, w,w a uuv P O lios 4 f.hq.i negpurt PA IM)?I (MP 4 Octotor 8, 1992 Beaver Valley twer Station Ur.il 1 - Docket IJo. 50-334, Licence lio. DPR-GG Vnit 2 - IXcket flo. 50-412, Licence flo. IIPT-73
_.lMDM1h.li!X0tilr1J1erw1_ _
U. S. fluclear Wgulatory Conniccion Docunent Control Deck Washiraton, D.C.
20500 CentIen:n:
In accordance with Ap[:endix A,
'Ibchnical Specifications, the Ibnthly Cycratity) Ikfort in nuhnitted for Unit 1 arxl Unit 2 for the Inonth of Septenir2r, 1992.
Very truly yours, g syt mg h
- 3. D. Siebor Vice Precident
!Juclear Croup D10/mny Diclosures cc: fiRC Ikgional Off ice Kiry of Pruncia, PA t
is el fl /
')
9210140101 920930 PDR ADOCK OS000334 R
PDR g
IIARPATIVE SUHARY OF MDtfIHLY OPEPATIlG EXPERIDiCE
.. r.
UNIT 1 "EPTDBER 092 T
fj. f1 ;,
Septeder 1
%e Unh operawd at approximtely 90% output in accordanca (s
e g<T4?ra through with the phnned fuel cycle length extemsion.
"f 1 '. e, ;c Septerber 4
. k.k Septe mer 5 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit commenced a reduction in output to
_.p; f ^
approxim tely 50% to load f?llct-
', 5G:!, L,
'g Septerher 6 no Unit continued to operate at approximately 50% outwt through while load following.
~.
Septeder 7 k
SeptemLer 8 At 0315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br /> the Unit commenced a power increa
^
output.
Approximately 90% output was ach.. M at 070! ac-I the pl uned fuel cycle lergth extension ce " led.
'Ihe 1.' nit croratea.
approximtely 90% outpt.
' axot t e
Sqterber through with *te r.raneel t'ud cycle lcrgth extension.
Septe2er 12 atenber 13 At 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br /> the Unit carenced a rcduction in output to approxistely 80% to load folic /.
Septerbcr 14 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> the Unit commnotd a pcner increase to 90%
output.
Approximately 90% output was achieved et 0600 hour0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br />.s as the planned fuel cycle length eJ: tension continned.
Septe:ter 15 The Unit operated at approximtely 90% output in accordance through with the planned fuel cycle length extension.
Septerber 19 Septe2er 20 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> the Unit comenced a reduction in "Itput to approxim tely 50% to load follow.
At 1516 hours0.0175 days <br />0.421 hours <br />0.00251 weeks <br />5.76838e-4 months <br /> tne Unit comenced a pcuar increase Lo 90% outpt Approximtely 90%
output was achievo:1 at 1820 hours0.0211 days <br />0.506 hours <br />0.00301 weeks <br />6.9251e-4 months <br /> as the planned fuel cycle length extension continued.
Septerber 21 Tha Unit continued to operate at approxine aly 90% outpuc in through accordance with the planned fuel cycle length extensim.
September 30 l
i dd
~
t AVGAGE DAILY UNIT FQiER LEVEL DOCKEI' NO.
__50-334 UllIT BVPS Unit 1 DATE Cctotex 2. 1992 00!PLEITD BY David T. Jones TELEPH0tfE (412) 393-7612 MO!TIll Septerber Ev2 I
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE D*.ILY POWER LEVEL j
(Mie-Net)
(.:.r7e-t&t) 1 725 17 717 2
738 18 733 3
713 19 729 4
725 20 538
(
5 708 21 721 6
345 22 725 7
329 23 738 j
l 8
633 24 746 l
l 9
725 25 738 10 717 26 733 11 733 27 i33 t
12 733 28 738 13 658 29 742 14 704 30 746 15 721 f
16 725 INSTRUCTIONS On this forrat, list the average daily unit power level Mie-Net for each day in the reporting renth.
Caepute to the naarest whole negawatt.
