Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080G632 + (03:08:26, 15 December 2024)
- 05000362/LER-1983-118-03, /03L-0:on 831229,DNBR Outside Allowable Limits. Caused by Core Operating Limit Supervisory Sys Being Out of Svc.Sys Returned to Svc + (03:08:27, 15 December 2024)
- ML20080G614 + (03:08:28, 15 December 2024)
- DCL-84-026, Ro:On 831215,fire Barrier Wall Between Containment Penetration Area & Auxiliary Bldg Removed.Wall Replaced W/Concrete Barrier for Addl Strength in Event of Steam Pipe Leak Prior to Operation + (03:08:29, 15 December 2024)
- ML20080G607 + (03:08:29, 15 December 2024)
- ML20080G605 + (03:08:30, 15 December 2024)
- ML20080G603 + (03:08:31, 15 December 2024)
- ML20080G602 + (03:08:33, 15 December 2024)
- ML20080G601 + (03:08:34, 15 December 2024)
- ML20080G600 + (03:08:35, 15 December 2024)
- ML20080G599 + (03:08:35, 15 December 2024)
- ML20080G595 + (03:08:36, 15 December 2024)
- ML20080G596 + (03:08:36, 15 December 2024)
- ML20080G592 + (03:08:37, 15 December 2024)
- ML20080G594 + (03:08:37, 15 December 2024)
- ML20080G591 + (03:08:38, 15 December 2024)
- NRC-84-0020, Final Deficiency Rept Re Undetectable Failure of Switch in Relay Testing Circuits of Westinghouse Solid State Protection Sys.Initially Reported on 820903.Equipment Mods Will Be Completed Prior to Fuel Load at Both Plants + (03:08:38, 15 December 2024)
- ML20080G585 + (03:08:39, 15 December 2024)
- ML20080G581 + (03:08:43, 15 December 2024)
- ML20080G568 + (03:08:44, 15 December 2024)
- ML20080G570 + (03:08:44, 15 December 2024)
- ML20080G567 + (03:08:45, 15 December 2024)
- ML20080G565 + (03:08:46, 15 December 2024)
- ML20080G558 + (03:08:46, 15 December 2024)
- 05000362/LER-1983-119-03, /03L-0:on 831227,core Protection Calculator Channel a Failed.Caused by Multipurpose Acquisition & Control Sys Error Code 10.No Corrective Action Taken Since Failure Expected to Occur Occasionally + (03:08:48, 15 December 2024)
- ML20080G556 + (03:08:49, 15 December 2024)
- ML20080G545 + (03:08:50, 15 December 2024)
- ML20080G550 + (03:08:50, 15 December 2024)
- ML20080G543 + (03:08:51, 15 December 2024)
- 05000259/LER-1984-003, :on 840117,one of Three Standby Gas Treatment Trains Had Flow Below Design.Caused by Manual Discharge Dampers on Trains a & C Being Off Marked Positions.Dampers Returned to Proper Positions + (03:08:53, 15 December 2024)
- ML20080G536 + (03:08:54, 15 December 2024)
- ML20080G535 + (03:08:55, 15 December 2024)
- AECM-84-0058, RO 83-116/0:on 831220,smoke Detectors in Zone 2-7 & 1-4 Alarmed & Would Not Reset.Caused by Dust Particles on Ionization Detectors.Zones Reset & Restored to Operability on 840106 & 09 + (03:08:56, 15 December 2024)
- ML20080G531 + (03:08:56, 15 December 2024)
- ML20080G530 + (03:09:00, 15 December 2024)
- ML20080G528 + (03:09:01, 15 December 2024)
- ML20080G527 + (03:09:01, 15 December 2024)
- ML20080G525 + (03:09:02, 15 December 2024)
- ML20080G524 + (03:09:02, 15 December 2024)
- ML20080G523 + (03:09:03, 15 December 2024)
- ML20080G520 + (03:09:04, 15 December 2024)
- ML20080G517 + (03:09:05, 15 December 2024)
- ML20080G516 + (03:09:06, 15 December 2024)
- ML20080G515 + (03:09:07, 15 December 2024)
- ML20080G512 + (03:09:08, 15 December 2024)
- ML20080G511 + (03:09:10, 15 December 2024)
- ML20080G504 + (03:09:11, 15 December 2024)
- ML20080G502 + (03:09:12, 15 December 2024)
- ML20080G499 + (03:09:13, 15 December 2024)
- ML20080G498 + (03:09:14, 15 December 2024)
- ML20080G495 + (03:09:14, 15 December 2024)
- ML20080G494 + (03:09:15, 15 December 2024)