Text
',[
l ~:%- ,, --
p ;% ,.
r , \s' IMelbwerComparty .l F
ni* . DecMc Center - }
Q P.0 Box 1006 ^
Charlotte,NC2820H006
}
l.. '
i Y- DUKEPOWER .
6 ;
February 15, 1995 j I: l U.S.. Nuclear Regulatory Commission l Attention: Document Control Desk )
Washington,.D.C. 20555 RE: McGuire Nuclear Station )
-Docket No. 50-369 and -370 .j
Dear Sir:
4 Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of January, 1995. ..
i Very truly yours, j R. L. Weber, Manager Nuclear Business Support t
RLW/ raw
' Attachments.
I xc Steward D. Ebneter C/0 Mark Lessor V. Nerses, Project Manager '
Regional Administrator / Region II office of Nuclear Reactor Regulation ;
U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission I 101 Marietta Street, NW, Suite 2900 Washington, D.C. 20555 -j Atlanta, GA 30323 !
I INPO Records Center Ms. Margaret Aucoin i Suite 1500 Nuclear Assurance Corporation 1100 circle 75 Parkway Suite 200 ,
Atlanta, GA 30323 655 Engineering Drive '
Norcross, GA 30092-2843
-i American Nuclear Insurers George Maxwell !
c/o Dottie Sherman, ANI Library Senior Resident Inspector i Town Center, Suite 300S McGuire Nuclear Station !
29 South Main Street West Hartford, CT~ 06107-2445 i
i i
99 00U.
M ***
/ h 9502230036 950131 PDR ADOCK 05000369 I R PDR- 1 k I
1 File GS-801.01 ;
U.S. NRC - McGuire i February 15, 1995 Page 2 bc K. S. Canady (EC08H)
- 7. E. Mooney (EC05N)
B. J. Horsley (ECO3U)
E. C. Fisher (MG010P)
B. W. Walsh (EC11C)
Judy Smoak (CN00P) i D. R. Groux (ON01VP) )
T. E. Hunter (ON0102) j Candace Paton (PB02L) i G. A. Copp (EC050) (File) i B. T. Faulkenberry (EC07C)
D. E. Bortz (EC08G)
R. C. Norcutt (MG01A)
J. E. Synder (MG01RC) l l
l I
l l
i l
l
.t P
! DPERATINS DATA REPORT DOCKET ND 50-369 DATE Fetuary 15. 1995 pfPLRgTING STATUS COMPLETED BY R.A._Williass TELEPHDNE 704-3B[-5346 1.' Unit Names McGuire i ,
- 2. Reporting Period: Januar* 1, 1995-January 31,1995
' 3. Licensed Thersal Power (MJtli 3411
- 4. Naeeplate Rating (Gross MWe;: 1305v Notes
- Nameplate Rating
- 5. Design Electrical Rating (Net MWe): 1180 (Eross HWel calculated as
- 6. Maxinus Dependable Capacity (Bross MWel: 1171 1450.000 MVA .90 power
- 7. Maximus Dependable Capacity (Net MWels 1129 factor per Page lii,
- 8. If Changes Occur in Capacity Ratings (Itess Nceber 3 Through 71 Since Last NUREG-0020. ,
Report. Give Reasons: .
- 9. Power Level To Which Restricted, if Any (Net MWels l
- 10. Reason For Restrictions, If any: !
This Month Yr.-to-Date Cueulative i
- 11. liours In Reporting Period 744.0 744.0 !!5440.0
- 12. Number of Hours Reactor Was Critical 713.7 713.7 01073.1 s
- 13. Reactor Reserve Shutdown Hours - --0-- --0--
- 14. Hours Benerator On-Line 704.5 704.5 80217.1
- 15. Unit Reserve Shutdown Hours --0-- --0-- --0--
- 16. Bross Thermal Energy Generated (MWH) 2373265 2373265 250195691
- 17. Gross Electrical Energy Generated (MWH1 B20915 820915 85972638
- 19. Net Electrical Energy Generated (MWH) 788281 7892B1 B2095649
- 19. Unit Service Factor 94.7 94.7 69.5
- 20. Unit Availability Factor 94.7 94.7 69.5
- 21. Unit Capacity Factor (Using MDC Neti 93.8 93.B 62.0
- 22. Unit Capacity Factor (Using DER Net) 89.9 29.9 60.3 '
- 23. Unit Forced Outage Rate 5.3 5.'J 14.4 l
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None i
- 25. If Shut Down At End Of Report Period. Estisated Date ef Startup l
- 26. Units in Test Status (Prior to Comaercial Operation): Forecast Achieved l
l INITIAL CRITICALITY l INiilAL ELECTRICITY COMMERCIAL 0FERATION l l
i
9.
e p OPERATING IATA REPORT DDCrET NG 50-369 UNii McGuire 1 DATE February 15. 1995 COMPLETED BY P.A. Willises TELEPHONE 704-382-5346 MONTH Jancery. 1995 Qfl- AVERASE DAILY POWER LEVEL El AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)
! 1139 17 1138 .
