- ,.CP&D' CO PLANT PERFORMANCE DATA' SYSTEM PACP 1-
- RUN DATE; 10/01/93
-APPENDIX:B - AVERAGE DAILY-: POWER-LEVEf7
- RPD39-000 RUN TIME 09:37:20--
' BRUNSWICK UNIT 1-DOCKET NO.- 050-0325 COMPLETED BY RONALD RUMPLE-TELEPHONE (919)457-2752-SEPTEMBER 1992 DAY.
AVG. DAILY POWER LEVEL DAY AVG.-DAILY POWER LEV"L (MWE-NET)
(MWE-NET) 1-
-9 17
-12 2
-9 18
-11 3
-7 19
-11 E4
-7 20
-11 5
-7 21
-8 6
-11 22
-11 7
-11 23
-12 8
-11 24
-11 s
9
-11 25
-12
.10
-11 26
-11
~11
--11 27
-11 12-
-11 28
-11
{-
-13
-12 29
-9 14
-12 30
~7
'15',
16
-9 1.16 - 8
)
9210140175 -Tl1014 PDR ' ADOCK 0$000324 R--
,CP&If CO PLANT PERFORMANCE DATA SYSTEM
_PAGE i
RUN DhTE 10/01/92 OPERATING DATA REPORT.
ERPD36-000 RUN-TIME' 09:321 BRUNSWICK UNIT 1 DOCKET NO.- 050-0325-
. COMPLETED BY RONALD RUMPLE
' OPERATING STATUS TELEPHONE (919)457-2752
- 1. UNIT NAME: BRUNSWICK UNIT 1 NOTES ' nere are 560 f uel bundles l
2.-REPORTING PERIOD: SEPTEMBER 92 in the Reactor Core, 1090 BWR and' 3.
LICENSED THERMAL POWER (MWT): 2436 160 PWR spent fuel bundles in the
- 4. NAMEPLATE RATING (GROSS MWE): 867.O Fuel Pool, and 108 fvel bundles in-
- 5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0
.the new fuel storage vault.-
-6.
MAX DEPENDABLE CAPACITY-(GROSS MWE): 791.0
- 7. MAX DEPENDABLE CAPACITY (NET MWE) : 767.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)' SINCE LAST RFPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE 4
.11.
HOURS IN REPORTING PERIOD 720.00 6575.00 136223.00-12.-NUMBER OF HOURS REACTOR CRITICAL
.00 2517.88 87881.32-
- 13. REACTOR-RESERVE SHUTDOWN HRS
.00
.00 1647.10
- 14. HOURS GENERATOR ON LINE
.00 2487.31 84201.37
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00-
- 16. GROSS THERMAL-ENERGY GEN. (MWH)
.00 5896708.27 183021943.70
- 17. GROSS ELEC. ENERGY GEN. (MWH)
.00 1935805.00 60019285.-00
- 18. NET-ELEC. ENERGY GENERATED (MWH)
-7458.0?-
1843494.00-57736824.00
- 19. UNIT SERVICE FACTOR
.0(
37.83-61.81
- 20. UNIT AVAILABILITY FACTOR
.00
-37.83
-61.81:
21.-UNIT CAP. FACTOR (USING MDC NET) 1.35
-36.56 53.83
- 22. UNIT CAP. FACTOR (USING DER NET)
-1.26 34.15 51.62 l-
- 23. UNIT FORCED-OUTAGE RATE
.00 31.04 16.07 24.-SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE,-DATE, AND DURATION OF EACH):
i-
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, FSTIMATED DATE C7 START UP: 12/14/92 *-
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIA*m OPERATION): FORECAST -ACHIEVED INITIAL CRIIICALITY i,
INITIAL ELECTRICITY COMMERCIAL OPERATION o Ths start up dates are target dates.
Pirm start up dates will be established in the middle c' November.
1.16 - 9 L
-'a DOCS.ET NO, 050-0325 UNIT MA*E frunswick 1 CATE Octebec 1992 COMFLETED BY Jensid Rtr cle TELEPHGNE 919 4 57-2732 8INIT SHUTDOWNS AND POVER REDUCTIONS REPORT MONTH Sect W e 1992 METHOD OF LICEh5EE SYSTEM CO*P0hENT CAUSE & CORRECTIVE ACTION TO DURATION SHUTTIhG DOWN EVE *.T CODE (4)
CODE (5)
PREVENT RECURRENCE No.
DATE
' TYPE (1)'
(HOURS)
REASON (2)
REACTOR (3)
REPORT NO.92-024 920530 5
720.0 8
4 1-92-12 N/A N/A To complete the scheduled.
Continued maintenance outage for backleg from previous reduction. Also, structural month inspections continue.
1:
Type 2:
Feason 3:
Method 4:
Syste Code:
5:
Co-ooreat CQ F - Forced A-Equipment failure 1-Manual Instructicns fer Instructions for.
5 - Scheduied (explain) 2-Manual Scram preparation of data entry preparation of data B-Ma;ntenance or test 3-Automatic scram sheets for Licensee Event entry sheets for LER C-Refueling
~5-Load redactions IEEE Standard 805-1983 603A-1983. per 4-Continuations Report (LER) file from file from IEEE Standard 0-Regulatory restriction-6 Other per nUREG-1022.
