3 L
9 p
l g,~
GPU Nuoleer Corporation L
Nuclear
- e n g a8e j
Forked River,New Jersey 087310388 609 971 4000 I.,
Writer's Direct DialNumber:
n March 19,1990 i/
)
L i
N U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 Gentlemen Subjects Oyster Creek Nuclear Generating Station (OCNGS)
Docket No. 50-219 Generic Letter 89-19 s
h, i
Generic Letter 89-19 addresses.USI A-47 " Safety Implications of Control Systems in LWR Nuclear Power Plants" and concludes that all BWR plants should provide
+
an automatic reactor vessel overfill protection system. As indicated in the Generic Letter, the OCNGS currently does not have such a system. As a result of GPUN's evaluation of Generic Letter 89-19, an automatic resctor vessel overfill protection system which will prevent vessel overfill on a reactor high water level signal will be provided. The overfill protection system will be separate from the feedwater control system in that it will not be powered from
'the same power source, not be located in the same cabinet, and fire protection for the circuits will be'provided by fire wrap.
.The schedule identified in the Generic Letter for implementing any changes is prior to start-up after the first refueling outage, beginning nino months following receipt of the letter. The upcoming OCNGS refueling outage (13R) occurs within that time frame. The outage scope for 13R has been finalized.
As a consequence, installation of the overfill protection system will not be performed'in 13R but will be scheduled in accordance with the Long Range Planning Program. Technical Specification changes, if appropriate, will be addressed upon installation of the overfill protection system.
l t
L 9004040094 900319 l-PDR ADOCK 05000219 l-l g p
PDC GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation i
.e t-Generic Letter 89-19
page 2
.S With respect to reactor vessel overfill and the condensate System, CPUN has reviewed the plant operating procedures and operator training and has determined that sufficient guidance is available to the operators for mitigating reactor vessel overfill events.
If there are any questions please contact Mr. M. W. Laggart at (201) 316-7968.
Sincerely, I
L
)r
- zpatrick k
E.
C.
P Vico resident & Director, te Creek i
EEF/crb i
l Sworn and subscribed to before me this
/h day of 37A4fd.
1990.
/
l NO h1 A&%.Lo Notary Public of New Jersey l
.JI AN A M. De8LASIO i
My Commission Expi-QJERg dos ARY PUBLIC OF N C320482 ces Mr. William T. Russell, Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406
}
i NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, N.J. 08731 Mr. Alex Dromerick U.S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.