2 1138 18 1139 3 1134 19 1139 4 1129 20 1140 5 1127 El 1139 6 !!27 22 1139
?
7 1135 23 1139 l
9 1133 24 1139 9 1133 25 !!39 10 1133 26 1139 11 1133 27 !!38 12 1136 2B 1139 13 !!37 29 062 14 1137 30 0 i 15 1130 31 207 16 1139
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME mu u mm. A DATE- ue /13 / 'J a ,
REPORT MONTH January 1995 COMPLETED BY x. a. w1Lulans TELEPHONE (suoj-Jaz-saen (1) 2) 3 (4) (5)
E HOD T A OF LICENSE -
N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE, CODE PREVENT RECURRENCE 1 95- 1-29 F 39.53 A 1 HH VALVEX REACTOR MANUALLY TRIPPED DUE TO 'D' STEAM GENERATOR MAIN FEEDWATER CONTAINMENT ISOLATION VALVE 1-P 95- 1-31 F --
A --
HH PUMPXX SWAPPING CONTROL OIL FILTER ON '1A' FEEDWATER PUMP (1) (2) (3) (4)
F Forced Reason
- Method: Exhibit G - Instructions S Scheduled A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scpam Event Report (LER D-Regulatory Restriction , , 4-Other (Explain) File (N W EG-0161))
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)
. - . _ . - . _ - _ __ _ _ _ __ _ - . _ - _ _ _ _ . . . . . _ . _ . - _ . . - . . . . ~ . _ . __ .-
4 _ -
I_
i
'F , .,
1
, e t, .
t, V:
DOCKET: 50-369 l
UNIT: McGuire 1 N Date: 02/15/95 l
?
l NARRATIVE
SUMMARY
l MONTH: January 1995 McGuire Unit 1 began the month of January operating at 100% full power. The unit'
. operated at or near 100% full power until 01/29/95 at 1822 when the reactor was i manually tripped due to 'D' steam generator main feedwater containment isolation !
valve (ICF-26) failed closed. The unit returned to service on 01/31/95 at 0954. j
-During power escalation, the-unit held from 1812 at 53% power _for the remainder of i the month due to swapping control oil filter on '1A' feedwater pump.
I t
l, i
i l
1 1
'l I
l l
l l
1 l
l l
Prepared by: R. A. Williams Telephone: (704)-382-5346 i
'I I
i I
MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility name: McGuire, Unit 1
- 2. Scheduled next refueling shutdown: December 1995
- 3. Scheduled restart following refueling: January 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the cores lil (b) in the spent fuel pool 651
- 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increases ---
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE: February 15, 1995 ;
I N me of
Contact:
R. A. Williams Phone (704)-382-5346
s
.. j
\
OPERATING DATA REPORT 4 i
l l
DOCKET NO 50-370 j DATE February 15. 1995 !
OPERATING STATUS COMPLETED BY R.A. Willines ,
TELEPHONE 704-382-5346 )
- 1. Unit h ee: McGuire 2
- 2. Reporting Period: January 1, 1995-January 31,1995
- 3. Licensed Thernal Power (MWil: 3411
- 4. h eeplate Rating (6ross MWel 1305e Notes eNameplate Rating
- 5. Besign Electrical Rating (Net MWe): 1180 16ross MWel calculated as 1
- 6. Maxisum Dependable Capacity (Bross MWe): 1171 1450.000 MVA .90 power l
- 7. Maxisua Dependable Capacity (liet MWe): !!29 factor per Page iii, '
- 8. If Changes Dccur in Capacity Ratings (Itess Nusber 3 Through 7) Since Last NURES-0020.
Report. Give Reasons:
1
- 9. Power Level To Which Restricted, if Any (Net MWels l
- 10. Reason For Restrictions, if any:
l l
l This Month Yr.-to-Cate Cumulative i
!!. Hours in Reporting Period 744.0 744.0 95736.0
- 12. Number Of Hours Reactor Was Critical 523.4 523.4 74076.2
- 13. Reactor Reserve Shutdown Hours - --0-- --0--
- 14. Hours Generator On-Line 477.3 477.3 73061.9- l
- 15. Unit Reserve Shutdown Hours --0-- --0-- - 16. Gross Thermal Energy Generated (MWH) 1510651 1510651 239356065 ;
- 17. Gross Electrical Energy Generated (MWH) 526923 526923 83574521 !
