ML20094A820

From kanterella
Jump to navigation Jump to search
Response to ASLB 841018 Request for Info Re Cinching Down U-bolts.Raw Data Supporting Table 2 of 840629 Affidavit of Rc Iotti & Jc Finneran & Certificate of Svc Encl.Related Correspondence
ML20094A820
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/23/1984
From: Horin M
BISHOP, COOK, PURCELL & REYNOLDS, TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
References
CON-#484-975 OL, NUDOCS 8411060557
Download: ML20094A820 (13)


Text

F79 .

.' h

-f OctobekEkc5S84 g.;: .-

'84 00T 25 All:20 UNITED STATES OF AMERICA

  • NUCLEAR REGULATORY COMMISSION CFFIC ,. ,._- ....__ .. nt e '-

C^2 .InG i, ~

.s BEFORE THE ATOMIC SAFETY'AND LICENSING BOARD

/ 0[2J[

In the Matter of )

TEXAS UTILITIES ELECTRIC COMPANY, et al.

)

)

)

Docket Nos. 50-445 and 50-446 OL

) (Application for Operating (Comanche Peak Steam Electric ) Licenses)

Station, Units 1 and 2) )

APPLICANTS' RESPONSE TO BOARD REQUEST FOR INFORMATION REGARDING CINCHING DOWN U-BOLTS On October 18, 1984, Judge Bloch telephoned Ap'plicants requesting that they provide the raw data supporting Table 2 (" Observations of Torques in U-Bolts") in the affidavit of Robert C. Iotti and John C. Finneran, Jr. appended to Applicants' Motion for Summary Disposition of CASE's Allegations Regarding Cinching Down of U-Bolts (June 29, 1984). While Judge Bloch did not specify at that time a date by which such information should be supplied, in the October 18, 1984 Memorandum and Order documenting the call (mailed by the NRC on October 19 and received by Applicants on Octobe- 22), Judge Bloch directed Applicants to provide such information by October 23, 1984.

Applicants have been able to assemble such information'in this short period and append it hereto. However, Applicants request that in the future, should

, there be some urgent nee'd to provide information on an extremely expedited

\

8411060557 ~

gDRADOCKokohfj5 I

c-

-s l schedule, Applicants be given as much notice as possible and some explanation of th'e basis for the expedited schedule.*

, Respectfully submitted, I,hL a.,L &

-v y v y- ,-

Malcolm H. Philips, Jr.

Bishop, Liberman, Cook, Purcell & Reynolds 1200 Seventeenth Street, N.W.

Washington, D.C. 20036

,, (202)857-9829 9

O i

, e

' With regard to instant requests for information, in that Applicants have yet to respond to CASE's answer on the issue of cinching down U-bolts, the urgency of the schedule established is unclear.

9

, - . - , - - , , c --- ,

e BufId1ng Hanger Nunber Pfpe Sfze Torque-Average (ft-IbsI h ector Dullding, HD-507-2 3/4 5 Unit 2 ~

Reactor Building, H)-507-1 3/4 5 Unit 2 Reactor Bullding, K)-964-2 3/4 8.5 Unit 2 Reactor Butlding, M)-995-3-102 3/4 4 Unit 2 Safeguard, Un?t 2 K)-548-1289 1 5.5 Reactor Building, HD-507-1 1 5 Unit 2 ..

Reactor Bo'iding, K)-551-RB-2-71 2 17.5 Unit 2 .

Reactor Bu!Id1ng, 43-551-IE-2-70 2 20 Unit 2 .

Reactor BufIding, H)-827-25K2 2 4.5 Unit 2 Reactor Building, K)-82 7-2.'K 2 2 8 Unit 2 .

Reactor Bullding, K)-827-2 4K2 2 10 Unit 2 Reactor Bo'iding, K)-827-28K2 2 5 Unit 2 Reactor BuIIding, M)-827-27K7 2 5 Unit 2 Reactor Building, K)-827-26K2 2 5 Unit 2 Reactor Building, HD-827-29K2 2 5.5 Unit 2 4 Reactor Building, HD-507-107-R2-2 2 4.5 Unit 2

~ - . _

e

l 2-6 Building Hanger Nunber Pfoe Sire Toroue-Average (ft-lbs)

Reactor Bullding, HD-507-121 2 5.5 Unit 2 Reactor Building, M)-507-108-RB-2 2 7.5 Unit 2 .

Reactor Building, H)-507-105 2 4.5 Unit 2 Reactor Bufiding, K)-507-109-RB-2 2 5 Unit 2 Safeguard, Unit 2 CS2-202-402-552R 3 22.5 Reactor Bu!Idtng, CS2-079-410-C42S 3 12.5 Unft 2 ..

