Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078R606 + (05:10:42, 15 December 2024)
- ML20078R602 + (05:10:42, 15 December 2024)
- ML20078R598 + (05:10:43, 15 December 2024)
- ML20078R595 + (05:10:44, 15 December 2024)
- ML20078R596 + (05:10:44, 15 December 2024)
- ML20078R592 + (05:10:45, 15 December 2024)
- ML20078R594 + (05:10:45, 15 December 2024)
- ML20078R590 + (05:10:46, 15 December 2024)
- ML20078R588 + (05:10:47, 15 December 2024)
- ML20078R586 + (05:10:47, 15 December 2024)
- ML20078R584 + (05:10:48, 15 December 2024)
- ML20078R578 + (05:10:48, 15 December 2024)
- ML20078R576 + (05:10:49, 15 December 2024)
- ML20078R574 + (05:10:49, 15 December 2024)
- ML20078R566 + (05:10:50, 15 December 2024)
- PY-CEI-NRR-1912, Monthly Operating Rept for Jan 1995 for Perry NPP + (05:10:50, 15 December 2024)
- ML20078R557 + (05:10:51, 15 December 2024)
- ML20078R549 + (05:10:52, 15 December 2024)
- RBG-16-275, Interim Deficiency Rept DR-105 Re Electrical Separation Between Reactor Protection Sys & Nuclear Steam Supply Shutoff Wiring within Power Generation Control Complex. Investigation in Progress.Next Rept by 831219 + (05:10:52, 15 December 2024)
- ML20078R531 + (05:10:53, 15 December 2024)
- ML20078R517 + (05:10:53, 15 December 2024)
- ML20078R509 + (05:10:54, 15 December 2024)
- ML20078R512 + (05:10:54, 15 December 2024)
- ML20078R508 + (05:10:55, 15 December 2024)
- ML20078R504 + (05:10:55, 15 December 2024)
- ML20078R503 + (05:10:56, 15 December 2024)
- ML20078R496 + (05:10:57, 15 December 2024)
- ML20078R502 + (05:10:57, 15 December 2024)
- ML20078R476 + (05:10:58, 15 December 2024)
- ML20078R480 + (05:10:58, 15 December 2024)
- ML20078R464 + (05:10:59, 15 December 2024)
- ML20078R471 + (05:10:59, 15 December 2024)
- ML20078R459 + (05:11:00, 15 December 2024)
- ML20078R452 + (05:11:01, 15 December 2024)
- ML20078R455 + (05:11:01, 15 December 2024)
- ML20078R442 + (05:11:02, 15 December 2024)
- 05000313/LER-1983-024-03, /03L-0:on 830926,control Rod Assembly 10 Found Misaligned from Group Average by Greater than 9 Inches. Caused by Pole Slippage on Out Command.Control Rod Drive Malfunction Procedure Will Be Revised + (05:11:04, 15 December 2024)
- ML20078R438 + (05:11:05, 15 December 2024)
- RBG-16-293, Interim Deficiency Rept DR-123 Re Mccrosky Sheet Metal HVAC Ductwork Fabrication.Investigation Incomplete. Next Rept Will Be Submitted by 840103 + (05:11:05, 15 December 2024)
- ML20078R408 + (05:11:06, 15 December 2024)
- ML20078R421 + (05:11:06, 15 December 2024)
- ML20078R405 + (05:11:07, 15 December 2024)
- RBG-16-280, Interim Deficiency Rept DR-89.Investigation Re Residual Total Elongation Primary knife-type Disconnect Used on Standby Diesel Generator Incomplete.Interim or Final Status Rept Expected by 831215 + (05:11:07, 15 December 2024)
- ML20078R400 + (05:11:08, 15 December 2024)
- ML20078R397 + (05:11:09, 15 December 2024)
- ML20078R398 + (05:11:09, 15 December 2024)
- BVY-94-127, Transmits Addl Drawings Re ISI Program Review + (05:11:10, 15 December 2024)
- ML20078R357 + (05:11:10, 15 December 2024)
- ML20078R337 + (05:11:11, 15 December 2024)
- ML20078R329 + (05:11:11, 15 December 2024)
- B14203, Proposed Tech Specs Re Flood Protection Consistent at Plant for Each Unit + (05:11:12, 15 December 2024)
- ML20078R327 + (05:11:12, 15 December 2024)