1 l
1
~
a OPERATING DATA REPORT DOCRET No.:
.50 334 REPORT DATE:
10/02/92 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393 7612 p"ERATING STATUS
- 1. UNIT NAME: BEAN 4R VALLEY POWD TATION, UNIT 1 Notes
- 2. REPORTING PERIOD: JtTTEMBER 19.
- 3. LICENSED THERMAL POWER (HWt):
2652
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX, DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net YWe):
810 8.
IF CHA:!CSi JCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Not MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVF
- 11. HOURS IN REPORTINC PERIOD:
720.0 6575.0 143927.0
- 12. No. OF HRS. REACTOR WAS CRITIC : :
7?'.0 6575.0 91898.6
!). REACTOR RESERVF SHUTDOWN HOURS:
v.0 0.0 4482.8 14, HOURS GENERATUR WAS ON LINE:
720.0 6575.0 90006.2 15, UN.~ RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROS5 THERMAL ENERGY GEN. (MWH)-
1629699.0 16578980.0 215091156.5
- 17. C".sSS E1ECT. ENERGY GEN. (MWH):
529710.0 5420760.0 69219163.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
496990.0 5108770 0 64576320.0
- 19. UNIT ""RVICE FACTOR: (PERCENT) 100.0 100.0 64.6
- 20. UNIT AVAILAEILITY FACTOR:(PERCENT) 100.0 100.0 64.6
- 22. UNIT CAPACITY FACTOR (DER): PCT 82.7 93.1 56.4
- 23. UNIT FORCED OUTACE RATE: (PERCENT) 0.0 0.0 15.7
- 24. SHUTDOWNS SCHEDULED OVER NE.XT SIX MONTHS (TYFE,DATE,AND DURATION OF EACH):
i
- 25. IF SHUT DOWN AT END OF REPCRT PERIOD, ESTIMATED PATE OF STARTbP: _
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
f FORECAST ACHIEVED l
INITIAL CRITICALITY N/A N/A f
I"ITIAL ELECTRICITY N/A N/A l
LOhMERCIAL OPERATION N/A N/A l
t
m b
~(
t UNIT SHUTDOLWS 4.NO POWE R REDUCTIONS (220%)
Docket No.
50-334
[
Ucit Name BVPS Unit'81 f
Date October 2. 1992
[
j Completed By David e. Jones
{
REPORT MOWTH SFo1EMBE0 1992 Telephane
_L4'2) 393-7612 Method of Licensee Cause & Corrective
. ration shutting Event System Component Action to.
No.
Date-Type 1 thours)
Reason 2 Down Reactor 3 Report #
Code 4 Code 5 Prevent Recurrence l
l 11 920901 5
0 K
4 N/A ZZ 222ZZZ Unit centinued to operate at a reduced output of appreminately 901 in accordance with the planned f uet
-[
cycle tength entension.
t I
4 12 920905 s
0 H
5 N/A ZZ ZZZZ;Z units output reduced f rom approx.-
90% to approximately 50% to load
)
follow.
- j 11 920913 5-0 H
5 N/A 22 222222 units output reduced from appron.
90% to approximately 80% to load follow.
-t 1-f i
14 920920 S
O H
5 N/A ZZ ZZZZZZ Units output reduced f rom appron.
.[
902 to approsimately 50% to toad follow.
I
_1 1
1 2
3 4
I F-Forced Reason:
Nethod:
Exhibit F-Instructions for I
S-Scheduled A-Equipment Failure (Esplain) 1-Manuel Preparation of Data Entry Sheets i
B haintenance or fest 2-Manual Scram for Licensee Event Report (LER) File L
C-tefueting 3-Automatic Scram (kUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E-operator Training & License Exam 5 Reduction 5
F-Administrative 9-Other Exhibit H-Same Source.
G-Operational Error (Esplain)
H-Other (Emplain)
{
1 t
t
.a i
-w-.
9
.y
IMPRATIVE SlFMARY OF M0 tinily OPHRTDJG EXPERIDICE LNIT 2 SEPIDiBER 1992 Septerrber 1
'Ibe Unit operated at a nominal value of 100% output..
thru Aih September 21 September 22 At 0838 hours0.0097 days <br />0.233 hours <br />0.00139 weeks <br />3.18859e-4 months <br /> the Unit cmmenced a load reduction to approximately 45% output.
