Enforcement P0/FHT:scj U. S. Nuclear Regulatory Commission Docket No. 50-338 Region II License No. NPF-4 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Under the provisions of 10CFR21, NRC Region II was notified on October 23, 1979, that a potential significant deficiency or substantial safety hazard existed at North Anna lower Station, Unit 1.

In accordance with the reporting requirements of the above regulations, the following information is submitted:

A.

Name and address of reporting individual:

C. M. Stallings Virginia Electric and Power Company P. O. Box 26666 Richmond, Virginia 23261 B.

Facility, activity and/or component affected: Control cable being in-stalled on a design change for degraded grid voltage, North Anna Power Station Unit No. 1.

C.

Name of firm supplying the component, activity or service: Cerro/Rockbestos Corporation, Nicoll & Canner Street, New Haven, Connecticut 06504.

D.

Description of defect, deficiency, or failure to comply: A partially ex-posed wire was discovered in the area of an insulation splice, in a con-trol cable bundle (IENSHOC077) of twelve wires of size #14 AWG (NJK45-14).

E.

Date of determination of reportability:

10/22/79.

F.

Similar components, activities, or services: no safety-related systems.

G.

Corrective action which has been, is being, or will be taken, the individu-al responsible and the length of time to complete the action: The faulty splice was removed and the cable was properly terminated.

H.

Other information: All like cable (spools 3187-150, 3187-151 and 3187-153) has been returned to the manufacturer for examination to determine if this q is a generic problem.

)gg 19C 9C 5 e ;.%L COPY-

b*

vlBolNIA ELzcTarc axo Powra CoxPANY TO Mr. James P. O'Reilly 2

Any additional information regarding the above topic will be submitted as a follow-up report.

Should you require further information, please contact this office.

..ry truly yours,

,f /) / q )/s,1.taa.a

~

C. M. Stallings Vice President-Power Supply and Production Operations cc: Director, Office of Inspection and Enforcement 1367 285