Text
m -
. ~. -
-~
O., ;
-s.-
Wisconsin Electnc
- POWER COMPANY
. ?at w Megardo Sw 20at, w*asw.# 53204 9ta)2212345-VPNPD-92-322 NRC-92-115 October 8, 1992 Docums.it Control Desk U.S.
NUCLEAR REGULATORY COMMISSION Mail-Station F1-137 Washington, D.C.
20555 Gentlemen:
QQCEf2I'S 50-266 AND 50-3 01 MONTHLY OPERATING REPORTS POINT BEA H NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthl'; operating reports for Units 1 and 2 of the -
L Point Beach Nuclear Plant for the calendar month cf September 1992.
f Sincerely,
~
?][]D.
/
3
. -c >
Bob Link Vice President Nuclear Power l
MPB/jg cc:
L.
L.
Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector L
l
.11001I t
l 921o140000 92o93o
'iM L/-
PDR - - ADOCK--' 05000266
- R.
.lsubahiofHinwshDegrnupswx l
- _ - _ - =. _ _ -. - _ _
- Q. ~ 3 I.
OPELATING DATA REPORT DOCKET 20. 50-266 DATE: October 2, 1992 COMPLETED BY: Don C.
Teterson TELEPHONE:
414-755.121 Ext. 361 GPERATING STATUS
- 1. UNIT NAME:
POINT BEACH NUCLEAR PI. ANT - UNIT 1 NOTES
- 2. REPORTING PERIOD: Septernber - 1992
- 3. LICENSED THERMAL POWER (MWT):
1018.5 4.
NAM'? PLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
- 6. MAXIMUM DEPENDABLE C*PACITY (CROSS MWE):
509.0 t
- 7. MAXIMUM LLPENDABLE CAPACITY (NET MWE):
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LArT REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 6,575.0 191,999.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5,297.2 158,687.7
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 2.4 655.1
- 14. HOURS GENERATOR ON LINE 720.0 5,227.3 156,656.0 15.' UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS T-IERMAL ENERGY GENERATED-(MWH) 1,116,67 7,787,915 218,437,918
- 17. GROSS ELEC'IRICAL ENERGY GENERATED 370,7h0 2,652,880 73,756,610
- 18. NET ELECTRICAL ENERGY GENERATED (HWH) 354e609 2,531,777 70,281,550
- 19. UNIT SERVICE FACTOR 100.0%
79.5%
81.1%
- 20. UNIT AVAILABILITY FACTOR 100.0%
79.5%
81.5%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.5%
79.4%
75.1%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.1%
77.5%
73.7%
- 23. UNIT FORCED OUTAGE RATE O.0%
0.4%
1.7%
- 24. SHUTDOWNS SCHE ULED OVER NEXT 6 MONTHS (TYPE,'DATE, AND DURATION OF EACH):
Unit 1 Refueling and Maintenance 47 Day Outage starting 3/27/93
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, EETIMATED DATE OF STARTUP:
I
, NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 w
O
l i
i POINT BEACil NUCLEAR PLANT DOCKETNO.
f 3-2(4 A\\TRAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit J
~
MONTH SEPTEMBER - 1992 DATE October 2,1992 1
l COMPLETED BY D. C. Peterson l
l TELEPHONE 414/755-2121 AVERAGE AVERAGE AVERAG r_.
DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET l
1 4%
11 493 21 SGI 2
491 12 494 22 485 3
492 13 403 23 498 894 24 494 4
.f)2 14 25 493 5
493 15 404 6
493 16 494 26 491 7
493 17 495 27 492 2S 492 8
493 IS 494 9
493 19 493 29 493 10 491 20 479 30 492 4
PDF-0028a (0190) o
. - -... ~... ~. -
. POINT BEACH NUCLEAR PLANT Docket No; 50-266
, Unit Name '
Point Beach. Unit 1 UNIT SilbTDOWNS AND POWER REDi@ONS.