Reactor Building, CT2-053-444-C62K 3 12.5 Unit 2 Reactor Building, CT2-053-444-C62K 3 10.0 Unit 2 .

Safeguard, Unit 2 CS2-318-700-S53R 3 15 Safeguard, Unit 2 CS2-014-401-S52K 3 25 Safeguard, Unft 2 CS2-920-703-553R 3 20 Reac+or Building, DD2-046-404-C56R 3 9 Un's 2 Reactor BufIdIng, CC2-207-420-C53R 3 26.5 Unit 2 Reactor Building, CT2-053-402-C62S 3 25 Unft 2 Reactor Bo'IdIng, WP2-001-416-C46R 3 22 Unit 2 _

Reactor Bufi[llng, Wp2-001-426-C46R 3 30 Unit 2

r. Reactor Bufiding, D02-109-433-C43R 3 21.5 Unit 2
  • %- e%, ,

8

e l

Building Hanger Nunt>er Pfpe Sfze Toroue-Averaoe (ft-Ibs) '

b actor Building, W2-030-422-C46R 3 30 Unit 2' Rsec+or Building, CS2-079411-C42K 3 25 Unit 2 '

Reactor Bullding, CC2-190-401-C52R 4 25 Unit 2 Reactor Building, MS2-150-450-C52K 4 25 Unit 2 Safeguard, Unit 2 AF2-0%-410-S3X 4 35 Safeguard, Unit 2 AF2-103-441 -S5 % 4 20 Safeguard, Unit 2

  • AF2-099-419-S3X 4 12.5 Safeguard, Unl.t 2 AF2-099-419-S3% 4 , 30 Reactor Building, S12-306-425-C42K 4 33.5 Unit 2 .

Safeguard, Un1t 2 AF2-102-423-S535 4 23.5 Safeguard, Unit 2 AF2-102-422-55 % 4 52.5 Safeguard, Unit 2 BR2-018-415-S43R 4 50

  • Safeguard, Unit 2 BR2-018-417-S43K 4 33 Safeguard, Unit 2 CT2-021-405-S 32K 4 44.5 Safeguard, Unit 2 #2-226-429-S36R 4 35 Safeguard, Unit 2 W2-226-414-S36R 4 22.5 Safeguard, Unit 2 #2-226-439-S26R 4 21.5

~

-Safeguard, Unit 2 W2-226-407-S26R 4 40 Safeguard, Unit 2 S12-044-431 -S22 R 4 29 Reactor Building, CC2-193-424-C52 R 4 41.5

5 Unit 2 l

l

J'

,, Butiding Henger Number P1pe Sfze Toroue-Average (ft-lbs)

Reactor Building, CC2-193-423-C52R 4 15 Unit 2 Reactor Building, NG2-151-442-C52K 4 13.5 Unit 2 .

Reactor Building, MS2-151-419-C52R 4 40 Unit 2 Reactor Building, N62-151-440-C52K 4 27.5 Unit 2 Reactor Bufiding, MS2-151-411-C52R 4 7.5 Unit 2 Reactor Building, , 512-306-425-C42K 4 25 5 Unit 2 -

Reactor Building, 512-306-423-C42 R 4 60 Unit 2 Reactor Butiding, S12-306-401-C42R 4 .

35 Unit 2 Reactor Butidlng, S12-306-421-C42R 4 22.5 Untt 2 Reactor Butiding, VD2-053-403-C46R 4 12.5 Unit 2 Reactor Butiding, SI 2-306-402-C42 R 4 27.5 Unit 2 Reactor Building, S12-306-418-C42R 4 50 Unit 2 Safeguard, Unit 2 CT2-021-404-532R 4 18.5 Safeguard, Unit 2 CS2-326-410-S56R 6 24.5 ,

Safeguard, Unit 2 CS2-326-401-556R 6 22 Safeguard, Unft 2 FP-790-9.35 6 42.5

r. Safeguard, Un't 2 FP-7 90-9.351 6 25 l

___ . I 1

9 5-Bufiding Hanger Number Pfpe Size Toroue-Average (f t-lbs)

Safeguard, Unit 2 FP-790-9.352 6 25 Safeguard,, Un't 2 FP-790-9.353 6 35 Safeguard, Unit,2 FP-7 90-9.354 6 20 Safeguard, Unit 2 FP-790-9.355 6 20 Safeguard, Unit 2 FP-790-1051 6 20 Safeguard, Unit 2 FP-790-1052 6 35 Safeguard, Unit 2 FP-790-1151 6 22.5 Safeguard, Unit 2 FP-790-1152 6 to Reactor Building, '. . ; CC2-246-419-C53R 6 10 Unit 2 Reactor Bufiding, CC2-246-423-C53R 6 10 Ustt 2 Re actor Bu ? I d t ng, Sl 2-171-401-C42 R 6 52.5 Unit 2 Reactor Building,' SI 2-101-408-041 R 6 75 Unit 2 ,

