ML20078R517
| ML20078R517 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/28/1983 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 85, W3K83-1663, NUDOCS 8311150183 | |
| Download: ML20078R517 (2) | |
Text
..
9 N
a Louisiama
-~"1 POW E R & LIG HT/Waterford 3 SES/P. O. Box B/Killona, LA 70066 UTIUEES SY T M October 28, 1983 W3K83-1663 Q-3-A35.07.85 khhh(
Mr. John T. Collins Regional Administrator, Region IV
[~
U. S. Nuclear Regulatory Commission ih NUV
'31983 611 Ryan Plaza Drive, Suite 1000 g
j Arlington, Texas 76012 g
iWJ
REFERENCE:
LP&L letter W3183-0249 dated July 28, 1983
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 85
" Damage To Incore Instrumentation Guide Tubes" Second Interim Report The above referenced letter indicated submittal of an interim on Final Report to the USNRC on October 31, 1983.
At the present time, all hardware corrective action is completed.
Verification of the supporting documentation is scheduled to be completed by the end of November 1983.
A final report will be submitted to the USNRC on December 20, 1983.
Very truly yours, T. F. Gerrets Quality Assurance Manager TFG:CNH:VBR cc: Director
(
Office of Inspection & Enforcement 1
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8311150183 831028 PDR ADOCK 05000382 S
... A*
ro.
.TO: John T. Collins October 28, 1983 W3K83-1663 Page 2 cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr.
E.-L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 t
i l
.l