Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 L-98-096, Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Bvps,Units 1 & 2 L-98-068, Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bvps,Units 1 & 2 L-98-036, Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station1998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Beaver Valley Power Station ML20202F8191998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Beaver Valley Power Station,Units 1 & 2 ML20198L3981997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-072, Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Bvps,Units 1 & 2 L-97-057, Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Beaver Valley Power Station,Units 1 & 2 L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 ML20216H6031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Beaver Valley Power Station ML20210K5821997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Bvps,Units 1 & 2 ML20140D7261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for BVPS ML20141B3501997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Beaver Valley Power Station,Units 1 & 2 ML20137T1441997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Beaver Valley Power Station Units 1 & 2 ML20136G4651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Beaver Valley Power Station,Unit 1 & 2 ML20134K1521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Beaver Valley Power Station,Units 1 & 2 ML20133F4831996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Beaver Valley Power Station Unit 1 & 2 ML20132B1001996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Beaver Valley Power Station Unit 1 & 2 ML20134H4921996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Beaver Valley Power Station,Units 1 & 2 ML20128N1911996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Beaver Valley Power Station Unit 1 & 2 ML20117M2091996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Beaver Valley Power Station Units 1 & 2 ML20117B2481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Beaver Valley Power Station ML20115D4061996-06-30030 June 1996 Monthly Operating Repts for June 1996 for BVPS ML20117M1791996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Beaver Valley Power Station,Units 1 & 2 ML20111B2441996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Beaver Valley Power Station ML20101R0621996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Beaver Valley Power Station ML20100R2841996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Beaver Valley Power Station ML20097D4541996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Beaver Valley Power Station ML20096B2531995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Beaver Valley Power Station ML20095D8651995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Beaver Valley Power Station ML20094H3631995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Beaver Valley Power Station ML20092F4251995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Beaver Valley Power Station ML20087F1331995-07-31031 July 1995 Monthly Operating Repts for Jul 1995 for Beaver Valley Power Station ML20086G1601995-06-30030 June 1995 Monthly Operating Repts for June 1995 for Beaver Valley Power Station Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARL-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With1999-09-0202 September 1999 LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with ML20209D9531999-06-27027 June 1999 Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable1999-05-0303 May 1999 Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable L-99-079, Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Beaver Valley Power Station,Units 1 & 2.With ML20205L0401999-04-0909 April 1999 SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 L-99-054, Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite1999-04-0505 April 1999 Special Rept:On 990320,meteorological Tower Wind Speed Sensors Were Declared Inoperable.Caused by Calibration Completed by Vendor Did Not Adequately Cover Full Operating Range of Sensors.Removed Sensors & Sent Offsite L-99-058, Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Bvps,Units 1 & 2. with ML20196K7981999-03-25025 March 1999 Rev 4 to COLR, for Cycle 8 L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with ML20203E1181999-02-10010 February 1999 SER Accepting Proposed Revs to Plant,Units 1 & 2 Quality Assurance Program Description L-99-019, Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced1999-02-0505 February 1999 Special Rept:On 990120,meteorological Tower Wind Speed Sensors Declared Inoperable.Caused by