ML20132D776
| ML20132D776 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/27/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20132D779 | List: |
| References | |
| NUDOCS 8508010434 | |
| Download: ML20132D776 (3) | |
See also: IR 05000424/1985024
Text
r
l[
f
.
JUN 2 71985
Georgia Power Company
ATTN: Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
REPORT N0. 50-424/85-24
On June 10 - 13, 1985, NRC inspected activities authorized by NRC Construction
Permit No. CPPR-108 for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with 10 CFR 2.790(a), a copy of this letter and enclosure will be
placed in the NRC Public Document Room unless you notify this office by telephone
within 10 days of the date of this letter and submit written application to
withhold information contained therein within 30 days of the date of this letter.
Such application must be consistent with the requirements of 2.790(b)(1).
Should you have any q,
ns concerning this letter, please contact us.
Sincerely,
\\S\\
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Re'. ort No. 50-404/85-24
c w/er.cl:
. E. Conway, Senior Vice President
. jNuclear Power
t6. O. Foster, Vice President
and General Manager Vogtle Project
(cc con't - see page 2)
8508010434 850627
ADOCK 05000424
0
ppg
ZEol *\\ n
(
m
/,
,
&
Georgia Power Company
2
JUN 2 71985
(gc cont'd)
g.H. Gregory,III, General
M nager, Vogtle Nuclear Construction
. Bockhold, Jr., Vogtle
P ant Manager
. T. Gucwa, Chief
Nuclear Engineer
Ht011e A. Thomas,
'
Vice President-Licensing Vogtle
Project
M roover, Quality
@C.W. Hayes,QAManager
surance Site Manager
< T. Beckham, Vice President
JGeneral Manager - Operations
J. A. Bailey, Project Licensing
anager
eorge F. Trowbridge, Esq.
,
Shaw, Pittman, Potts and Trowbridge
%fiice W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge
'
d rnest L. Blake, Jr., Esq.
Shaw, Pittman, Potts and Trowbridge
James E. Joiner, Troutman, Sanders,
ockerman and Ashmore
mes G. Ledbetter, Connissioner
Department of Human Resources
LGdries H. Badger, Office of
Planning and Budget, Management
Review Division
Lf(ppish Kirkland, III, Counsel
Office of the Consumer's Utility
Council
LfMIfglas C. Teper, Georgians Against
Nuclear Energy
4Lacrie Fowler, Legal Environmental
Assistance Foundation
iim Johnson, Executive Director
Educational Campaign for a Prosperous
(NoetenB.Margulies,Esq., Chairman
Administrative Judge, Atomic Safety
@andLicensingBoardfanel
. Oscar H. Paris, Administrative Judge
A,tomic Safety and Licensing Board Panel
4histave A. Linenberger, Jr., Administrative
Judge, Atomic Safety and Licensing Board
Panel
bec w/ encl:
(Seepage 3)
,
,.
f
. er -
.
Georgia Power Company
3
'JUN 2 71985
bcc w/ enc 1:
E. Reis, ELD
M. Sinkule, RII
NRC Resident Inspector
Document Control Desk
State of Georgia
RII
RII
RII
RII
-
Ww/C+
Wla)/k
GN
'GASchnebli:sa
FJape
ARKerdt
MSinhule.
06/E//85
06/t.l/85
.06/p'/85
06/)h/85
,