Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115A359 + (04:42:17, 13 December 2024)
- ML20115A348 + (04:42:24, 13 December 2024)
- ML20115A342 + (04:42:25, 13 December 2024)
- ML20115A341 + (04:42:25, 13 December 2024)
- HL-2940, Responds to NRC Re Violations Noted in Insp Rept 50-366/92-18.Corrective Actions:Each Operating Team Received Training on Importance of Accurate Rounds Data Collection & Comparison to Limits & Data Review + (04:42:26, 13 December 2024)
- ML20115A331 + (04:42:27, 13 December 2024)
- ML20115A315 + (04:42:33, 13 December 2024)
- ML20115A300 + (04:42:40, 13 December 2024)
- ML20115A302 + (04:42:40, 13 December 2024)
- ML20115A296 + (04:42:41, 13 December 2024)
- ML20115A294 + (04:42:41, 13 December 2024)
- ML20115A289 + (04:42:42, 13 December 2024)
- L-92-282, Forwards Rev 15 to St Lucie Plant Guard Training & Qualification Plan Per 10CFR50.54(p).Plan Withheld + (04:42:43, 13 December 2024)
- ML20115A285 + (04:42:43, 13 December 2024)
- ML20115A278 + (04:42:45, 13 December 2024)
- ML20115A268 + (04:42:46, 13 December 2024)
- ML20115A266 + (04:42:47, 13 December 2024)
- ML20115A260 + (04:42:48, 13 December 2024)
- JAFP-92-0704, Forwards Rev 15 to Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790(d)(1)) + (04:42:49, 13 December 2024)
- ML20115A252 + (04:42:49, 13 December 2024)
- ML20115A248 + (04:42:51, 13 December 2024)
- ML20115A238 + (04:42:52, 13 December 2024)
- ML20115A239 + (04:42:52, 13 December 2024)
- BSEP-92-0023, Forwards Monthly Operating Repts for Sept 1992 for Brunswick Steam Electric Plant,Unit 1 & 2.Startup Dates Constitute Target Dates.Firm Startup Dates Will Be Established in Middle of Nov + (04:42:53, 13 December 2024)
- ML20115A221 + (04:42:54, 13 December 2024)
- ML20115A205 + (04:42:55, 13 December 2024)
- ML20115A202 + (04:42:57, 13 December 2024)
- ML20115A169 + (04:42:58, 13 December 2024)
- ML20115A157 + (04:43:00, 13 December 2024)
- ML20115A153 + (04:43:02, 13 December 2024)
- ML20115A152 + (04:43:03, 13 December 2024)
- ML20115A141 + (04:43:05, 13 December 2024)
- ML20115A130 + (04:43:18, 13 December 2024)
- ML20115A100 + (04:43:37, 13 December 2024)
- ST-HL-AE-4233, Forwards Monthly Operating Repts for Sept 1992 for STP Electric Generating Station Units 1 & 2,incorporating Unit 2 Corrected Data for Net Electrical Energy Generated Per Error Noted in Apr 1990 Monthly Operating Rept + (04:43:43, 13 December 2024)
- ML20115A079 + (04:43:50, 13 December 2024)
- ML20115A070 + (04:43:51, 13 December 2024)
- ML20115A053 + (04:43:57, 13 December 2024)
- NSD-NRC-96-4753, Forwards Proprietary Rev 8 to AP600 Ssar.Revised Tables of Contents,Change Page Instructions,List of Effective Pages, Document Cover Sheet & Change Roadmap Outlining Changes in Section Encl Also.Encl Withheld + (04:44:40, 13 December 2024)
- ML20114G079 + (04:44:47, 13 December 2024)
- JAFP-92-0705, Monthly Operating Rept for Sept 1992 for Fitzpatrick Nuclear Power Plant + (04:44:49, 13 December 2024)
- ML20114G070 + (04:44:49, 13 December 2024)
- ML20114G026 + (04:44:51, 13 December 2024)
- ML20114G018 + (04:44:52, 13 December 2024)
- ML20114G010 + (04:44:53, 13 December 2024)
- 05000416/LER-1992-011-01, :on 920608,nonconforming Condition Noted in Temporary Shaft Seal Constructed of Foam rubber-type Matl on SGTS Charcoal Filter Train Fan.Caused by Failure of Original Design.Shaft Seal Installations Reviewed + (04:44:55, 13 December 2024)
- ML20114G003 + (04:44:56, 13 December 2024)
- ML20114G002 + (04:44:57, 13 December 2024)
- 05000440/LER-1992-017, :on 920910,RPS Scram Occurred Due to Reactor Water Level Reaching Level 3 Setpoint of 178 Inches.Oil Filter Gasket for RFPT B Servo Valve Inspected & Replaced.W/ + (04:44:58, 13 December 2024)
- 05000331/LER-1992-015, :on 920910,LPCI Swing Bus Inadvertently Deenergized for Approx Two Minutes.Caused by Breaker Transfer Problem During Restortion of LPCI Swing Bus. Appropriate Procedures Revised + (04:45:00, 13 December 2024)
- U-601971, Responds to NRC Concerns Re Initial & Requalification Retake Exam 50-461/OL-92-01 Administered During Wks of 920120 & 27. Lesson Plans 85201, Rod Drive & 87245, Main Turbine, Revised + (04:45:02, 13 December 2024)