ML20078R596
| ML20078R596 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 02/13/1995 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20078R600 | List: |
| References | |
| NUDOCS 9502230043 | |
| Download: ML20078R596 (2) | |
Text
W clation Support Descriment
- , =
1 a
- PECO ENERGY Zi, a-llJa;L,,
965 chesterbrook Boulevard.
i Wayne, PA 19087-5691, l
l f
February 13,1995 l
l Docket Nos. 50-277 50-278 i
License Nos. DPR-44 l'
DPR-56 l
I
^
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington,DC 20555
Subject:
Peach Bottom Atomic Power Station, Units 2 and 3 Technical SpeclRcations Change Request No. 94-15 i
Reference:
Letter G. A. Hunger, Jr. to U. S. Nuclear Regulatory Commission, dated October 25,1994 i
Der.r Sir:
i in the referenced letter, PECO Energy Company (PECO Energy) submitted an Exigent Technical Specifications Change Request (TSCR) No. 94-15 to request a change to the
- testing requirementsof the High Pressure Coolant injection System (HPCl). Exigent pic-::::'rs.
i of this TSCR was requested becausewe wanted to quickly clarWy an ambiguous statement in the i
PBAPS TS.
The attached TS are ready for publication, and are the same as the marked-up pages submitted in the referenced letter, with one minor clarification. The proposed Bases on TS page 141 have been modilled to accurately reference tte Maeed surveillance requiremera Because of this -
clarWication, we are submitting these pages under oath or affirmation. This clarification does not affect the finding of no signincant hazards that was submitted in the referenced letter, if you have any questions please feel free to contact us.
Very truly yours, 4
b d. L -}.
G. A. Hunger, Jr., g Director - Licensing
Enclosures:
Affidavit, Attachment 1 cc:
T. T. Martin, Adrrfnistrator, Region I, USNRC W. L Schmidt, USNRC Senior Resident inspector, PBApS
$h R. R. Janal, Coirt.nonwealth of Pennsylvania i((
m
,,o m oo 050002 7 PDR,ADOCK p
P
=.
L',
l COMMONWEALTH OF PENNSYLVANIA '
ss.
3 COUNTY OF CHESTER W. H. Smith, lit, being first dtdy swom, deposes and says:
That he is Vice President, Station Support, of PECO Energy Company; the Applicant herein; that l
he has read the attached Technical Specifications Change Request for Peach Bottom Facility Operating Ucenses DPR44 and DPR-56, and knows the contents thereof; and that the statements and matters set 1
l forth therein are true and correct to the best of his knowledge,information and belief.
)
"Y
\\
Vice President
//
-i Subscritaland swom to before me this f day of
- 1995, 9
?/-
~.
Notary Pyblic NdansScd EHcs A SmtonJKray Pubre ThKfyffnnTS,CNew Courty My ConvreAriExamsJJy 10.1995