Text
c i
OPERATING DATA REPORT DOCrET NO 50-369 DATE teceeber 15. 1994 OPERATING STA105 COMPLETED BY-R.A. Willians TELEFHONE 704-382-5346
!. Unit Names McGuire 1
- 2. Reporting Periods November 1, 1994-November 30,1994
- 3. Licensed Thersal Power (MWth 3411
- c. Naseplate Rating (Bross MWels' 13054 Notes *Naseplate Rating
- 5. Design Electrical Rating (Net MWe):
1190 (Gross MWel calculated as
- 6. Marious Dependable Capacity (Gross MWe b
!!71 1450.000 MVA r.90 power
- 7. Manteue Dependable Capacity (Net MWel:
1129 factor per Page lit,
- 9. If Changes Occur in Capacity Ratings (! tees Nusber 3 through 71 Since Last N'JRES-0020.
Report. Give Reasons:
- 9. Pcwer Level To Which Restricted. If Any (Net NWe b
- 10. Reason For Restrictions, if any i
I This Month Yr.-to-Date Cumulative
!!. Hours in Reporting Period 720.0 8016.0
!!3952.0 l
- 12. Nusber Of Hours Reactor Was Critical 720.0 5594.9 79615.4~
- 13. Reactor Reserve Shutdown Hours
- ' --0--
--0--
- 10. Hours Generator On-Line 720.0 5549.2 78768.7
{
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross Thereal Energy Benerated (MWH1 2451277 18564767 245289f,03
- 17. Gross Electrical Energy Benerated IMWH) 846371 6310543 6427269B
- 19. Net Electrical Energy Generated (MWH)
Blat 03 6028162 E0462332
{
- 19. Unit Service Factor 100.0 69.2 69.1
- 20. Unit Availability Factor 100.0 69.2 69.1
- 21. Unit Capacity Fattor (Using MDC Net) 100.2 66.6 61.5
- 22. Unit Capacity Fatter (Using DER Net) 95.8 63.7 59.8
- 23. Unit Forced Outage Rate 0.0 18.0 14.6
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Ceasercial Operatienh Forecast Achieved INITIAL CRITICALITY IN!!IAL ELECTRICITY COMMERCIAL OPERATION 9412270056 941215 PDR ADOCK 05000369 R
'I i
4.,
OFERATING DATA REPORT DOCKET N0 _ 50-369 UNii 3cQgirei DATE December 15.129L, COMPLETED BY R.A. Willians TELEPHONE 704-382-5346 MONTH November. 1994 t
[,Ay, AVERABE DAILY POWER LEVEL M
AVERAGE DAILY POWER LEVFL
(
(MWe-Net)
(MWe-Net)
I 1129 17 1127 2
1129 18 1127 3
1129 19 1129 4
1131 20 1130 3
1132 21
!!30 6
!!33 22 1131 7
1129 23 1131 8
1131 24 1131 9
1132 25 1134
. 10 1132 26 1134 1130 27 1134 12 1131 28 1132 13 1131 29 1134 14 1130 30 11j3 15
!!28 i
16 -
1127 I
.i s
.. ~. -
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME nwuins 1 DATE leftaf39 REPORT MONTH November 1994 COMPLETED BY
- r..
a.
william.
TELEPHONE
( i u e ; - a a e - s a e o-(1)
{2)
(4)
(5) 3 E
HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S Forced eason:
ethod:
ibit G -
nstructions A-Eq\\11 ment FailureB-Mainkenanceortest(Explain)
S Scheduled 1-Manual EntrySkaratonofData for Pre eets For Licensee 2-Manual Scram C-Refueling 3-Automatic Scram Eyent R_eport (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUKEG-0161)
E-ODeVator Training & License Examination F-Ahinistrative (5)
G-Operator Error (2~4 plain)
Exhibit I - Same Source H-Other (Explain) l i
l I
l i
DOCKET: 50-369 UNIT: McGuire 1 Date;.12/15/04 NARRATIVE Sth. ARY MONTH: November 1994 McGuire Unit 1 began the month of November operating at 100% full power. The unit operated at or near 100% full power for the entire month.
Prepared by: R. A. Williams Telephone (704)-382-5346 1
1
)
l
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: McGuire, Unit 1 2.
Scheduled next refueling shutdown: December 1995 3.
Scheduled restart following refueling: January 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 111 (b) in the spent fuel pool: 655 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE:
December 15, 1994 Name of
Contact:
R.