Processor Card for Sensor Locked Up & Needed to Be Reset.Heater That Fit Around Shaft of Sensor Replaced ML20196F7011999-01-31031 January 1999 BVPS Unit 2 Heatup & Cooldown Limit Curves During Normal Operation at 15 EFPY Using Code Case N-626 ML20203D4811999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Bvps,Units 1 & 2, in Accordance with NRC GL 97-02.With ML20207E6631999-01-28028 January 1999 Rev 0 to EMECH-0713-1, Operational Assessment of SG Tubing at Beaver Valley Unit 1,Cycle 13 ML20210G7041999-01-22022 January 1999 BVPS Unit 1 Facility Changes,Tests & Experiments for 980123-990122 ML20207E5861998-12-31031 December 1998 Annual Rept 1998 for Toledo Edison ML20207E5601998-12-31031 December 1998 Annual Rept 1998 for Pennpower ML20198B9021998-12-31031 December 1998 BVPS Unit 1 Simulator Four Yr Certification Rept for 1995-1998 ML20207E5901998-12-31031 December 1998 Dqe 1998 Annual Rept to Shareholders ML20199C9971998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Bvps,Units 1 & 2. with ML20207E5521998-12-31031 December 1998 Annual Rept 1998 for Ohio Edison ML20207E5761998-12-31031 December 1998 Annual Rept 1998 for Illuminating Co ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199F5341998-12-29029 December 1998 Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 ML20198K8551998-12-21021 December 1998 SER Granting Relief Request PRR-5 for Third 10-year Inservice Testing for Beaver Valley Power Station,Unit 1 ML20198A1631998-12-0909 December 1998 SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request L-98-229, Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Bvps,Units 1 & 2. with ML20195J3131998-11-12012 November 1998 Safety Evaluation Granting First & Second 10-yr Interval Inservice Insp Request for Relief L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with ML20206G0291998-10-31031 October 1998 BVPS Unit 2 Facility Changes,Tests & Experiments for Period 971101-981031 ML20154R9121998-10-20020 October 1998 Safety Evaluation Accepting Proposed Changes to QA Program Description in Chapter 17.2 of BVPS-2 Ufsar.Proposed Changes Would Modify QA Organization to Allow Warehouse QC Inspectors to Report to Manager of Nuclear Procurement Dept ML20154P7491998-10-19019 October 1998 SE Accepting Second ten-year Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant, Unit 1 ML20198F7611998-10-0606 October 1998 Duquesne Light Co,Beaver Valley Power Station 1998 Emergency Preparedness Ingestion Zone Exercise, Conducted on 981006 ML20154C6711998-10-0101 October 1998 Safety Evaluation Concluding That Revised Model Identified in Dl Submittal Was Appropriate for Analysis of Installed Conduit Ampacity Limits.Determined That There Are No Outstanding Safety Concerns with Respect to Ampacity ML20154D5001998-09-30030 September 1998 Special Rept on Overview of BVPS-1 & BVPS-2 TS Compliance Issues & Corrective Action Taken L-98-197, Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods L-98-188, Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure1998-09-21021 September 1998 Special Rept:During 1998,Unit 2 SG Eddy Current exam,26 Tubes Were Improperly Encoded in SG 2RCS-SG21C During Previous Outage.Use of Independent Databases to Track New Indications Being Implemented as Preventive Measure L-98-178, Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Bvps,Units 1 & 2. with ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed L-98-168, Monthly Operating Repts for July 1998 for Bvps,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Bvps,Units 1 & 2 L-98-157, Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product1998-07-29029 July 1998 Special Rept:On 980423,inoperability of Seismic Monitoring Instrument Noted.Caused by Obsolescence of Instrument & Inability to Obtain Necessary Spare Parts.Design Change Is Being Pursued to Obtain Replacement Product L-98-139, Monthly Operating Repts for June 1998 for Bvps,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Bvps,Units 1 & 2 L-98-119, Monthly Operating Repts for Bvps,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for Bvps,Units 1 & 2 1999-09-30
[Table view] |
Text
!
. . i a da i
~&t(5 M e va wh av> um 1en,s
, w ,w a uuv P O lios 4 f.hq.i negpurt PA IM)?I (MP 4 Octotor 8, 1992 i
Beaver Valley twer Station Ur.il 1 - Docket IJo. 50-334, Licence lio. DPR-GG Vnit 2 - IXcket flo. 50-412, Licence flo. IIPT-73
_.lMDM1h.li!X0tilr1J1erw1_ _
U. S. fluclear Wgulatory Conniccion Docunent Control Deck Washiraton, D.C. 20500 CentIen:n:
In accordance with Ap[:endix A, 'Ibchnical Specifications, the Ibnthly Cycratity) Ikfort in nuhnitted for Unit 1 arxl Unit 2 for the Inonth of Septenir2r, 1992.
