ML20080G599

From kanterella
Jump to navigation Jump to search
Notifies That Sampling Insps of Const Training Records Performed.Results Satisfactory.Personnel Cleared to Perform Status Assessment
ML20080G599
Person / Time
Site: Midland
Issue date: 02/06/1984
From: Karr J
STONE & WEBSTER, INC.
To: Quamme D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
SWMCP-026, SWMCP-26, NUDOCS 8402130466
Download: ML20080G599 (1)


Text

4

'f STONE & WEBSTER MICHIGAN, INC. l$M1 T/T;7h-f~

i2 P.O. Box 2325. BOSTON. massachusetts 02107 UI; ,L

g. Df ( ?f g33D TLTkedp$l Mr. D. L. Quamme February 6,1984 Consumers Power Company Midland Nuclear Plant 3500 E. Miller Road Midland, Michigan 48640

Subject:

Docket No. 50-329/330 Midland Plant - Units 1 and 2 Overview of the Construction Completion Program Serial No. SWMCP-026 Re: Midland Energy Center Training of Construction Personnel Reference CPCo Correspondence CSC-7191 1/19/84, CSC-7223 1/26/84, CSC-7233 1/26/84, CSC-7248 1/30/84, and CSC-7280 2/3/84 Please be advised that CIO has performed sampling inspections of the Construction Training Records of those personnel noted in the attach-ments of the above referenced correspondence. The results of the sampling inspection were satisfactory. Personnel listed on the.

attachments are cleared to perfom status assessment.

JEK/nl eppler, US NRC Glen Ellyn, IL l JJHarrison, US NRC Glen Ellyn, IL RJCook, US NRC Midland (site)

RAWells, MPQAD Midland (site)

L- NIReichel, CPCo Midland (site)

APAmoruso, S&W RBKelly, S&W 8402130466 840206 FE8 91984 '/o PDR ADDCK 05000329 A PDR pg

- _