ML20080G536

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept D/N 49 Re Nonconforming Weld Repair of Beam Cope Burn Cuts.Cb&I Will Complete Investigation & Forwards Results to Ebasco by Apr 1984.Final Rept Expected by 840615
ML20080G536
Person / Time
Site: Satsop
Issue date: 01/31/1984
From: Kohler A
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
D-N-#49, GO3-84-68, NUDOCS 8402130432
Download: ML20080G536 (2)


Text

r

. SECSVED Imc Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 @4 ,rg g g .

GEGiO!J Vyt January 31, 1984 G03-84-68 U. S. Nuclear Regulatory Commission, Region V Office of Inspection and Enforcement 1450 Maria Lane, Suite 260 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

POTENTIAL 10CFR50.55(e) DEFICIENCY NONCONFORMING WELD REPAIR OF BEAM COPE BURN CUTS (D/N #49)

References:

a) Letter, G03-83-583, Docket 50-508, D. E. Dobson to D. M. Sternberg, same subject, dated July 22, 1983 b) Letter, G03-83-870, Docket 50-508, A. D. Kohler to T. W. Bishop, same subject, dated November 8, 1983 Reference a) provided your office with an interim report concerning the subject deficiency. Reference b) subsequently expanded the scope of the deficiency to include Contract 3240-114 and reaffirmed the February 15, 1984 date for submittal of the final report.

Due to the expanded scope of the subject deviation, i.e., inclusion of 114 Contract, Chicago Bridge and Iron (CB&I) has been unable to complete their investigation as planned. Therefore, the February date will not be met. It is anticipated that CB&I will complete their investigation'and[ forward the results to Ebasco by April, 1984Q Supply System /Ebasco Engineering will evaluate the data and provide the final report to you by June 15,1984J Work is currently progressing on inspection and repair of nonconforming burn slot weld repairs. CB&I has increased the NDE effort to expedite the inspection process. Morrison-Knudsen has been retained by CB&I to perform the rebolting and inspection of the beams removed during the rework.

8402130432 040131 PDR ADOCK 05000508 r

8 PDR -['g - ) Ih

c., _

ay, .

1 --

.Mr.'T. W. Bishop. January 31, 1984 1Page 2 G03-84-68

~Should you have any questions or desire further information, please '

contact me directly.

4 A.' D.'Kohler (760)

' Program Director, WNP-3 DRC:nj cc: J. Adams. NESCO

'D. Smithpeter - BPA

~

iEbasco Elma R. D. Hill - PugetfSound Power & Light Company P.lInman - Washington-Water Power Company B. D. Withers - Portland General Electric Company E. M. Burton - Pacific Power & Light Company I.