Very truly yours, g syt mg h
- 3. D. Siebor Vice Precident
!Juclear Croup D10/mny Diclosures cc: fiRC Ikgional Off ice Kiry of Pruncia, PA ,
t is el fl / ')
9210140101 920930 PDR ADOCK OS000334 R PDR g
IIARPATIVE SUHARY OF MDtfIHLY OPEPATIlG EXPERIDiCE
.. r. UNIT 1 "EPTDBER 092 T f1 ;,
fj. (s Septeder 1 %e Unh operawd at approximtely 90% output in accordanca e g<T4?ra through with the phnned fuel cycle length extemsion. >
1 '. e , ;c "f Septerber 4
. _.p; k .k; f^
Septe mer 5 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> the Unit commenced a reduction in output to approxim tely 50% to load f?llct-
', 5G:!, L, _
'g Septerher 6 no Unit continued to operate at approximately 50% outwt
~.
through while load following.
Septeder 7 SeptemLer 8 At 0315 hours0.00365 days <br />0.0875 hours <br />5.208333e-4 weeks <br />1.198575e-4 months <br /> the Unit commenced a power increa ^
k output. Approximately 90% output was ach. . M at 070! ac- I the pl uned fuel cycle lergth extension ce " led.
Sqterber >
'Ihe 1.' nit croratea . approximtely 90% outpt. ' axot t e through with *te r.raneel t'ud cycle lcrgth extension.
Septe2er 12 atenber 13 At 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br /> the Unit carenced a rcduction in output to approxistely 80% to load folic /.
Septerbcr 14 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> the Unit commnotd a pcner increase to 90%
output. Approximately 90% output was achieved et 0600 hour0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br />.s as the planned fuel cycle length eJ: tension continned. .
Septe:ter 15 The Unit operated at approximtely 90% output in accordance through with the planned fuel cycle length extension.
Septerber 19 Septe2er 20 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> the Unit comenced a reduction in "Itput to approxim tely 50% to load follow. At 1516 hours0.0175 days <br />0.421 hours <br />0.00251 weeks <br />5.76838e-4 months <br /> tne Unit comenced a pcuar increase Lo 90% outpt Approximtely 90%
output was achievo:1 at 1820 hours0.0211 days <br />0.506 hours <br />0.00301 weeks <br />6.9251e-4 months <br /> as the planned fuel cycle length extension continued.
Septerber 21 Tha Unit continued to operate at approxine aly 90% outpuc in through accordance with the planned fuel cycle length extensim.
September 30 l
i dd
~ _ - -
t AVGAGE DAILY UNIT FQiER LEVEL DOCKEI' NO. __50-334 UllIT BVPS Unit 1 DATE Cctotex 2. 1992 00!PLEITD BY David T. Jones TELEPH0tfE (412) 393-7612 MO!TIll Septerber Ev2 I DAY AVERAGE DAILY POWER LEVEL DAY j AVERAGE D*.ILY POWER LEVEL (Mie-Net) (.:.r7e-t&t) 1 725 17 717 2 738 18 733
- 3 713 19 729 4 725 20 538 (
5 708 21 721 6 345 22 ___ 725 _
7 329 23 738 j l 8 633 24 746 l
l 9 725 25 738 _
10 717 26 733 t 11 733 27 . i33 12 733 28 738 13 658 29 _
_ 742 14 704 30 746 15 721 f 16 725 INSTRUCTIONS On this forrat, list the average daily unit power level Mie-Net for each day in the reporting renth. Caepute to the naarest whole negawatt.
- 1 l
1
. _ . - - . .. .- ~ . . - .
a OPERATING DATA REPORT DOCRET No.: .50 334 REPORT DATE: 10/02/92 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393 7612 p"ERATING STATUS
- 1. UNIT NAME: BEAN 4R VALLEY POWD TATION, UNIT 1 Notes
- 2. REPORTING PERIOD: JtTTEMBER 19.