Date October 2.1902 -
-i Cornpleted By D. C. Peterson REPORT MONTH SEPTEMBtlR
. Telephone No.
414n55-2321. Ext. 361 r
Method of Shutting No.
Date Type' puration Reason:
Domm licensee Evem-Sprem Cor:ponec:
Ca.se and Coneaw,ution f
4 1
i
..(
1
't i
-j l
i I
t i
+
5 I
l F: Forced Reason:
' Method:
'E.ddbit G - Instruct:ans :
S: Scheduled.
A - Equipment Failure (explain) 1 - Manuel for preparation of
-i B. Maintenance or Testing 2 - Manual Scram data entry sheets l
' C - Refueling:
3 + Automatic Scrar..
LER file (NUREG-0161)
D - Regulatory Rostriction 4 - Continuation of Previous Shutdown 4
E - Operator Training &
.'5 - Reduced Imad
- Licensing Exar F - Administrative 6 - Other (explain)
' Exhibit 1 - Same Source G - Operational Error (explain)
' H : Other (explain)
.3 b
+
.s PBFa2Sb
. (0360).
t
+ '
n.-
t
_.. - ~ _.
,.~
~,,.
c DOCKET NO.
50-266 UNI'T NAME.
Point: Beach Nuclear Plant, Unit 1 DATE-October 2, 1992 COMPLETED BY D.
C.
Peterson TELEPHONE
. (414)755-2321, Extension 361 Unit-1 operated at approxin3tely 492 MWe net throughout this report period with no significant load reductions.
Safety-related maintenance included the following:
1.
Replaced surge suppression board on.the computer input multiplexer.
2.
Replaced auxiliary feedwater pump cubicle cooling coil--
return piping due to small hole in piping.
3.
Disassembled / reassembled component cooling water pump oiler and attached piping with thread sealant to prevent outboard bearing oil leak.
L 4.
Safety injection pump motor overcurrent relay "T"
flag dropped without device actuating.
Adjusted "T"-target such that slight vibration would not cause a-dropped flag.
l l
l -.
1 l
l' l'
l l
1 w
y 4w -
_y m
-e.i,,
y
+
~
LPERATING DATA REPJAT DOCKET NO. 50-301 DATE: October 2, 1992 COMPLETED BY: Don C.
Peterson TELEPHONE: 414-755-2321 Ext. 361 OPERATING STATUS
- 1. UNIT NAME:
POINT BEACH NUCLEAR PLANT - UNIT 2 NOTES
- 2. REPORTING PERIOD:
September - 1992
- 3. LICENSED' THERMAL POWER (MWT):
1518.5
- 4. NAMEPLATE RATING (CROSS MWE):
523.8,
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.0
- 6. MAXIMUM DEPENDA3LE CAPACITY (GROSS MWE):
509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
4 NA 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
NA
- 10. REASONS FOR RES*1AICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 6,575.0 176,784.0
- 12. NUMBER 07 MOURS REACTOR WAS CRITICAL 606.1 6,461.1 155,190.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 1.6 13.2 22D.0
- 14. HOURS GENERATOR ON LINE 604.5 6,447.9 152,937.4.
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GPOSS TUERMAL ENERGY GENERATED (MWH) 927,929 9,684,192 219,151,349 2
- 17. GROSS ELECTRICAL ENERGY GENERATED 309,980 3,~327,750 74,487,130
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 295,110 3,181,357 71,001,135
- 19. UNIT SERVICE FACTOR 84.0%
98.1%
86.5%
- 20. UNIT AVAILABILITY FACTOR-84.0%
98.1%
B6.7%
i
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 84.5%
99.8%
'82.2%
- 22. UNIT CAPACITY FACTOR (LSING DER NET) 82.51 97.4%
80.8%
- 23. UNIT FORCED' OUTAGE RATE 0.0%
0.0%
1.0%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE,'DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF. REPORT T'ERIOD, FSTIMATED.DATE OF STARTUP:
11/12/92.
