Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094A866 + (14:58:33, 13 December 2024)
- ML20094A869 + (14:58:33, 13 December 2024)
- ML20094A860 + (14:58:34, 13 December 2024)
- ML20094A858 + (14:58:35, 13 December 2024)
- ML20094A859 + (14:58:35, 13 December 2024)
- ML20094A856 + (14:58:36, 13 December 2024)
- ML20094A853 + (14:58:40, 13 December 2024)
- ML20094A851 + (14:58:40, 13 December 2024)
- ML20094A843 + (14:58:41, 13 December 2024)
- 05000325/LER-1984-011, :on 840711,control Bldg Emergency Air Filtration Sys Train a Automatically Started Due to Spurious Fire Alarm in Back Panel Area.No Failures or Personnel Involvement Identified + (14:58:43, 13 December 2024)
- ML20094A840 + (14:58:44, 13 December 2024)
- ML20094A839 + (14:58:48, 13 December 2024)
- 05000483/LER-1984-043, :on 840925,four Steam Line Low Pressure Channels Declared Inoperable.Caused by Setpoints on Each lead-log Controller Being Incorrectly Calibr.Incorrect Procedure Revised & Affected Loops Recalibr + (14:58:49, 13 December 2024)
- ML20094A829 + (14:58:50, 13 December 2024)
- 05000333/LER-1984-020, :on 840928,two Reactor Scrams Occurred within 7 H.Caused by Under Vessel Nuclear Instrumentation Connector Bumped During CRD Mechanism Maint in Area.No Permanent Corrective Action Applicable + (14:58:52, 13 December 2024)
- ML20094A820 + (14:58:53, 13 December 2024)
- ML20094A814 + (14:58:54, 13 December 2024)
- ML20094A811 + (14:58:55, 13 December 2024)
- ML20094A809 + (14:58:55, 13 December 2024)
- ML20094A808 + (14:58:56, 13 December 2024)
- ML20094A797 + (14:58:56, 13 December 2024)
- 05000259/LER-1984-027-01, :on 840627,during Startup & at 1% Power & Rated Pressure,Main Steam Relief Valve Began to Unseat,Causing Torus Temp to Approach Limits.Unit Manually Scrammed.Cause Unstated.Valve Replaced & Unit Restarted + (14:58:58, 13 December 2024)
- ML20094A791 + (14:59:00, 13 December 2024)
- ML20094A782 + (14:59:01, 13 December 2024)
- 05000374/LER-1984-035-01, :on 840709,while Troubleshooting Problem W/ Electrohydraulic Sys Signal,Technician Probe Slipped,Causing Momentary Loss of 30-volt Power Supply to Sys.High Pressure Scram Occurred.Trouble Shooting Stopped + (14:59:03, 13 December 2024)
- ML20094A779 + (14:59:04, 13 December 2024)
- ML20094A773 + (14:59:05, 13 December 2024)
- ML20094A770 + (14:59:05, 13 December 2024)
- ML20094A762 + (14:59:06, 13 December 2024)
- 05000237/LER-1984-010-05, :on 840626,during Startup,Feeder Breaker Position in Control Room Lost on Breaker at Bus 29 Which Feeds MCC 28-7 & 29-7.Breaker Inadvertently Tripped.Caused by Loose Wire.Operator Training Conducted + (14:59:08, 13 December 2024)
- ML20094A755 + (14:59:09, 13 December 2024)
- ML20094A752 + (14:59:10, 13 December 2024)
- ML20094A750 + (14:59:11, 13 December 2024)
- ML20094A749 + (14:59:11, 13 December 2024)
- ML20094A741 + (14:59:12, 13 December 2024)
- ML20094A740 + (14:59:13, 13 December 2024)
- ML20094A738 + (14:59:13, 13 December 2024)
- ML20094A736 + (14:59:14, 13 December 2024)
- ML20094A727 + (14:59:15, 13 December 2024)
- ML20094A734 + (14:59:15, 13 December 2024)
- ML20094A726 + (14:59:16, 13 December 2024)
- 05000373/LER-1995-016-03, :on 950924,initiated Manual Reactor Scram Due to Emergency Governor Lockout Valve Sticking.Oil Samples Taken of Supply Oil (Turbine Lube Oil Sys) for 1A & 1B Turbine Driven Reactor Feed Pump for Analysis + (14:59:18, 13 December 2024)
- ML20094A710 + (14:59:19, 13 December 2024)
- ML20094A716 + (14:59:19, 13 December 2024)
- ML20094A708 + (14:59:20, 13 December 2024)
- ML20094A707 + (14:59:22, 13 December 2024)
- ML20094A698 + (14:59:23, 13 December 2024)
- ML20094A703 + (14:59:23, 13 December 2024)
- 05000373/LER-1984-040, :on 840625,in Startup Mode,Reactor Water Cleanup Sys Isolated on High Differential Flow.Caused by Temp & Pressure Differences Between Startup Operations & Instrument Calibr.Procedure Revised + (14:59:25, 13 December 2024)
- ML20094A695 + (14:59:26, 13 December 2024)
- ML20094A693 + (14:59:27, 13 December 2024)
- RBG-19214, Final Deficiency Rept DR-192 Re Three Duct Pieces Fabricated by Mccroskey Sheet Metal.Initially Reported on 840919.Three Duct Pieces Will Be Refabricated to Acceptable Design. Extent of Problem Limited Only to Duct Pieces Identified + (14:59:28, 13 December 2024)