Monthly Operating Repts for Sept 1992 for BVPS Units 1 & 2
ML20115A100
Person / Time
Site: Beaver Valley
Issue date: 09/30/1992
From: David Jones, Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9210140101
Download: ML20115A100 (9)


Text

!

. . i a da i

~&t(5 M e va wh av> um 1en,s

, w ,w a uuv P O lios 4 f.hq.i negpurt PA IM)?I (MP 4 Octotor 8, 1992 i

Beaver Valley twer Station Ur.il 1 - Docket IJo. 50-334, Licence lio. DPR-GG Vnit 2 - IXcket flo. 50-412, Licence flo. IIPT-73

_.lMDM1h.li!X0tilr1J1erw1_ _

U. S. fluclear Wgulatory Conniccion Docunent Control Deck Washiraton, D.C. 20500 CentIen:n:

In accordance with Ap[:endix A, 'Ibchnical Specifications, the Ibnthly Cycratity) Ikfort in nuhnitted for Unit 1 arxl Unit 2 for the Inonth of Septenir2r, 1992.

Very truly yours, g syt mg h

3. D. Siebor Vice Precident

!Juclear Croup D10/mny Diclosures cc: fiRC Ikgional Off ice Kiry of Pruncia, PA ,

t is el fl / ')

9210140101 920930 PDR ADOCK OS000334 R PDR g

IIARPATIVE SUHARY OF MDtfIHLY OPEPATIlG EXPERIDiCE

.. r. UNIT 1 "EPTDBER 092 T f1 ;,

fj. (s Septeder 1 %e Unh operawd at approximtely 90% output in accordanca e g<T4?ra through with the phnned fuel cycle length extemsion. >

1 '. e , ;c "f Septerber 4

. _.p; k .k; f^

Septe mer 5 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit commenced a reduction in output to approxim tely 50% to load f?llct-

', 5G:!, L, _

'g Septerher 6 no Unit continued to operate at approximately 50% outwt

~.

through while load following.

Septeder 7 SeptemLer 8 At 0315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br /> the Unit commenced a power increa ^

k output. Approximately 90% output was ach. . M at 070! ac- I the pl uned fuel cycle lergth extension ce " led.

Sqterber >

'Ihe 1.' nit croratea . approximtely 90% outpt. ' axot t e through with *te r.raneel t'ud cycle lcrgth extension.

Septe2er 12 atenber 13 At 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br /> the Unit carenced a rcduction in output to approxistely 80% to load folic /.

Septerbcr 14 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> the Unit commnotd a pcner increase to 90%

output. Approximately 90% output was achieved et 0600 hour0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br />.s as the planned fuel cycle length eJ: tension continned. .

Septe:ter 15 The Unit operated at approximtely 90% output in accordance through with the planned fuel cycle length extension.

Septerber 19 Septe2er 20 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> the Unit comenced a reduction in "Itput to approxim tely 50% to load follow. At 1516 hours0.0175 days <br />0.421 hours <br />0.00251 weeks <br />5.76838e-4 months <br /> tne Unit comenced a pcuar increase Lo 90% outpt Approximtely 90%

output was achievo:1 at 1820 hours0.0211 days <br />0.506 hours <br />0.00301 weeks <br />6.9251e-4 months <br /> as the planned fuel cycle length extension continued.

Septerber 21 Tha Unit continued to operate at approxine aly 90% outpuc in through accordance with the planned fuel cycle length extensim.

September 30 l

i dd

~ _ - -

t AVGAGE DAILY UNIT FQiER LEVEL DOCKEI' NO. __50-334 UllIT BVPS Unit 1 DATE Cctotex 2. 1992 00!PLEITD BY David T. Jones TELEPH0tfE (412) 393-7612 MO!TIll Septerber Ev2 I DAY AVERAGE DAILY POWER LEVEL DAY j AVERAGE D*.ILY POWER LEVEL (Mie-Net) (.:.r7e-t&t) 1 725 17 717 2 738 18 733

- 3 713 19 729 4 725 20 538 (

5 708 21 721 6 345 22 ___ 725 _

7 329 23 738 j l 8 633 24 746 l

l 9 725 25 738 _

10 717 26 733 t 11 733 27 . i33 12 733 28 738 13 658 29 _

_ 742 14 704 30 746 15 721 f 16 725 INSTRUCTIONS On this forrat, list the average daily unit power level Mie-Net for each day in the reporting renth. Caepute to the naarest whole negawatt.