Safeguard, Unit 2 CS2-063-416-S22R '8 17.3 Safeguard, Unit 2 CS2-063-417-S22K 8 35.5 Safeguard, Unit 2 S12-037-402-522R 8 42.5 Safeguard, Unit 2 RH2-056-401 -S22 R 8 55 Safeguard, Unit 2 RH2-028-403-S32R 8 15 Safeguard, Unit 2 FP-810-125 8 57.5

' Safeguard, Un't 2 FP-810-12.55 8 40 Safeguard, Unit 2 FP-810-1351 8 17.5 r Safeguard, Unit 2 FP-810-1352 8 22.5

"'ba .,

i

. I Building Hanger Nueer P?pe Sfze Toroue-Average (f t-lbst Safeguard, Un't 2 FP-810-145 8 31 Safeguard, Onft 2 FP-810-115 9 27.5 Safeguard, Unit I FP-810-10S 8 8 Safeguard, Unit 2 FP-810-9.55 8 28 Safeguard, Unit 2 FP-810-95 8 51.5 Reactor Building, Sl 2-087-406-C42R 8 40 Unit 2 Reactor Building, Sl 2-087-409-C42 R 8 70 Unit 2 Reactor Butlding, " " S12-087-405-C42 R 8 55 Unit 2 rah: tor Building, Sl 2-088-410-C42K 8 46 Unit 2 Turbine Bu1Idtng, K)-2-055-407-T455 10 10 Unit 2 Turbine Building, K)-2-055-409-T45S 10 21.5 Unit 2 i

Safeguard, Un?t 2 CT2-011-403-S22R 10 21 Safeguard, Unit 2 CT2-012-410-S22K 10 37.5 l

Safeguard, Unft 2 CT2-083-418-S36R 10 83 Safeguard, Unit 2 CT2-083-417-S36< 10 57 Safeguard, Unit 2 CT2-017-440-S36K ,

10 31 Nactor BufId1ng, Sl 2-010-403-C465 10 20 Unit 2 l

Reactor Bufiding, 512-015-409-C42 R 10 45 Unit 2 Reactor Building, Sl 2-103-403-C42 R 10 37.5 Unit 2

  • %% g e

~

, o 7-Butiding Hanger Nunber Ploe Size Torque-Average (ft-lbs)

Reactor Bullding, Sl 2-103-403-C42 R 10 72.5 Unit 2 Safeguard, Unit 2 1+12-058-402-522R 10 50 Safeguard, Unit 2 FN2-058-402-522R 10 47.5 Safeguard, Unit 2 IH2-058-401-522R 10 62.5 Turbine Build?ng, HD-2-318-404-T4 5 S 12 48.5 Unit 2 Turbf no Bu11 ding, EX2-030-404-T455 12 26 Unit 2 TurbIr:e BuIId!ng, . , 0)2-042-439-T150 12 57.5 Unit 2 ~ '

  • Turbine Building, C)2-042-438-T150 12 85 Unit 2 Turbine Butiding, K)2-318401-T45S 12 -

65 Un f t 2

  • Turbine Building, K)2-323-403-T455 12 41 Unit 2 Safeguard, Unit 2 CC2-159-407-S53R 12 87 Fhector Building, RC2-115-430-C56R 12 40 Unit 2 Turbine Building, EX2-002-401-T45$ 14 Unit 2 19.5 Turbine EWilding, MS2-098-402-T45S 14 95 Unit 2 Turbine Building, TW2-099402-T350 14

. Unit 2 47.5 Turb1ne Building, EX2-004-401-T45S 14 Unit 2 57.5 Turbine Bu!! ding, F02-044-402-T35S 16 Unft 2 27.5

  • he  %

e 8-d Building Henger Nunber Pf pe Stre Toro w Average (ft-lbs1 Turo1ne Building, HD2-045-405-T35 S 16 125 Unit 2 ,

Turbine Building, HD2-009-401-T355 16 75 Unit 2 Turbine Butiding, VD2-072-402-T350 16 112.5 Unit 2 Turbine Buflding, HD2-045-401-T15R 16 69 Unf t 2 Turbine Building, F02-044-4 06-T15 R 16 69 Unit 2 Turbine Butiding _ . , HD2-044-405-T15R 16 72.5 Unit 2 Turbine Building HD2-314-401-T45$ 16 72.5 Unit 2 Safeguard, Unit 2 CT2-013-414-S?2K 16 126 Safeguard, Unit 2 CT2-013-413-533R 16 67.5 Safeguard, Unit 2 S12-076-404-522K 16 25 Safeguard, Unit 2 CT2-025 -405-S22K 16 85 Safeguard, Unit 2 CT2-025-405-S22K 16 95 Safeguard, Ur.ft 2 CC2-031 -406-S43K 18 117 Safeguard, Unft 2 CC2-068-407-$33K 1e 57.5 Safeguard, Unit 2 CC2-068-402-S33S 18 35

