Requests Exemption from GDC 4 Re Fuel Load & Precritical Testing Activities.Exemption Would Allow Completion of RHR Pump/Motor Analyses & Seismic Qualification of Electrical Isolation Sys Prior to Initial Criticality
ML20094A708
Person / Time
Site: Catawba 
Issue date: 07/11/1984
From: Thies A
DUKE POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8408060072
Download: ML20094A708 (3)


Text

2 y

DUXE POWER GoumNY POWER BmLMNG, DOx 03180, GHARLOTTE,N. G. 28242 A. C. T H I L,

(704) 373 4249

'"%% "o7c'.",'o%'"

July 11, 1984 Mr. Harold R. Denton, Director Office Of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Re: Catawba Nuclear Station, Unit 1 Docket No. 50-413

Subject:

Applicants' Application for Partial Exemption from GDC 4

Dear Mr. Denton:

Pursuant to 10 CFR 550.12, Duke Power C >mpany et al.

( Applicants) hereby request an exemption from the rcquirement of 10 CFR Part 50, Appendix A, General Design Criterion (GDC) 4, as such relates to fuel load and pre-critical testing activities.

On May 31, 1984 Applicants provided the staff with information to resolve outstanding seismic qualification issues identified in the meeting held on May 21 and 22, 1984. That letter identified two items that will remain open past the expected fuel load date for Unit 1 at Catawba:

1.

Analyses of the Residual Heat Removal pump / motor.

2.

Seismic qualification of the Electrical Isolation System for Reactor Protection System cabinets.

By letters dated June 20 and June 28, 1984 Applicants requested a partial exemption from GDC 17 in order to permit the diesel generators for Unit 1 to be inoperable until initial criticality.

It is considered that the technical and legal arguments supporting that request also encompass the situation presented in this application in terms of the potential safety impact and the legal basis for granting such an exemption. As noted in our letter of May 31, 1984 Applicants have made a good faith effort to comply with GDC 4 as evidenced by the responses to the staff's outstanding concerns in this area. Therefore, Applicants hereby request that the Commission issue an exemption to GDC 4 that would allow the above referenced items to be completed prior to initial criticality.

Very truly yours,

\\

A.' C. Thies k

jb NAR/slb 8 0 8408060072 840711 i

PDR ADOCK 05000413 A

PDR

'n Mr. Harold R. Denton,- Director July 11, 1984 Page Two cc: Mr. J. P. O'Reilly, Regional Administrator Robert Guild, Esq.

U. S. Nuclear Regulatory Commission Attorney-At-Law

. Region II P. O. Box 12097 101 Marietta Street, NW, Suite 2900 Charleston, South Carolina 29412 Atlanta, Georgia 30323 Mr. Jesse L. Riley Palmetto Alliance Carolina Enviromental Study Group 2135 1/2 Devine Street 854 Henley Place Columbia, South Carolina 29205 Charlotte, North Carolina 28207 NRC Resident Inspector - Catawba i.

I

o A. C..Thies, being duly sworn, states that he is Executive Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this application; and that all statements and matters set forth therein are true and correct to the best of nis knowledge.

A. C. Thies, Executive Vice President Subscribed and sworn to before me this lith day of July,1984.

c6 c. au AL Notary Public My Conmission. Expires:

2.g. l9 8 i