2 OWE R & L1G H T/Waterford 3 SES/P. O. Box B/Killona, LA 70066 U$0$SYS M
October 28, 1983 W3K83-1665 Q-3-A35.07.32
{N@[MkOh i
Mr. John T. Collins Regional Administrator, Region IV i[
3E U. S. Nuclear Regulatory Commission l
t 611 Ryan Plaza Drive, Suite 1000 l
j Arlington, Texas 76012
REFERENCE:
LP&L letter W3183-0296 dated September 2, 1983
Dear Mr,
Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 32
" Stress Analysis For Welding Pipe Support Attachments Was Not Performed Prior To Fabrication" Sixth Interim Report l
The above referenced letter indicated submittal of a Final Report to the USNRC on October 28, 1983.
At the present time, the supporting documentation for the closure of SCD No.32 is dependent on the closure of SCD No.60, which is currently scheduled for mid January 1984.
A final report will be submitted to the USNRC on February 3,1984.
Very truly yours, t
T. F. Gerrets
[
Qualit.y Assurance Manager TFG:CNH:VBR cc: Directce Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8311150106 831028 i
PDR ADOOK 05000382 S
PDR i
J TO: : John T.' Collins October 28, 1983 W3K83-1665 Page 2 cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 a
f 6