Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20033G253 + (14:10:14, 20 December 2024)
- ML20033G252 + (14:10:16, 20 December 2024)
- ML20033G251 + (14:10:17, 20 December 2024)
- ML20033G250 + (14:10:18, 20 December 2024)
- ML20033G249 + (14:10:19, 20 December 2024)
- ML20033G248 + (14:10:20, 20 December 2024)
- ML20033G247 + (14:10:21, 20 December 2024)
- ML20033G246 + (14:10:22, 20 December 2024)
- ML20033G245 + (14:10:23, 20 December 2024)
- ML20033G244 + (14:10:24, 20 December 2024)
- ML20033G223 + (14:10:28, 20 December 2024)
- ML20033G215 + (14:10:35, 20 December 2024)
- ML20033G187 + (14:10:39, 20 December 2024)
- ML20033G186 + (14:10:40, 20 December 2024)
- ML20033G185 + (14:10:47, 20 December 2024)
- ML20033G184 + (14:10:48, 20 December 2024)
- ML20033G182 + (14:10:50, 20 December 2024)
- ML20033G167 + (14:10:58, 20 December 2024)
- ML20033G091 + (14:11:16, 20 December 2024)
- ML20033G025 + (14:11:26, 20 December 2024)
- ML20033G016 + (14:11:28, 20 December 2024)
- ML20033G012 + (14:11:31, 20 December 2024)
- TAC:76360 + (14:11:33, 20 December 2024)
- ML20033G010 + (14:11:33, 20 December 2024)
- ML20033G008 + (14:11:35, 20 December 2024)
- ML20033F991 + (14:11:38, 20 December 2024)
- ML20033F983 + (14:11:40, 20 December 2024)
- 05000425/LER-1990-001-03, :Surveillances Performed on 900103 & 0201 Failed to Meet Requirements of Tech Specs 4.6.1.1.a.Caused by Personnel Misled to Believe That Only 2 of 41 Items Verified.Sts Revised + (14:11:42, 20 December 2024)
- ML20033F979 + (14:11:43, 20 December 2024)
- ML20033F977 + (14:11:44, 20 December 2024)
- ML20033F976 + (14:11:46, 20 December 2024)
- ML20033F953 + (14:11:48, 20 December 2024)
- ELV-01291, Forwards Updated FSAR for Vogtle Electric Generating Plant. Revs Include Changes to Reflect Info & Analyses Submitted to NRC as Well as Changes Made Under Provisions of 10CFR50.59 Through 890930 + (14:11:49, 20 December 2024)
- PNO-V-90-015, on 900327,contract Radiological Svcs Technicians Established Picket Lines at Region V Plants. Approx One Third of Workers Not Showing Up for Work.Affected Licensees Rescheduling Work to Minimize Effect + (14:11:52, 20 December 2024)
- ML20033F946 + (14:11:53, 20 December 2024)
- ML20033F945 + (14:11:54, 20 December 2024)
- ML20033F943 + (14:11:55, 20 December 2024)
- ML20033F942 + (14:11:56, 20 December 2024)
- ML20033F940 + (14:11:57, 20 December 2024)
- ML20033F935 + (14:11:59, 20 December 2024)
- 05000325/LER-1990-003-02, :on 900302,HPCI Sys Declared Inoperable to Stop Leak on Steam Supply Drain Line.Caused by Severe Steam Erosion at 90 Degree Elbow.Involved Section of Piping Replaced on Units 1 & 2 + (14:12:00, 20 December 2024)
- ML20033F933 + (14:12:02, 20 December 2024)
- 05000324/LER-1989-014, :on 890910,leakage of Outer Drywell Seal Beyond Measurement Capacity of Test Equipment.Caused by Combination of Increased Drywell Temp & Use of Nickel Never-Seez.Drywell Head Gasket Seals Replaced + (14:12:03, 20 December 2024)
- 05000298/LER-1990-002, :on 900303,actuation of ESF Group Isolations Occurred.Caused by Design Characteristics & Required Trip Sys Setting.Reactor Vessel Water Levels Recovered Through Operation of Feedwater Sys & Isolations Reset + (14:12:06, 20 December 2024)
- ML20033F928 + (14:12:07, 20 December 2024)
- ML20033F927 + (14:12:09, 20 December 2024)
- ML20033F926 + (14:12:10, 20 December 2024)
- ML20033F922 + (14:12:11, 20 December 2024)
- ML20033F921 + (14:12:13, 20 December 2024)
- ML20033F919 + (14:12:14, 20 December 2024)
- ML20033F918 + (14:12:15, 20 December 2024)