-OPERATING DATA REPORT DOCKET NO-50-255 DATE 11-8-83' COMPLETED BY AFDienes TELEPHONE'(616)764-8913
OPERATING STATUS Notes 1.
' Unit:Name:-Palisades 2.
Reporting Period:
831001-831031
> 3t
. Licensed Thermal-Power (MWt):
2530 4.'
Nameplate Rating (Gross MWe):
811.7 5.
Design Electrical Rating (Net MWe):
805 6.
Maximum. Dependable Capacity (Gross MWe): *675 7.
Maximum Dependable Capacity (Net MWe):
- 635 8.
If Changes,0ccur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:
9.
Power Level to Which Restricted, if any-(Net MWe):
10.
Reasons for Restrictions, if any:
This Month Yr-to-Date Cumulative 11.
Hours In Reporting Period 745 7296 104,031 12.
Number of Hours Reactor Was Critical 0
5336.7 59,259.7 13.
Reactor Reserve Shutdown Hours 14.
Hours Generator On-Line 0
5283.6 56,278.5 15.
Unit Reserve Shutdown Hours
- 16.. Gross. Thermal Energy Generated (MWH) 0 12,723,432 115,360,224 17.
Gross Electrical Energy Generated (MWH) 0-3,980,520 35,750,440 18.
Net Electrical Energy Generated (MWH) 0 3,769,958 33,628,014 19.
Unit Service Factor 0
72.4 54.1
, 20.
Unit Availability Factor 0
72.4 54.1 21.
Unit Capacity Factor (Using MDC Net) 0 81.4 50.9 22.
Unit Capacity Factor (Using DER Net) 0 64.2 40.2
- 23.
UnitLForced Outage Rate 0
1.7 32.4 24.
Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):
25.
If Shut Down at End of Report Period, Estiamted Date of Start Up:
1/11/84
- 26.
Units in Test Status-(Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Btged on condenser backpressure.
~'
1 mil 083-0092A-TC03 EK311150179 831106 i
p1 PDR ADOCK 05000255 i
R-PE@
t t
)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 11/08/83 COMPLETED BY AFDienes TELEPHONE (616)764-8913 MONTH-OCTOBER 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
-3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28.
0 13 0
29 0 0 30 0
15 0
31 0
16 0
1 INSTRUCTIONS j
On this format, list the average daily unit power level in MWe-Net for each
-day in the reporting month. Compute to the nearest whole megawatt.
MI1O83-0091A-TC03
s o
SUMMARY
OF OPERATING EXPERIENCE FOR OCTOBER 1983 The Plant remained shutdown for refueling.
mil 083-0096A-TC03
'a
@ Consumers Power Company Pellendes Nuclear Plant: Route 2, Box 154, Covert, MI 49043 November 8, 1983 s
US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of October, 1983.
L Dewey VanDenBerg Acting Reactor Engineer CC: DMKennedy, Palisades JGKeppler, USNRC JRSchepers, P24-314 DJVandeWalle, P24-614B RMKrich, Palisades Resident Inspector, Palisades DLHackett,- P11-228B LTPhillips, P21-319 DEVanFarowe, Div of Radiological IIealth, Lansing, Michigan SMierzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr, Palisades Records Center, INPO, Atlanta, GA PSepcenko, CE, Palisades RLRosenfeld, P26-204A Document Control, 950*22*35*10/L DV:83*067 x
OC1083-0100A-TC03
__