, Turbine Building, FW2-001-408-T45 R 20 65 Unit 2 Turbine Buffding, FW2-001-408-T45R 20 108 Unit 2 r Turbine Building, WD2-073-402-T35S 24 85 Unit 2

  • '=m g O

6

4

~

. \

9-Building Hanger Nueer Pfoe Size Torow .verage (ft-lbs)

Turbine Butiding, FW2-004-401 -T35 S 24 35 Unit 2 Turbine Building, FW2-004-402-T35S 24 34 Unit 2 .

Turbine Building, FW2-009-404-T355 24 43.5 Unit 2 Turbine Eaflding, K)2-068401-T15$ 24 67.5 Unit 2 Turbine Building, EX2-009-405-T45 S 24 40 Unit 2 Turb1no BufIding, .. CO2-032-403-T450 24 30 Unit 2 ~'-

Safegua-d, Un!t 2 CC2-028-412-533R 24 62.5 Safeguard, Unit 2 CO2-028-412-S33R 24 65 Turbine Building, MS2-033-001-T44S 26 22 Unit 2 Turbine Building, K)2-016-405-T35R 30 112.5 Unit 2 -

Turbine sullding, C)2-010-402-T450 30 105 Unit 2 Turbine Building, K)2-016-404-T35R 30 89 Unit 2 Turbine Butiding, EX2-012-402-T45S 30 55 Unit 2 Turbine Building, 40 VD2-071-402-T35f - 61 Unit 2 Turbine Building, VD2-070-403-T350 40 82.5

  • % e

CMHEMi i,%n6 e

- 14 0CT 25 A11:20 UNITED STATES OF AMERICA l LFH CE.'? E tE:

NUCLEAR REGULATORY COMMISSION 00CKEimG A SE?V;~'

BR4NCH BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )  !

TEXAS UTILITIES ELECTRIC

) Docket Nos. 50-445 and I COMPANY, et al.

) 50-446 1

)

) (Application for I (Comanche Peak Steam Electric ) Operating Licenses)

Station, Units 1 and 2) )

2 CERTIFICATE OF SERVICE I hereby certify that copies of " Applicants' Response to Board in Request for Information the above-captioned Regarding Cinching Down U-Bolts",

matter was served upon the following persons by express delivery (*), or deposit in the United St ta es mail, first class, postage prepaid, this 23rd day of October, 1984, or by hand delivery (**) on the 24th day of October, 1984.

    • Peter B.'Bloch, Esq.

~

Chairman, Atomic Safety and Chairman, Atomic Safety and Licensing Board Licensing Appeal Panel U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission j Commission Washington, Washington, D.C. D.C. 20555 20555 Dr. Walter H. Jordan Mr. William L. Clements Docketing & Service Branch 881 West Outer Drive U.S. Nuclear Regulatory Oak Ridge, Tennessee 37830 Commission Washington, D.C. 20555

  • Dr. Kenneth A. McCollom Dean, Division of Engineering- **Stuart A. Treby, Esq.

Architecture and Technology Office of the Executive Oklahoma State University Legal Director Stillwater, Oklahoma 74074

' U.S. Nuclear Regulatory Commission Chairman, Atomic Safety 7735 Old Georgetown Road and Licensing Board Panel Room 10117

, U.S. Nuclear Regulatory Bethesda, Maryland 20814

, Commissio'n Wash,ington, D.C. 20555

~ ~ ~ - .

- _ _ - - - - - - - - -- n , , -

e

/ '

Mr. John Collins ** Ellen Ginsberg, Esquire Regional Administrator, Atomic Safe.ty and Licensing

. Region IV Board Panel U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission' 611~Ryan Plaza Drive Washington, D.C. 20555 Suite l'000 Arlington, Texas 76011

  • Mrs. Juanita-Ellis Renea Hicks, Esq. President, CASE Assistant Attorney General 1426 South Polk Street Environmental Protection Dallas, Texas 75224 Division P.O. Box 12548 Lanny A. Sinkin  !

Capitol Station 114 W. 7th Street Austin, Texas 78711 Suite 220 l

Austin, Texas 78701 1 t

l) ) r

.. William A. Horin6~

cc: John W. Beck Robert Wooldridge, Esq.

9

  • % e

_ _ _ _ _ _ _ __