E.-
Operator Training &
Section VI. Item 13.b Item 13.c License Examination F-Administrative G-Operational error (explain)
H.-
Other (explain) n v
' - ~ -
t t
1
- r w
CP&U CO PL..NT PERFORMANCE DATA SYSTEM PAGE 2
RUN'DATE 10/01/92 APPENDIX B - AVERAGE DAILY PCUER LEVEL RPD39-000 RUN TIME 09:37:20 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY RONALD RUMPLE TELEPHONE (919)457-2752 SEPTEMBER 1992 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MW -NET)
(MWE-NET) 1
-11 17
-10 2
-11 18
-10
~~
3
-12 19
-9 4
-12 20
-9 5
-9 21
-10
~
6
-9 22
-10 7
-10 23
-10 8
~9 24
-10 9
-11 25
-10 10
-12 26
-10 1.1
-12 27
-10 1
12
-11 28
-10 13
-10 29
-10
~
14
-9 30
-10 15
-8 16
-9 1.16 - 8
-_ - ~ -
- CP&I5 CO PLANT _
- P'9FORMANCE DATA SYSTEM PAGE.
2 RUN'DATE' 10/01/92 OPra.nTING DATA REPORT RPD36-000 RUN TIME 09:37:21 BRUNSWICK UNIT 2
~
1 DOCKET NO. 050-0324 COMPLETED BY RONALD RUMPLE OPERATING STATUS TELEPHONE (919)457-2752 1.-UNIT NAME: BRUNSWICK UNIT 2 NOTES -There are 560 fuel bundles
- 3. REPORTING PERIOD: SEPTEMBER 92 in the Reactor Core, 1113 BWR and-3.
LICENSED THERMAL POWER (MWT): 2436 144 Pwn spent fuel bundles in.the L4. NAMEPLATE RATIt'G (GROSS MWE) 867.0 fuel pool, and 0 fuel bundles in
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 the new fuel storage vault.
6.
MAX DEPENDABLE CAPACITY (GROSS MWE) : 702.0
-7. MAX DEPENDABLE CAPACITY-(NET MWE): 754.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
l 9.
POWER LEVEL TO WHICil RESTRICTED IF ANY (HET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL l-MONTH DATE ATIVE' L
11'.
HOURS IN REPORTING PERIOD 720.00 6575'.00 14824*'.00
- 12. NUMBER OF HOURS REACTOR CRITICAL
.00 2378.33 92091.38
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00'
- 14. HOURS GENERATOR ON LINE
.00 2201.18 87154.67
- 15. UNIT RESERVE SHUTDOWN HOURS
.00-
.00
-. 00
' 16. GROSS TIIERMAL ENERGY GEN. (MWil)
.00 4196154.21 184126854.86
- 17. GROSS ELEC. ENERGY GEN. (MWH)
.00 3166375.00 59550469.00-
- 18. NET ELEC. ENERGY GENERATED (MWH)
-7272,00 11'4864.00 57065336.00 L-
- 19. UNIT SERVICE FACTOR
.00 33.48 58.79
-20. UNIT AVAILABILITY FACTOR
.00 33.48 58.79
-1.34 25.72 48.96' 22.-UNIT CAP. FACTOR (USING DER NET)
-1.23 23.62 46.89-
- 23. UNIT FORCED OUTAGE RATE
.00 18.45 13.51
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION-OF EACH) :
if 25,-IF' SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OFcSTART UP: 11/8/92;*
l=
'26.
UNITS IN TEST STATUS-(PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED L
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- 'The start up dates are target dates.
Firm start up dates will be established in'the l
middle of' November.
~
1.16
-9 L
L l.
l L
o I
d DOCKET NO.
010-c32s tMIT Nt?E e-- -scs 2 CATE Octebe-1992 COMPLETED EY Ronald C erle a
TELEFHONE 919-457-2752 UNIT SHUTDOWNS AN3 POWER REDUCTICNS REPORT MON 1H Settember 1992 l
METHOD OF LICENSEE SYSTEM CDMPCNENT CAUSE & CORRECTIVE ACTION TO DURATICN SHUTTING DOVN EVENT CODE (4)
CODE (5)
PREVENT RECURRENCE NO.
DATE TYPE (1)
(wCURS)
REASON (2)
REACICR (3)
REPORT No.92-025 920430 5
- 72. 0 B
4 1-92-12 TG XC To complete the scheduled natntenance outage for backlog Continued reduction. Also, structural from previous mnnth insoections ccntinue.
1:
Type 2:
Reason 3:
Methed 4:
System roge:
5:
Corronent Cede F - Forced A-Equipment failure 1-Manual Instructiers for Instructions for S - Scheduled (explain) 2-Manual Scram preparation of data entry preparation of date B-Maintenance or test 3-Automatic scram sheets for Licensee Event entry sheets for LER C-Refueling 4-Continuations Report (LEO) file from file from IEEE Standard D-Regulatory 5-Load reductions IEEE Standard 805-1983, 803A-1983, per rest ricti on 6-Other per NUREG-1022 NUREG-1022 Section VI.
Section VI Item 13.b Item 13.c E-Operator Training &
License Examination F-Administrative G-Operational error (explain!
H-Other (explain) f
,