Text
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _.___
lon !%
STONE & WEBSTER MICHIGAN, INC.
P.O. box 2325. BOSTON. M ASSACHUSETTS O2107
- j{']
_,_,j
._A. i_ _ _
. Q
=(V} YY ufi~~ l- ! Io M Mr. D. L. Quamme February 3, 1984 Consumers Power Company Midland Nuclear Plant 3500 E. Miller Road Midland, Michigan 48640 Subject : Docket No. 50-329/330 Midland Plant - Units 1 and 2 Overview of the CoMtruction Completion Program Serial No. SWMCP-025 Re:
Revisions to BPCo Procedures CPCo Transmittal No. CSC-7216 CIO has reviewed CPCo's response to Meeting Note "D" on Page Two of Weekly Report Number 25 and considers this to be satisfactory.
h
$.W W J.E.harr CIO Program Manager FB/nl CC.:
4 Keppler, US NRC Glen Ellyn, IL JJHarrison, US NRC Glen Ellyn, IL RJCook, US NRC Midland (site)
RAWells, CPCo Midland (site)
RBKelly, S&W APAmoruso, S&W B402130429 840203 bbd
~
d pv0'L-cdj /[,
PDR ADOCK 05000329 1
f l
R PDR
- S CONSUMERS POWER COMPANY
[M MIDLAND RNERGY CENTER 56 330 Transmittal No: CSC-7268 Date:
February 1, 1984 To:. Stone & Webster P O Box 1963 Midland, MI '48640 triCIPAL STAFF g
W.gOPRP 3/RA DE
' ittached Is: '
Partial Response To A/k/
Of443F
<G OfC4A X
Complete Response To pao SCS V
.O cGA
'4 L
^
For Your Information efF~
Filet Q Other
Description:
~
Tracked Information' Item 045.
7
.=
Ar# Signature:
[
cc: JCKeppler ;NRC Region III w/a[
JJHirrison[ NRC-Region III'"w/a RJCook, NRC Site w/a RAWells, MPQAD w/a BHPeck, MEC w/a NIReichel, MEC w/a g
DDJohnson, MEC w/a FEB 8 1984
.)
s 9
Sheet 1 of 1 l HOLD POINT NUMBER ITEM N STONE & WEBSTER 45 CONSTRUCTION IMPLEMENTATION O. TRACKED ACTION ITEM
"^
MIDL AND HUCLEAR PldNT./.0. N0. MSO9
,gACaED ECOr Me D ONITEu REFERENCE (S) CIO Item Number 038 0 UNTRACKEDITEM CPCo Letter:CSC-7134 of January'5,1984 O HOLD POINT NOTIFICATION CONDITION DETAILS The respon_se provided to CIO Item Number 038, copy attached, by the above referenced CPCo letter is not acceptable to CIO. Therefore, Item Number 038 has been closed and this report issued to address.the concern..Without appropriate administrative controls,
~
the tendancy will be for personnel to develop a reliance on checklists rather than the governing procedures and Engineering documents.
If it is your intention to utilize incomplete checklists for portions of the work, CIO needs to know what actions will be taken by CPCo to assure that work is done to Engineering documents and that a reliance on checklists does not develop.
It is also noted that the checklist for FPM-7.000 has been revised to include all procedural items and incorporated as a part of the procedure.
i tpaot X YES NO uo,s ATTACHMENTS D ATE RESPONSE REQ'D.
INITIATO /DATE INITI TION PPROVED/DATE Jan. 27, 1984 h/B~SV 4
h/ 67 -8V
RESPONSE
Reference attached letter CSC-7221 dated January 26, 1984.
(PAGE YES N o.* s s NO ATTACHMENTS EST. CORRECTIVE ACTION RESPONDENT TITLE DATE COMPLETION DATE RESPONSE ACCEPTED DATE RESPONSE VERIFIED / CLOSED DATE 6
(
consumers Dean t Quamme
.l g'g She Manager Campany
-aa r,.,n Midland Project PO Box 1963 Midland. MI 48640. ($17) 6318650 w.=
January 26, 1984 Mr G A Hierzer Bechtel Power Corporation P O Box 2167 Midland, MI 48640 MIDLAND ENERGY C?,NTER 7020 CIO OBSERVATION 045 FILE:
Bl.17 UFI:
99*08, 53*50*04, 12*50 SERIAL:
CS.C-7221 Per conversation with Stone & Webster the subject of using checklists in procedures has been clarified.
A's you are aware, the checkl'ist for FPM 7.000 has been revised to include all procedural items and incorporated as part of the procedure.
This re-solved-Stone & Webster's concern in that area.
Any existing procedures which utilize checklists must be reviewed and revised
~
if necessary, to insure the checklist is complete and fully consistant with all requirements of the procedure it is to be used in conjunction with. Any new procedures and related check 1f sts must also conform to these requirements.
It is also requested that each checklist to be used contain a state. tent that it is a memory key aid and not a substitution for the required use of Design Drawings and Specifications.
Please have this completed and reply back by February 24, 1984.
(
DLQ/JPB/s'c d