- 18. Het Electrical Energy Generated (MWH) 500273 500273 80122619 l
- 19. Unit Service Factor 64.2 64.2 76.3 i 20.UnitAvailabilityFactor 64.2 64.2 76.3 1
- 21. Unit Capacity factor (Using MDC Net) 59.6 59.6 73.3 l
- 22. Unit Capacity Fatter (Using DER Net) 57.0 57.0 70.9
- 23. Unit Forced Outage Rate 0.0 0.0 6.6
- 24. Shutdown Scheduled Over Next 6 Menths (Type, Date, and Duration of Eachl None j
- 25. If Shut Down At End Of Report Perled. Estia.ated Date of Startap:
- 26. Units In Test Status (Prior to Cosa m ia! Operation): Forecast Achieved INii!AL CRn lCALITy INITIAL ELECTRICITY COMMERCIAL DPERATION l
OPERAi!NB DATA REPDRT ;
e DOCKET ND 50-370 i
UNIT McGuire 2 DATE February 15. 1995 COMPLETED BY R.A. Willises IELEPHONE 704-302-5346 MDNTH h nuary 1995 I
-E AVERASE DAILY POWER LEVEL M AVERASE DAILY POWER LEVEL (MWe-Net) (MWe-Met) 1- 0 17 !!41
'2 0 10 !!47 3 0 19 !!50 4' 0 20 1151 5 0 21 1150 6 0 22 !!51 7 0 23 1152 8 0 24 1152 9 0 25 1153 10 0 E6 1153 11 0 27 1153 12 139 2B 1154 13 507 29 !!51 14 912 30 1148 ,
15 1075 31 1152 16 !!46
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME n u , vin s e DATE uz/lofwo ,
REPORT MONTH January 1995 COMPLETED BY n. a. winulans TELEPHONE tivej-Jaz-nase (1) 2) g_ (4) (5)
E HOD T A OF LICENss '
N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 1 95 1 S 266.75 C --
RC FUELXX END-OF-CYCLE 9 REFUELING OUTAGE 1-P 95- 1-12 F --
B --
CH XXXXXX AUXILIARY FEEDWATER FLOW BALANCE TESTING 2-P 95- 1-12 S --
B --
RC FUELXX CORE FLUX MAPPING 3-P 95- 1-13 S --
B -- RC FUELXX CORE FLUX MAPPING (1) (2) (3) (4)
F Forced S Scheduled Reason-A-Equipment Failure (Explain)
Method:
1-Manual Exhibit G - Instructions for Preparation of, Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram D-Regulatory Restriction , , 4-Other (Explain) Event Report (N W(LER File EG-Ol61))
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)
DOCKET: 50-370 UNIT: McGuire 2 Date: 02/15/95 NARRATIVE
SUMMARY
MONTH: January 1995 McGuire Unit 2 began the month of January in end-of-cycle 9 refueling outage. The refueling outage spanned 48.89 days. The unit was placed on-line 01/12/95 at 0245.
During power escalation, the unit held at 20% power on 01/12/95 from 0445 to 1806 due to auxiliary feedwater flow balance testing. The unit held at 37.5% power from 2325 to 01/13/95 at 0315 and the unit also, held at 76.7% power from 2047 to 01/14/95 at 0051 due to core flux mapping. The unit returned to 100% full power on 01/15/95 at 1655 and operated at or near 100% power the remainder of the month.
Prepared by: R. A. Williams Telephone: (704)-382-5346
g-e e
~
. MONTHLY REFUELING INFORMATION REOUEST 1.' Facility names ggGuire, Unit 2
- 2. Scheduled next refueling shutdown: March 1996
- 3. Scheduled restart following refueling: May 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY.T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
l If yes, what will these be?
If no, has reload design and core configuration been reviewed by ;
Safety Review Committee regarding unreviewed safety questions? i I
- 5. Scheduled date(s) for submitting proposed licensing action and j supporting information. !
- 6. Important licensing considerations (new or different design or supplier, unreviewed dasign or performance analysis methods, ;
significant changes in design or new operating procedures). l 1
- 7. Number of Fuel assemblies (a) in the core: lil l
(b) in the spent fuel pool: 893 !
i
- 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increases ---
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE: February 15, 1995 Name of
Contact:
R. A. Williams Phones (7041-382-5346
i.+
0 McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT Decamber 1994
- 1. Personnel Exposure - ,
The total station liquid release for December has been j compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for December has been compared with the Technical Specifications maximum annual i dose commitment and was less than 10 percent of this limit.
h I