SEP 251995
i
Docket No. 50-278
License No. DPR-56
Philadelphia Electric Company
ATTN: Mr. S. L. Daltroff
Vice President
Electric Production
2301 Market Street
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Inspection Report No. 50-278/85-31-
- A special allegation inspection was conducted by Mr. J. J. Kottan of this
office on August 6-7, 1985, at Peach Bottom Atomic Power Station, Unit 3, of
activities authorized by NRC License No. DPR-56. Our findings were discussed
with Mr. R. Fleischmann and others of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
However, a concern was identified relative to an incident which involved the
exposures to gaseous radioactivity of individuals who entered the Unit 3
recombiner offgas tunnel on March 1, 1985.
You are requested to provide us,
within thirty days of the date of this letter, your analysis of that incident
including the final beta dose to the individuals, the radiation survey meter
response to noble gases and the resolution of Discrepancy Report 85-087
regarding the difference between the survey meter and the TLD results.
The response requested by this letter is not subject to Office of Management
and Budget restrictions as required by the Paperwork Reduction Act of 1980,
PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
Original Si8ned B71
,
8509300283 850
Ma ti
D
k
'
278
ADOCK
Division of Radiation Saf y
G
and Safeguards
Enclosure: NRC Region I Inspection Report No. 50-278/85-31
0FFICIAL RECORD COPY
ALLEG RPT PB - 0001.0.0
09/11/85
s\\
. - .
.
.
..
=
l
Philadelphia Electric Company
2
cc w/ encl:
R. S. Fleischmann, Station Superintendent
John S. Kemper, Vice President, Engineering and Research
Troy B. Conner, Jr. , Esquire
A.' J. Pietrofitta, General. Manager, Power Production Engineering, Atlantic
Electric
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire
Thomas Magette, Power Plant Siting, Nucl, ear Evaluations (Without Report)
Public Document Room (PDR)
Local Public Document Room (LPDR)
,
Nuclear Safety Information Center (NSIC)
'
NRC Resident Inspector
Commonwealth'of Pennsylvania
'
,
bec w/ encl:
L
_ Region I Docket Room (with concurrences)
- Senior Operations Officer (w/o encl)
Section Chief, DRP
R. K. Christopher, Director, Office of Investigations, Philadelphia Field
Office-
l
l
l
l
i
l
- .
l
l
[
RI:DRSS
-R
/RI:
R IkSS
.
ms
- iak
G
8ellany
T.
in
9//6/85-
9
/85-
9/\\b/85
9/d/85
9/ ,/85
0FFICIAL RECORD COPY
ALLEG RPT PB - 0002.0.0
09/11/85