ML20132D806
| ML20132D806 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/25/1985 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Harrington W BOSTON EDISON CO. |
| Shared Package | |
| ML20132D808 | List: |
| References | |
| NUDOCS 8509300295 | |
| Download: ML20132D806 (2) | |
See also: IR 05000293/1985023
Text
.-
.
.
.
'
Docket No.
50-293
SEP 2 51985
Boston Edison Company M/C Nuclear
ATTN: Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
i
Subject:
Inspection No. 50-293/85-23
This letter and attached inspection report presents findings of a routine
safety inspection in the areas of chemistry and radiochemistry conducted by
J.
J. Kottan of this office on August 12 - 16, 1985, at Pilgrim Station, Plymouth,
Massachusetts of activities authorized by NRC License No. DPR-35 and to the
discussions of our findings held by J. J. Kottan with Mr. C. Mathis and others
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
In addition, our Mobile Laboratory was also brought to your site and used by
the inspector to make certain independent measurements. The basic purpose of
these independent measurements is to verify your capability for analyzing
radioactive effluents, and to achieve and maintain comparable methods of
analyses between your facility and the NRC. The complete data from these
-measurements will be reported in a subsequent Inspection Report.
Within the scope of this inspection, no violations were observed.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
Original Sicsod By:
/ 72
-
t
Thomas T. Martin, Director
Division of Radiation Safety
and Safeguards
Enclosure: NRC Region I Inspection Report No. 50-293/95-23
.-
8509300295 850925
ADOCK 05000293
G
OFFICIAL RECORD COPY
IR PILGRIM 85-23 - 0001.0.0
09/17/85
[
q
'l
.
,
..
.
4
Boston Edison Company M/C Nuclear
2
cc w/ enc 1:
A. V. Morist, Manager, Nuclear Management Services Department
C. J. Mathis, Station Manager
Joanne Shotwell, Assistant Attorney General
Paul Levy, Chairman, Department of Public Utilities
-W. J. Nolan, Chairman, Plymouth Board of Selectmen
Plymouth Civil Defense Director
' Senator Edward P. Kirby
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
bcc w/ enc 1:
Region I Docket Room (with concurrences)
Senior Operations Officer (w/o encl)
Section Chief, DRP
W. Raymond, SRI, Vermont Yankee
T. Shediosky,~ SRI, Millstone 1&2
H. Eichenholz, SRI, Yankee
-P. Leech, LPM, NRR
ON
RI:DRSS
RT;dl
RI:DRSS
R
K
/mmb
Pcp
k
Bellamy
Ma in
9/(1/85
9
85
9/tA/85
9/ /5
0FFICIAL RECORD COPY
IR PILGRIM 85-23 - 0002.0.0
09/12/85
. _ _ _ _ .
.
.-