- 3. LICENSED THERMAL POWER (HWt): 2652
- 4. NAMEPLATE RATING (Gross MWe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 835
- 6. MAX, DEPENDABLE CAPACITY (Gross MWe): 860
- 7. MAX. DEPENDABLE CAPACITY (Net YWe): 810
- 8. IF CHA:!CSi JCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Not MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVF
- 11. HOURS IN REPORTINC PERIOD: 720.0 6575.0 143927.0
- 12. No. OF HRS. REACTOR WAS CRITIC : : 7?'.0 6575.0 91898.6
!). REACTOR RESERVF SHUTDOWN HOURS: v.0 0.0 4482.8 14, HOURS GENERATUR WAS ON LINE: 720.0 6575.0 90006.2 15, UN.~ RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. CROS5 THERMAL ENERGY GEN. (MWH)- 1629699.0 16578980.0 215091156.5
- 17. C".sSS E1ECT. ENERGY GEN. (MWH): 529710.0 5420760.0 69219163.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 496990.0 5108770 0 64576320.0
- 19. UNIT ""RVICE FACTOR: (PERCENT) 100.0 100.0 64.6
- 20. UNIT AVAILAEILITY FACTOR:(PERCENT) 100.0 100.0 64.6
- 21. UNIT CAPACITY FACTOR (MDC): PCT 85.2 95.9 58.2
- 22. UNIT CAPACITY FACTOR (DER): PCT 82.7 93.1 56.4
- 23. UNIT FORCED OUTACE RATE: (PERCENT) 0.0 0.0 15.7
- 24. SHUTDOWNS SCHEDULED OVER NE.XT SIX MONTHS (TYFE,DATE,AND DURATION OF EACH):
i
- 25. IF SHUT DOWN AT END OF REPCRT PERIOD, ESTIMATED PATE OF STARTbP: _
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
f FORECAST ACHIEVED l INITIAL CRITICALITY N/A N/A f I"ITIAL ELECTRICITY N/A N/A l
LOhMERCIAL OPERATION N/A N/A l
t
m . _ . _ . _ . _ ___
. b
_._ ~
t UNIT SHUTDOLWS 4.NO POWE R REDUCTIONS (220%) Docket No. 50-334 -
[
Ucit Name BVPS Unit'81 -
f Date October 2. 1992 [
j Completed By David e . Jones REPORT MOWTH SFo1EMBE0 1992 Telephane _L4'2) 393-7612 ;
Method of Licensee Cause & Corrective '
. ration shutting Event System Component Action to.
No. Date- Type 1 thours) Reason 2 Down Reactor 3 Report # Code 4 Code 5 Prevent Recurrence l l 11 920901 5 0 K 4 N/A ZZ 222ZZZ Unit centinued to operate at a reduced output of appreminately 901 !
in accordance with the planned f uet -[
cycle tength entension. !
t I
4 12 920905 s 0 H 5 N/A ZZ ZZZZ;Z units output reduced f rom approx.-
90% to approximately 50% to load
) follow. *
- j
- 11 920913 5- 0 H 5 N/A 22 222222 units output reduced from appron. !
90% to approximately 80% to load follow. -t 1- ;
f i 14 920920 S O H 5 N/A ZZ ZZZZZZ Units output reduced f rom appron. .[
902 to approsimately 50% to toad -
follow.
I
_1 1 1 2 3 4 I F-Forced Reason: Nethod: Exhibit F-Instructions for I S-Scheduled A-Equipment Failure (Esplain) 1-Manuel Preparation of Data Entry Sheets i B haintenance or fest 2-Manual Scram for Licensee Event Report (LER) File L C-tefueting 3-Automatic Scram (kUREG0161). !
D-Regulatory Restriction 4-Cont'd. from Previous Month !
E-operator Training & License Exam 5 Reduction 5 F-Administrative , 9-Other Exhibit H-Same Source.
G-Operational Error (Esplain)
H-Other (Emplain) 1 t
t
.a . . _ - i .- , -w-. , 9 .y
IMPRATIVE SlFMARY OF M0 tinily OPHRTDJG EXPERIDICE LNIT 2 SEPIDiBER 1992 Septerrber 1 'Ibe Unit operated at a nominal value of 100% output. .
thru Aih September 21 September 22 At 0838 hours0.0097 days <br />0.233 hours <br />0.00139 weeks <br />3.18859e-4 months <br /> the Unit cmmenced a load reduction to approximately 45% output. 'Ihis was initiated due to an-electrical problem with the "A" Condensate Pump while the "B" Cordensate Pump was already out of service-'for-maintenanca.
September 23 At 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> the Unit comenced a pcuer increase to 100%
output following repairs to the "A" Condensate Punp. A nortinal value of 100% output was achieved at 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br />.