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED XK NRC LETTER DATED SEPTEMBER 22, 1977 n
r n.w
a, DOCKET NO.
50 '01 UNIT NAME-Point-Beach Nuclear Plant, Unit'2
~
-DATE.
October-2, 1992 COMPLETED BY D.
C.
Peterson
_ TELEPHONE (414)755-2321, Extension 361 Unit 2 operated at an average of 410 MWe not daily throughout this report period.
On September 26, the unit was taken off line for a refueling and maintenance outage (U2R18).
LER 92-002-00, " Radioactive Waste Disposal System Component-Coolir.g Water' isolation Valves Outside Design Basis," was reported in~accordance with 10 CFR 50.73.
While~ performing hot rod drop' test, with the reactor subcritical, operators observed unexpected rod motios..
The rod bottom lights-came on:and the red position indicator went to zero.
.This was-ur. anticipated by the operating crew.
The-reactor was manually tripped.
A new rod drop test system was recently installed to allow testing of-all rod drops simultaneously.
This was the first-time the test was ured.
During the performunce of in-service testing (at cold shutdown) of the main steam line non-return check valve, the "A" valve _ failed to fully close.
The valve remained 10% open and was shut manually per procedure.
Safety-related maintenance included:
1.
Replaced original Westinghouse inverter with new Solidstate Controls, Inc. inverter, completing replacement of all~
original invertera.
2.
Disassembled containment spray pump and removed blockage from-impeller.
Reassembled and returned to service.-
l
)
l
I POINT BEACH NUCLEAR PLANT Docket No.'
50-3al -
Unit Name -
Point Beschi Unit 2 l UNIT SIIUTDiNVNS AND POWER REDl'CTIONS Date October 2.1092 '
Completed By
' D. C. Peterson REPORT MONT11 SEF' TEA 1B ER Telephone No., 414'755-2321. Ext. 361 -
Methid of Shutting Licensee Event System C.wponent Cause ark! Corrective Actwm Duration bn No.
Date Tyg OI:=rra)
Reawn' p,,,,3 Report Noi Crde*
Code' To Prevent Recarrence -
'3 920926 S
!!5.5 C
1 Scheduled refueling and maintenance outage U2R18. Major work items wiuJe: inspectwo and s
eddy current testing of steam generators; replacement of safc*y iniectkm MOV $78A. B C cuers with 15 Ft-16 nunors; D02 battery panel replacement; provide safeguards 480V buses 2-B03 and 2-B04 sith stnpping separation % awsafety related breakers; mechenical and electncal nxxiiction to the main steam iwtation valves; and clinunstion cf NIS rod drup turbine runback signal.
t l
I
'F: Forced Reason:
' Method:
Whibit G - Instructions 2
S Scheduled A - Quipment Failure (explain) 1 - Manual for preparation of
' B -' Maintenance or Testing Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
- D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous shutdown Licensing Exam 5 - Reduced load.
F - Administrative 6 - Other (explain)
' Exhibit I - Same Source G.. Operational Error (explain).
H - Other (explain) :
PBF4D28b
.., (0340) q h
+
r
+w.(
w
-w,i,.
Eu,.
~
POINT BEACH NUCLEAR PIANT DOCKET NO.
50-301 AVERAGE DAILY (1 NIT POWER LEVEL UNIT NAME Point Beach Unit 2 MONTH SEPTEMBER - IW2 DATE Octeber 2.1992 COMPLETED BY D. C. Peterson TELEPHONE 414/755-3 21 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL MWe NET DAY MWe NET DAY MWe NET DAY l
1 405 11 498 21 402 2
496 12 497 22 494 3
497 13 40S 23 478 4
497 14 497 24 480 I
407 25 454 l
5 408 15 l
497 26 4
6 498 16 7
498 17 498 27
-15 o
8 497 18 497 28 9
499 19 493 29
-3 i
10 497 20 491 30
-2 l
PBf41028a (0190) g.,
.