- 1 l

1

. _ . - - . .. .- ~ . . - .

a OPERATING DATA REPORT DOCRET No.: .50 334 REPORT DATE: 10/02/92 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393 7612 p"ERATING STATUS

1. UNIT NAME: BEAN 4R VALLEY POWD TATION, UNIT 1 Notes
2. REPORTING PERIOD: JtTTEMBER 19.
3. LICENSED THERMAL POWER (HWt): 2652
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 835
6. MAX, DEPENDABLE CAPACITY (Gross MWe): 860
7. MAX. DEPENDABLE CAPACITY (Net YWe): 810
8. IF CHA:!CSi JCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Not MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVF
11. HOURS IN REPORTINC PERIOD: 720.0 6575.0 143927.0
12. No. OF HRS. REACTOR WAS CRITIC : : 7?'.0 6575.0 91898.6

!). REACTOR RESERVF SHUTDOWN HOURS: v.0 0.0 4482.8 14, HOURS GENERATUR WAS ON LINE: 720.0 6575.0 90006.2 15, UN.~ RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0

16. CROS5 THERMAL ENERGY GEN. (MWH)- 1629699.0 16578980.0 215091156.5
17. C".sSS E1ECT. ENERGY GEN. (MWH): 529710.0 5420760.0 69219163.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 496990.0 5108770 0 64576320.0
19. UNIT ""RVICE FACTOR: (PERCENT) 100.0 100.0 64.6
20. UNIT AVAILAEILITY FACTOR:(PERCENT) 100.0 100.0 64.6
21. UNIT CAPACITY FACTOR (MDC): PCT 85.2 95.9 58.2
22. UNIT CAPACITY FACTOR (DER): PCT 82.7 93.1 56.4
23. UNIT FORCED OUTACE RATE: (PERCENT) 0.0 0.0 15.7
24. SHUTDOWNS SCHEDULED OVER NE.XT SIX MONTHS (TYFE,DATE,AND DURATION OF EACH):

i

25. IF SHUT DOWN AT END OF REPCRT PERIOD, ESTIMATED PATE OF STARTbP: _
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

f FORECAST ACHIEVED l INITIAL CRITICALITY N/A N/A f I"ITIAL ELECTRICITY N/A N/A l

LOhMERCIAL OPERATION N/A N/A l

t

m . _ . _ . _ . _ ___

. b

_._ ~

t UNIT SHUTDOLWS 4.NO POWE R REDUCTIONS (220%) Docket No. 50-334 -

[

Ucit Name BVPS Unit'81 -

f Date October 2. 1992 [

j Completed By David e . Jones REPORT MOWTH SFo1EMBE0 1992 Telephane _L4'2) 393-7612  ;

Method of Licensee Cause & Corrective '

. ration shutting Event System Component Action to.

No. Date- Type 1 thours) Reason 2 Down Reactor 3 Report # Code 4 Code 5 Prevent Recurrence l l 11 920901 5 0 K 4 N/A ZZ 222ZZZ Unit centinued to operate at a reduced output of appreminately 901  !

in accordance with the planned f uet -[

cycle tength entension.  !

t I

4 12 920905 s 0 H 5 N/A ZZ ZZZZ;Z units output reduced f rom approx.-

90% to approximately 50% to load

) follow. *

j
11 920913 5- 0 H 5 N/A 22 222222 units output reduced from appron.  !

90% to approximately 80% to load follow. -t 1-  ;

f i 14 920920 S O H 5 N/A ZZ ZZZZZZ Units output reduced f rom appron. .[

902 to approsimately 50% to toad -

follow.

I

_1 1 1 2 3 4 I F-Forced Reason: Nethod: Exhibit F-Instructions for I S-Scheduled A-Equipment Failure (Esplain) 1-Manuel Preparation of Data Entry Sheets i B haintenance or fest 2-Manual Scram for Licensee Event Report (LER) File L C-tefueting 3-Automatic Scram (kUREG0161).  !

D-Regulatory Restriction 4-Cont'd. from Previous Month  !

E-operator Training & License Exam 5 Reduction 5 F-Administrative , 9-Other Exhibit H-Same Source.

G-Operational Error (Esplain)

H-Other (Emplain) 1 t

t

.a . . _ - i .- , -w-. , 9 .y

IMPRATIVE SlFMARY OF M0 tinily OPHRTDJG EXPERIDICE LNIT 2 SEPIDiBER 1992 Septerrber 1 'Ibe Unit operated at a nominal value of 100% output. .

thru Aih September 21 September 22 At 0838 hours0.0097 days <br />0.233 hours <br />0.00139 weeks <br />3.18859e-4 months <br /> the Unit cmmenced a load reduction to approximately 45% output. 'Ihis was initiated due to an-electrical problem with the "A" Condensate Pump while the "B" Cordensate Pump was already out of service-'for-maintenanca.

