ML20114G002

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Re Startup & Operation of Facility W/Eight Pipe Whip Restraints Missing,Based on Review of Util .Request Acceptable,On Condition Licensee Take Compensatory Measures Cited in Evaluation
ML20114G002
Person / Time
Site: 05000000, Hatch
Issue date: 07/01/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Olshinski J
NRC Office of Inspection & Enforcement (IE Region II)
Shared Package
ML20114F930 List:
References
FOIA-84-616, TAC 51908 NUDOCS 8307140087
Download: ML20114G002 (18)


Text

,/ Sa ng*\\

UNITED sTA$s Ch 3

,a NUCLEAR REGULATORY COMMISSION

.i

/ l r:AsHINGTcN, D. C. 20666 g.w....o#

July 1,1983 Docket No. 50-36ii EMORANDUM FOR: John A. 01shinski, Director Division of Engineering and Technical Programs Region II FROM:

Darrell G. Eisenhut, Director Division of Licensing

SUBJECT:

EVALUATION OF HATCH UNIT 2 STARTUP AND OPERATION WITH PIPE WHIP RESTRAINTS MISSING We have completed our evaluation regarding startup and operation of Hatch Unit 2 with 8 pipe whip restraints missing.

Based on our review of Georgia Power Company's June 28, 1983 letter to Region II and discussions i-with the licensee, we have determined that it is acceptable to startup and operate Hatch Unit 2 without these pipe whip restraints on the condition that the licensee take the compensatory measures discussed in the attached Safety Evaluation.

This evaluation was performed by NRR under TIA No. 83-67 in response to Region II's oral request of June 29,.1983. This letter completes our activity under this TIA.

\\

C

/

i i'

{ {,~.1 1 arte1T G. Els!(L,.L *Dfr~elctor

~l

enhut, Division of Licensing cc:

GRivenbark JStolz Glainas wa e=w--ew.m#.a.

,ee a

4

. TFP

.