ML20114G018

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation of Util 830628 Justification for Operation W/Missing Pipe Restraints for High Energy Lines Outside Containment.Plant Can Be Safely Operated W/Missing Restraints Until long-term Plan Implemented
ML20114G018
Person / Time
Site: 05000000, Hatch
Issue date: 07/11/1983
From: Knight J
Office of Nuclear Reactor Regulation
To: Lainas G
Office of Nuclear Reactor Regulation
Shared Package
ML20114F930 List:
References
FOIA-84-616 TAC-51908, NUDOCS 8307200455
Download: ML20114G018 (1)


Text

'

p as:o

- l) j UNITED STATES

\\

,a 8 j -)

,'g NUCLEAR REGULATORY COMMISSION

{

g,{-(g/.:. jf WASHINGTON, D. C. 20555 y,

f

/

u M

Jul.11 1983 l

MEMORANDUM FOR: 6 Assistant Director for Operating Reactors, DL FROM:

James P. Knight, Assistant Director for Components & Structures Engineering, DE

SUBJECT:

HATCH UNIT 2 - PIPE WHIP RESTRAINT INSTALLATION -

GEORGIA POWER COMPANY PLANT NAME:

Edwin I. Hatch Nuclear Plant, Unit 2 LICENSE NO: NPF-5 DOCKET NO: 50-366 Project Manager and Branch: G. Rivenbark, ORB #4 Task

Description:

TAC #51908 Review Status: Complete The Mechanical Engineering Branch, Division of Engineering, has reviewed the subject document submitted by Georgia Power Company on June 28, 1983. An advance, handwritten copy of.our evaluation was previously furnished to you on July 1,1983. Fon.further questions contact H. Shaw at x24410.

/

- r James P. Knight, Assistant Director for Components & Structures Engineering Division of Engineering cc:

J. Stolz G. Rivenbark R. Bosnak H. Brammer H. Shaw l

wo,4cfsjC L

s, h

l a