'Ihis was initiated due to an-electrical problem with the "A" Condensate Pump while the "B"
Cordensate Pump was already out of service-'for-maintenanca.
September 23 At 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> the Unit comenced a pcuer increase to 100%
output following repairs to the "A"
Condensate Punp. A nortinal value of 100% output was achieved at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />.
September 24
'Ihe Unit operatei at a nominal value of.100% outp2t.
through Septemta 30
-e v
~
AVEPME DAILY UNIT POWER LEVEL DOQET 10.
50-412 UNIT BVPS Unit 2 DATE October 2. 1992 CD4PLETED BY David T. Jon g -
TELEPHONE (412)-393-7612 FDtflH Senterber 1992 DAY AVEPM E DAILY POWER LEVEL DAY AVEPM E DAILY POWER LEVEL (FMe-Net)
(MWe-Net) 1 839 17 825 2
835 18 826 3
829 19 836 4
830 20 836 5
827 21 824 6
825 22 517 7
L27 23 621 8
826 24 833 3
827 25 833 10 828 26 827 11 838 27 828 12 838 28 834 13 834 29 836 14 830 30 837 15 827 16 826 INSIRUCTIONS On tilis fortut, list the average daily unit power level t&ie-Net for each day -in the reportirg month. Corpute to the nearest whole megawatt.
v s+-y-e m,--
p
,-4m y-r
+
OPERATING DATA REPURT itCKET NO.:
50 412
.7EPORT DATE:
10/02/92 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393 7612 OPERATING STATUS
- 1. UNIT NAME: BEAVEP VALLEY POWER STATION, UNIT Notes
- 2. REPORTING PERIOD: SEPTEMBER 1992
- 3. LICENSED THERMAL POWER (tGr '.
2652
- 4. NAMEPLATE RATING (Groos MVe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Cross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820 8.
IF CHANGES OCCUR IN CAPACITY RATIhCS SINCE IAST REPORT, CIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOUP.S IN REPORTING PERIOD:
720.0 6575.0 42710.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL.
720.0 5212.0 36292.2
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS CENERATOR WAS ON LINE:
720.0 5134.3 36016.3
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY CEN. (MWH):
1859358.0 12763391.0 88123138.4
- 17. CROSS ELECT. ENERGY GEN. (MWH):
616828.0 4161559.0 28335140.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
585585.0 3929688.0 26735173.0 19 UNIT SERVICE FACTOR: (PERCENT) 100.0 78.1 84.3
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 78.1 84.3
- 22. UNIT CAPACITY FACTOR (DER): PCT
'7.3 71.5 74.9
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.3 3.4
- 24. SHUTDOWNS SCHEDULED 0"ER NEXT SIX MONTHS (TYPE,DATE, ANL DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 1
l 3:
5
. UNIT'SHuiD0idNS AND POWER REDUCT10ds (2201)
Docket ho.
50-412 I
Unit N 'ime BYPS Untt #2 i~
uate October 2_ 1992 Completed By,Javid T.
Jones-
.j l
REPORT MONTH SEPTEMBER 1992 Teleptone (412) 393-7612 I
Method of Licensee Cause & Corrective Duration Shutting Event Systee Component Action ta' l
No.
Oate typet (Hours)
Reason 2 Down Reactor 3:
. Report #
code 4 Code 5 Prevent Recurrence 17 920922 F
0 A
5 N/A MH M010px Unit reduced output from 100% to' approximately 45% due to an-electrical problem with.the *A*
Condensate Pump's motor.
\\
i L
j.
i 4'
~
f 7
l
.'y i
1 i.
v 1
2 3
4 i
F Forced Reason:
Method:
Exhibit F-Instructions for' S-Scheduled A-Equipment falture (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or. Test 2-Manual Scram f or i.icensee Event Report (LER) File'
.I C; Refueling 3-Automatic Scram
-(NUREG0161).
D-Regulatory Restricticn 4-Cont'd. from Pre.'uus Month I
E-Operator Training & License Exam 5-Reduction 5'
i F-Administrative 9-Other Exhibit h-Same Source.
t l
G-Operationat Error-(Explain)
'H-Other (Explain) i i
t i
i