Monthly Operating Rept for Sept 1992 for Waterford 3.W/
ML20115A331
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/30/1992
From: Burski R, Centolanzi P
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-92-0424, W3F1-92-424, NUDOCS 9210140225
Download: ML20115A331 (7)


Text

'

w

,,g

==~ ENTERGY l"Me """ "' '"*'

~nn t 073't6774 R. F. Burski n

5%

  • s W3F1-92-0424 A4.05 QA October 9, 1992 U.S. Nuclear Regulatory Commission ATTN: Docuuient Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES 0:cket No. 50-382 L.cer.se No. NPF '38 Monthly Operating Report Gentlemen:

Attached is the subject monthly report which covers the operating statistics for the month of September, 1 92.

This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.

Very truly yours,

,/

I

/a4

/

/Ed f'M f Jtfag nt

/A

/f/cc: o J.L. Milhoan, NRC Region IV O

D.L. Wigginton, NRC-NRR R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)

J.T. Wheelock (INP0 Records Center)

NRC Resident Inspectors Office 9210140225 920930 1

ok l

'j PDR ADOCK 05000382 7

R PDR-(

\\

v

.. _ _ _ _ _ -,.. ~...

1 i:..

e a

NRC HONTHLY OPERATING REPORT-

SUMMARY

OF OPERATIONS WATERFORD 3-SEPTEMBER 1992 The un!.t operated.at an average power of 58.1% 'and' cormenced Refuel Outage' S during the pariod.

E i

3 i:

I

! ~'

i 4

h 4

?

- e F

r d 1

+---w-v~e.

r m.

.i '

e m

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of Soptember 1992, there were no pressuricer safety valve failures or challenges.

O i

b__

h I

4

,,m m--,

1

+

A b

OPERATING DATA REPORT DOCKET NAME: 50-382 UNIT NAME: WATER /ORD 3 DATE OF REPORT: OCTOBER, 1992 COMPLETED BY P. M.'.CENTOLANZI.

TELEPHONE: 504-739-6683-OPEl TING STATUS 1.

Reportir.g Period: September, 1992 Gross Hours in Reporting Period: 720 T i 2.

Currently Autnorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net Mfe): 1075' Design Electrical Rating (Net MWe) 1104 3.

Power Level to which Restricted (if any) (Net MWe): N/A 4.

Reasons for Restriction (if any):

N/A t

THIS MONTH YR TO DATE CUMULATIVE 5.

Number-of Hours Reactor was Critical 433.2 6,004.7 51,091.1 6.

Reactor Reserve Shutdown Hours 7.

Houra Generator was On-line 433.2 5,954.1 50,339.9 r

I I.

8.

Unit Reserve i

l.

Shutdown P. cars 0- ;

9.

Gross Thermal Energy 20,030,344 165,579,819 Gcnerated (MWH) 1,417,812 l -

- 10..

Cross Electrical

_6 640,160 55,511,580-y Energy Celerated (MWH) 464,290 e

l-L 11.

Net Electrical Energy Generated (MWH) 437,767 6,335,804 52,885,264 12.

Reactor Se4vice Factor 60.I 9 3 '.- 3 83;0-i

13.

Reactor Availability Factor 60.2 91.3 83.0-14.

Unit Service Factor 60.-2 90.6 81.8 ij 15.'

Unit Avnilability Factor 60.2

-90.6 81.8 16.

Unit Capacity Factor (esing'MDC)

C6.6 89.6-79.9

17. ' Unit Capacity Factor (Using DER) 55.1 87.3 77;8-18.

Unit Forced Outage Rate 2.1 4.0 l

l v

v r

.s9

.+ -

y r

y

+y-p

_...__..__.__.m_.

k 4

OPERATING DATA REPORT'

-DOCKET NAME: 50-382 UNIT NAMF WATERFORD 3-DATE OF REPORT: OCTOBER, 1992 COMPLETED BY: P. M.

CENTOLANZI TELEPHONE: 504 *s39-6683 OPERATING DATA REPORT (Con't) 19.

Shutdowns Scheduled over next 6 Month 9_(type, date and duration.of each):

20.

If Shutdown.at end of report period, estimat'ed date'of startup; N/A

-21.

Unit in commercial Operation THIS MONTH-YR TO DATE CUMULATIVE 22.

Hours is leporting Period 720.0 0,575.0 61,536.0 e3.-

Unit FcreeG OJtage Hours 125.9 2,110.7 24.

Nameplate Rating (Gross MWe): 1200 25.

If Changes occur in-Capacity Ratings (Items Number a ard 24) Since Last' Report, Give Reasons: N/A t-l i

L l

l t..

= _.

6 L

i i

1.-

f a

w-e

.c m

=

-w-e

  • u w,

N t-o<--ar 7

W w

r'

?

~..

. - ~.

Y

.N 4

AVERAGE DAILY UNIT PO,.ER LEVEL.

DOCKF.7' NAMES:50-382

' UNIT NAME: WATERFORD 3 j

DATE OF REPORT: OCTOBER, 1992 l

COMPLETED BY P.'M.

CENTOLANZI TELEPHONES.504-739-6683 MCNTH SEPIEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER-LEVEL (MWe-Net)

(MWe-Net) 1 1051 17 969 2

1052 1 ?.

946 3

1063 19 (22)-

4 1063 20 (25) 5 1061 21 (23) 6 1062 22 (15) 7 1046-23 T(14) 8 1056 24 (14) 9 1047 25 (14) 10 1029 26 (12) 11 1023 27 (11) 12 1010 28 (11)-

~

13 997 29 (10) 14 989 30 (10) 15 981 31 N\\A

' 16 97G INSTRUCTIONS-On this format, list the average d:lly unit power level in MWe-Net for each day in the reporting onth.

Compute to the nearest whole megawatt.

4 ay a

l

..m.

u

~,. ~

' 4 A

UNIT SHUTDOWNS'AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NUMBER: WATERFORD 3 DATE.OF REPORT: OCTOBER,'1992 COMPLE12D BY:

P. M. CENTOLANZI TELEPHONE:. 504-739-668.1 REPORT FOR SEPTEMBER Type Method of Shutting F = Forced Duration

-Down the Reactor or Cause, Com:nents and Number Date S = Scheduled (Hours)

Reason (1)

Reducing Power (2)

Corrective Actions _

92 920919 S

286.8 C

1 Unit RGmoved from service to begin Refuel Outage 5.

.(1)

REASON

. Failure..(explain) 1-= Manual (2) METHOD A = Equipment

'B = Maintenance or Test 2 = Hanual Scran C'= Refueling.

~3 = Automatic Sc'am D =' Regulatory Ret.t.riction.

4 = Continuation froin Previous Period L = Operator TrainingLand 5 = Power Reduction License ExaminMion, 6 = Other (e plaire)

F = Administrative G=8 wrational Error -(explain)

-H.= teher'(explain)

-