September 23 At 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> the Unit comenced a pcuer increase to 100%

output following repairs to the "A" Condensate Punp. A nortinal value of 100% output was achieved at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />.

September 24 'Ihe Unit operatei at a nominal value of.100% outp2t.

through Septemta 30

. - - - -e v , ,

~

AVEPME DAILY UNIT POWER LEVEL DOQET 10. 50-412 UNIT BVPS Unit 2 DATE October 2. 1992 CD4PLETED BY David T. Jon g -

TELEPHONE (412)-393-7612 FDtflH Senterber 1992 DAY AVEPM E DAILY POWER LEVEL DAY AVEPM E DAILY POWER LEVEL (FMe-Net) (MWe-Net) 1 839 17 825 2 835 18 826 3 829 19 836 4 830 20 836 5 827 21 824 6 825 22 517 7 L27 23 621 8 826 24 833 ,

3 827 25 833 10 828 _ 26 827 11 838 27 _- 828 12 838 28 834 13 834 29 836 14 830 30 837 15 827 16 826 INSIRUCTIONS On tilis fortut, list the average daily unit power level t&ie-Net for each day -in the reportirg month. Corpute to the nearest whole megawatt.

v s+-y-e m,-- p ,-4m y- r -,-,-,

+

OPERATING DATA REPURT itCKET NO.: 50 412

.7EPORT DATE: 10/02/92 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393 7612 OPERATING STATUS

1. UNIT NAME: BEAVEP VALLEY POWER STATION, UNIT Notes
2. REPORTING PERIOD: SEPTEMBER 1992
3. LICENSED THERMAL POWER (tGr ' . 2652
4. NAMEPLATE RATING (Groos MVe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 836
6. MAX. DEPENDABLE CAPACITY (Cross MWe): 870
7. MAX. DEPENDABLE CAPACITY (Net MWe): 820
8. IF CHANGES OCCUR IN CAPACITY RATIhCS SINCE IAST REPORT, CIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A ___

THIS MONTH YEAR TO DATE CUMULATIVE

11. HOUP.S IN REPORTING PERIOD: 720.0 6575.0 42710.0
12. NO. OF HRS. REACTOR WAS CRITICAL. 720.0 5212.0 36292.2
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS CENERATOR WAS ON LINE: 720.0 5134.3 36016.3
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. CROSS THERMAL ENERGY CEN. (MWH): 1859358.0 12763391.0 88123138.4
17. CROSS ELECT. ENERGY GEN. (MWH): 616828.0 4161559.0 28335140.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 585585.0 3929688.0 26735173.0 19 UNIT SERVICE FACTOR: (PERCENT) 100.0 78.1 84.3
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 78.1 84.3
21. UNIT CAPACITY FACTOR (MDC): PCT 99.2 72.9 75.7
22. UNIT CAPACITY FACTOR (DER): PCT '7.3 71.5 74.9
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.3 3.4
24. SHUTDOWNS SCHEDULED 0"ER NEXT SIX MONTHS (TYPE,DATE, ANL DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 1

l

l 3:

5

. UNIT'SHuiD0idNS AND POWER REDUCT10ds (2201) Docket ho. 50-412 * -

I

, Unit N 'ime BYPS Untt #2 i~

uate October 2_ 1992 Completed By ,Javid T. Jones- .j l REPORT MONTH SEPTEMBER 1992 Teleptone (412) 393-7612 I Method of Licensee Cause & Corrective Duration Shutting Event Systee Component Action ta' l No. Oate typet (Hours) Reason 2 Down Reactor 3: . Report # code 4 Code 5 Prevent Recurrence 17 920922 F 0 A 5 N/A MH M010px Unit reduced output from 100% to' approximately 45% due to an-electrical problem with.the *A*

Condensate Pump's motor.

> \

i .

L

j. i 4'

~

7 f l

.'y i

1

i.  !

v

< 1 2 3 4 i F Forced Reason: Method: Exhibit F-Instructions for'  !

S-Scheduled A-Equipment falture (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or. Test 2-Manual Scram f or i.icensee Event Report (LER) File' .I C; Refueling 3-Automatic Scram -(NUREG0161).  !

D-Regulatory Restricticn 4-Cont'd. from Pre.'uus Month I E-Operator Training & License Exam 5-Reduction 5' i F-Administrative 9-Other Exhibit h-Same Source. t l G-Operationat Error-(Explain)

'H-Other (Explain) i i

t i

, - _ .. . - . . _ _ _i