September 24 'Ihe Unit operatei at a nominal value of.100% outp2t.
through Septemta 30
. - - - -e v , ,
~
AVEPME DAILY UNIT POWER LEVEL DOQET 10. 50-412 UNIT BVPS Unit 2 DATE October 2. 1992 CD4PLETED BY David T. Jon g -
TELEPHONE (412)-393-7612 FDtflH Senterber 1992 DAY AVEPM E DAILY POWER LEVEL DAY AVEPM E DAILY POWER LEVEL (FMe-Net) (MWe-Net) 1 839 17 825 2 835 18 826 3 829 19 836 4 830 20 836 5 827 21 824 6 825 22 517 7 L27 23 621 8 826 24 833 ,
3 827 25 833 10 828 _ 26 827 11 838 27 _- 828 12 838 28 834 13 834 29 836 14 830 30 837 15 827 16 826 INSIRUCTIONS On tilis fortut, list the average daily unit power level t&ie-Net for each day -in the reportirg month. Corpute to the nearest whole megawatt.
v s+-y-e m,-- p ,-4m y- r -,-,-,
+
OPERATING DATA REPURT itCKET NO.: 50 412
.7EPORT DATE: 10/02/92 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393 7612 OPERATING STATUS
- 1. UNIT NAME: BEAVEP VALLEY POWER STATION, UNIT Notes
- 2. REPORTING PERIOD: SEPTEMBER 1992
- 3. LICENSED THERMAL POWER (tGr ' . 2652
- 4. NAMEPLATE RATING (Groos MVe): 923
- 5. DESIGN ELECTRICAL RATING (Net MWe): 836
- 6. MAX. DEPENDABLE CAPACITY (Cross MWe): 870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe): 820
- 8. IF CHANGES OCCUR IN CAPACITY RATIhCS SINCE IAST REPORT, CIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): None
- 10. REASONS FOR RESTRICTIONS, IF ANY: N/A ___
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOUP.S IN REPORTING PERIOD: 720.0 6575.0 42710.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL. 720.0 5212.0 36292.2
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS CENERATOR WAS ON LINE: 720.0 5134.3 36016.3
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY CEN. (MWH): 1859358.0 12763391.0 88123138.4
- 17. CROSS ELECT. ENERGY GEN. (MWH): 616828.0 4161559.0 28335140.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH): 585585.0 3929688.0 26735173.0 19 UNIT SERVICE FACTOR: (PERCENT) 100.0 78.1 84.3
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 78.1 84.3
- 21. UNIT CAPACITY FACTOR (MDC): PCT 99.2 72.9 75.7
- 22. UNIT CAPACITY FACTOR (DER): PCT '7.3 71.5 74.9
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.3 3.4
- 24. SHUTDOWNS SCHEDULED 0"ER NEXT SIX MONTHS (TYPE,DATE, ANL DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 1
l
l 3:
5
. UNIT'SHuiD0idNS AND POWER REDUCT10ds (2201) Docket ho. 50-412 * -
I
, Unit N 'ime BYPS Untt #2 i~
uate October 2_ 1992 Completed By ,Javid T. Jones- .j l REPORT MONTH SEPTEMBER 1992 Teleptone (412) 393-7612 I Method of Licensee Cause & Corrective Duration Shutting Event Systee Component Action ta' l No. Oate typet (Hours) Reason 2 Down Reactor 3: . Report # code 4 Code 5 Prevent Recurrence 17 920922 F 0 A 5 N/A MH M010px Unit reduced output from 100% to' approximately 45% due to an-electrical problem with.the *A*
Condensate Pump's motor.
> \
i .
L
- j. i 4'
~
7 f l
.'y i
1
- i. !
v
< 1 2 3 4 i F Forced Reason: Method: Exhibit F-Instructions for' !
S-Scheduled A-Equipment falture (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or. Test 2-Manual Scram f or i.icensee Event Report (LER) File' .I C; Refueling 3-Automatic Scram -(NUREG0161). !
D-Regulatory Restricticn 4-Cont'd. from Pre.'uus Month I E-Operator Training & License Exam 5-Reduction 5' i F-Administrative 9-Other Exhibit h-Same Source. t l G-Operationat Error-(Explain)
'H-Other (Explain) i i
t i
, - _ .. . - . . _ _ _i