A. Williama Phone:
(704)-382-5346
r OPERATINS DATA REPORT DOCKET NO 50-370 DATE presber 15.1994 OPEFATING STATUS COMPLETED Bi R.A. Williaes TELEPHONE 704-382-5M6
- 1. Unit Name: McGuire 2
- 2. Reporting Periods November 1, 1994-Novreber 30,1994
- 3. Licensed thersal Power (MWt):
3411
- 4. Naseplate Rating (Gross MWe):
130$*
Notes *Naseplate Rating
- 5. Design ilectrical Rating (Net MWe) -
1160 (Stoss MWel calculated as
- 6. Marious Dependable Capacity (6 toss MWe):
!!71 1450.000 MVA :.90 power' 7.NatiousDependableCapacity(NetMWe):
!!29 factor per Page ill,
- 8. If Changes Occur in capacity Patings (!!ers Nusber 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
9.PowerLevelToWhichRestIicted,IfAny(NetMWe):
- 10. Reason Fct Restrictions, If any:
This Month Yr.-to-Date Cumulative
!!. Hours in Reporting Period 720.0 0016.0 94248.0
- 12. Number of Hours Reactor Was Critical 557.4 7710.7 73552.B
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours Generator On-Line 557.4 7700.4 72584.7 IJ.UnitReserveShutdownHours
- --0--
--0--
le. Gross Thersal Energy Generated (MWH) 1726062 25973427 237845414
- 17. Gross Electrical Energy Generated (MWH) 606593 8998663 83047590
- 19. Net Electrical Energy Generated (MWH) 579373 8659956 79626076
- 19. Unit Service Factor 77.4 96.2 77.0
- 20. Unit' Availability Factor 77.4 96.2 77.0
- 21. Unit Capacity Factor (Using MDC Net) 71.3 95.7 74.0
- 22. Unit Capacity Factor (Using DER Net) 68.2 91.6 71.6
- 23. Unit Forced Outage Rate 0.0 1.9 6.6
- 24. Shutdown Scheduled Over Nest 6 Months (Type, Date, and Duration of Each):
Currently Refueling
- 25. If Shut Down At End Of Report Period. Estiested Cate of Startup: January 10. 1994
- 26. Units in Test Status (Prior to Coseercial Operation):
Forecast Achieved t
!NiilAl CRITICAttfY INITIAL ELECTR kliy COMERCIAL OPERAll0N i
i
c OPERATING DATA REPORT DOCKET NO 50-370 UNIT McGuire 2 DATE Deceeber 15,1994 COMPLETED BY R.A. Willi n i TELEPHONE 704-382-5346 l
MONTH November. 1994 QQ AVERABE DAILY POWER LEVEL QM AVERASE Y POWER LEVEL (MWe-Net)
-Net) 1 1138 17 939 2
1137 la 939 3
1137 19 939 l
4 1139 20 939 5
1138 21 939 6
1139 22 939 7
1135 23 654 8
1139 24 7
9 1140 25 0
10 1139 26 0
11 1135 27 0
12 1132 20 0
13
!!!B 29 0
10 1080 30 0_
15 966 16 939
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
S^-370 UNIT NAME nwuinr4 DATE 12/1s/39___
REPORT MONTH November 1994 COMPLETED BY x.
a.
williana TELEPHONE tius;-Juz-saew (1) 2)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 3
94-11-24 S
162.63 C
1 RC FUELXX END-OF-CYCLE 9 REFUELING OUTAGE a
(1)
(2)
(3)
(4)
F Forced Reason:
Method:
M ibit G - Instructions A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of Data S Scheduled 2-Manual Scram EntW Sneets For Licensee C-Refueling 3-Automatic Scram Event Re rt (LER D-Regulaton Restriction 4-Other (Explain)
File (
EG-0161))
E-Operator Training & License Examination F-Ahinistrative (5)
G-Operator Error (Explain)
M ibit I - Same Source H-0 2er (Explain) l l
l l
F DOCKET: 50-370 UNIT: McGuire 2 Date:
12/15/94 NARRATIVE
SUMMARY
MONTH: November 1994 McGuire Unit 2 began the saanth of November operating at 100% full power. The unit began decreasing power on 11/11/94 at 1330 for end-of-cycle 9 refueling outage. The unit was removed from stervice for end-of-cycle 9 refueling outage on 11/24/94 at 0522. The unit was in the outage the remainder of the month, i
l i
Prepared by: R. A. Williams Telephone (704)-382-5346
e
}!ONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: McGuire, Unit 2 2.
Scheduled next refueling shutdown: Currently Refueling 3.
Scheduled restart following refueling: January 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Importe.nt licensing consid3 rations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in denign or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: All 8.
Present licensed fuel pool capacity: 1463 l
Size of requested or planned increase:
- 9. Projected date of last refueling which can be accommodated by j
present licensed capacity: December 2003 DUKE POWER COMPANY DATE:
December 15, 1994 Name of
Contact:
R.
A.
Williams Phone:
(704)-382-5346 1
- - - - -