Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132D862 + (14:56:40, 12 December 2024)
- NSD-NRC-96-4913, Forwards W Responses to NRC RAI Re in-vessel Retention of Molten Core Debris & Response to NRC Request Made at 960624-26 W/Nrc AP600 PRA Meeting + (14:56:40, 12 December 2024)
- NSD-NRC-96-4874, Forwards Copies of Design Issues Tracking Repts for Human Factors Issues & Makeup of AP600 SSAR Chapter 18 to Reflect Resolution of Listed Dser Open Item Tracking Sys Items for NUREG-0711 Elements 2 & 4 + (14:56:41, 12 December 2024)
- ML20132D853 + (14:56:45, 12 December 2024)
- NSD-NRC-94-4916, Forwards Outline of Plan to Address Uncertainty of Temp Profiles for Thermal Stratification & Methods to Be Used for Review + (14:56:46, 12 December 2024)
- ML20132D850 + (14:56:46, 12 December 2024)
- ML20132D849 + (14:56:47, 12 December 2024)
- ML20132D848 + (14:56:48, 12 December 2024)
- PLA-2466, Monthly Operating Repts for Apr 1985 + (14:56:52, 12 December 2024)
- PNO-III-96-075, on 961216,hosp Performed Radiation Surveys on Packages & Found Elevated Radiation Levels at Surface of Two Packages.Licensee Survey Showed Radiation Levels of 400 Mrem Per H at Surface of Package + (14:56:52, 12 December 2024)
- ML20132D843 + (14:56:53, 12 December 2024)
- ML20132D841 + (14:56:54, 12 December 2024)
- 05000265/LER-1996-003-13, :on 961112,Unit 2 LPCI Was Declared Inoperable to 2D RHR Pump Discharge Check Valve Failure.Lpci Kf Was re-established within 1 Hour & Operability Determination Was Completed for PIF 96-3196 + (14:56:56, 12 December 2024)
- NG-96-2597, Forwards Response to RAI Re thermo-lag Related Ampacity Derating Issues + (14:56:57, 12 December 2024)
- IR 05000423/1985042 + (14:56:59, 12 December 2024)
- ML20132D830 + (14:57:00, 12 December 2024)
- TXX-4497, Forwards Public Version of Emergency Plan Procedures, Including Rev 3 to EPP-115, Release of Emergency-Related Info to Public & Rev 2 to EPP-117, Post-Accident Sampling. W/Jm Felton 850708 Release Memo + (14:57:00, 12 December 2024)
- IR 05000293/1985023 + (14:57:03, 12 December 2024)
- 05000265/LER-1996-003, Forwards LER 96-003-00 Submitted IAW Requirements of 10CFR50.73(a)(2)(v)(D).Commitments Made by Ltr,Submitted + (14:57:04, 12 December 2024)
- ML20132D826 + (14:57:04, 12 December 2024)
- ML20132D822 + (14:57:05, 12 December 2024)
- ML20132D821 + (14:57:06, 12 December 2024)
- IR 05000454/1996010 + (14:57:07, 12 December 2024)
- ML20132D816 + (14:57:08, 12 December 2024)
- ST-HL-AE-1301, Revised Final Deficiency Rept Re Undetectable Failure That Could Exist in on-line Testing Circuits for Relays in Solid State Protection Sys.Initially Reported on 820804.Revised Corrective Action Re Wiring Change Discussed + (14:57:08, 12 December 2024)
- ML20132D813 + (14:57:09, 12 December 2024)
- ML20132D811 + (14:57:10, 12 December 2024)
- ML20132D809 + (14:57:10, 12 December 2024)
- ML20132D806 + (14:57:11, 12 December 2024)
- IR 05000348/1985026 + (14:57:12, 12 December 2024)
- ML20132D801 + (14:57:13, 12 December 2024)
- ML20132D795 + (14:57:13, 12 December 2024)
- ML20132D792 + (14:57:14, 12 December 2024)
- IR 05000424/1985024 + (14:57:15, 12 December 2024)
- ML20132D789 + (14:57:15, 12 December 2024)
- ML20132D787 + (14:57:16, 12 December 2024)
- PNO-I-96-092, on 961218,accident Involving Packages Containing I-131 Occurred.Region I Immediately Contacted CIS-US & Federal Express Representative.Licensee Representative Stated,Plan to Survey Motorist Car & Home + (14:57:17, 12 December 2024)
- ML20132D781 + (14:57:18, 12 December 2024)
- ML20132D780 + (14:57:19, 12 December 2024)
- ML20132D776 + (14:57:20, 12 December 2024)
- ML20132D777 + (14:57:20, 12 December 2024)
- ML20132D770 + (14:57:21, 12 December 2024)
- ML20132D772 + (14:57:21, 12 December 2024)
- ML20132D769 + (14:57:22, 12 December 2024)
- 05000416/LER-1985-021, :on 850604,reactor Scrammed Due to Turbine Trip.Caused by Hydraulic Low Condenser Vacuum Trip mechanism.Off-normal Event Procedures Followed & Plant Stabilized.Steam Jet Air Ejector Lines Cleaned + (14:57:24, 12 December 2024)
- ML20132D764 + (14:57:25, 12 December 2024)
- ML20132D763 + (14:57:26, 12 December 2024)
- 05000277/LER-1985-003-02, :on 850603,loop a RHR Sys Injection Valve MO-2-10-154A Declared Inoperable.Caused by Mechanical Binding of Valve Stem in Valve Operator.Valve Operator Rebuilt & Returned to Svc + (14:57:28, 12 December 2024)
- ML20132D760 + (14:57:29, 12 December 2024)
- B16086, Monthly Operating Rept for Nov 1996 for Millstone Nuclear Power Station Unit 3 + (14:57:34, 12 December 2024)
- ML20132D756 + (14:57:34, 12 December 2024)