Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19210D178 + (02:38:26, 5 January 2025)
- ML19210D176 + (02:38:28, 5 January 2025)
- ML19210D174 + (02:38:29, 5 January 2025)
- ML19210D172 + (02:38:30, 5 January 2025)
- ML19210D171 + (02:38:31, 5 January 2025)
- ML19210D170 + (02:38:32, 5 January 2025)
- ML19210D169 + (02:38:33, 5 January 2025)
- ML19210D168 + (02:38:33, 5 January 2025)
- ML19210D164 + (02:38:34, 5 January 2025)
- ML19210D161 + (02:38:47, 5 January 2025)
- RAIO-0719-66466, LLC Supplemental Response to NRC Request for Additional Information No. 401 (Erai No. 9447) on the NuScale Design Certification Application + (02:38:48, 5 January 2025)
- ML19210D157 + (02:38:51, 5 January 2025)
- ML19210D155 + (02:38:52, 5 January 2025)
- ML19210D152 + (02:38:52, 5 January 2025)
- ML19210D150 + (02:38:53, 5 January 2025)
- 05000321/LER-1979-086-03, /03L-0:on 791027,secondary Containment Violated by Simultaneous Opening of Airlock Doors Between Reactor Bldg & Radwaste Bldg.Caused Y Design Deficiency.Interlocking Scheme Under Review + (02:38:54, 5 January 2025)
- ML19210D147 + (02:38:56, 5 January 2025)
- ML19210D146 + (02:38:57, 5 January 2025)
- ML19210D145 + (02:38:57, 5 January 2025)
- ML19210D144 + (02:38:58, 5 January 2025)
- ML19210D143 + (02:38:59, 5 January 2025)
- ML19210D142 + (02:39:00, 5 January 2025)
- ML19210D140 + (02:39:01, 5 January 2025)
- ML19210D141 + (02:39:01, 5 January 2025)
- 05000321/LER-1979-086, Forwards LER 79-086/03L-0 + (02:39:03, 5 January 2025)
- ML19210D137 + (02:39:04, 5 January 2025)
- ML19210D135 + (02:39:05, 5 January 2025)
- ML19210D134 + (02:39:06, 5 January 2025)
- 05000334/LER-1979-043-03, /03L-0:on 790301,during Period Mar-Sept 1979, Analysis of Diesel Fuel Not Completed within Specified Time. Caused by Incomplete Instructions for Modes 5 & 6.Chemistry Manual Revised to Clarify Sampling + (02:39:07, 5 January 2025)
- ML19210D132 + (02:39:08, 5 January 2025)
- ML19210D131 + (02:39:09, 5 January 2025)
- ML19210D130 + (02:39:10, 5 January 2025)
- ML19210D129 + (02:39:10, 5 January 2025)
- ML19210D128 + (02:39:11, 5 January 2025)
- 05000334/LER-1979-043, Forwards LER 79-043/03L-0 + (02:39:12, 5 January 2025)
- ML19210D125 + (02:39:13, 5 January 2025)
- ML19210D124 + (02:39:14, 5 January 2025)
- ML19210D120 + (02:39:15, 5 January 2025)
- ML19210D122 + (02:39:15, 5 January 2025)
- ML19210D119 + (02:39:16, 5 January 2025)
- 05000366/LER-1979-116-03, /03L-0:on 791025,HPCI Steam Line Inboard Valve Failed to Isolate During Calibr & Testing.Caused by Conservative Setting of Torque Switch.Engineering Package Review Revealed That Higher Setting Should Be Used + (02:39:17, 5 January 2025)
- ML19210D117 + (02:39:19, 5 January 2025)
- ML19210D115 + (02:39:20, 5 January 2025)
- 05000313/LER-1979-019-03, /03L-0:on 791012,condensate Isolation Valve CV-1065 to Quench Tank Failed to Close from Control Panels C-16 & 18.Caused by Burnt Out Solenoid Coils.Replaced AC Coils by Coils & Tested Valve + (02:39:22, 5 January 2025)
- 05000366/LER-1979-116, Forwards LER 79-116/03L-0 + (02:39:24, 5 January 2025)
- ML19210D111 + (02:39:28, 5 January 2025)
- ML19210D110 + (02:39:29, 5 January 2025)
- 05000325/LER-1979-074-03, /03L-0:on 791019,reactor Scram Received from High Radiation Signal on Main Steam Line High Radiation Monitors. Caused by Resin Injection from Reactor Water Cleanup Sys.Sys Depressurized + (02:39:31, 5 January 2025)
- ML19210D108 + (02:39:33, 5 January 2025)
- 05000313/LER-1979-019, Forwards LER 79-019/03L-0 + (02:39:34, 5 January 2025)
- ML19210D104 + (02:39:35, 5 January 2025)