._ _ _ _ _ _ _ _ _ _ _ _ _ . _ -
Northeist ' d"" su-t nean, a 0(>037 Utilities System .wnhc veilitie. Senice company P.O. Box 270 Ilartford, CT 06141-0270 (860) 665 5000 IEC i 31996 Docket No. 50423 B16086 US Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Millstone Nuclear Power Station Unit 3 Facility Operatina License Number NPF-49 Monthlv Operatina Report in accordance with the reporting requirements of Technical Specification 6.9.1.5 for Millstone Unit No. 3, enclosed in Attachment 2 is the monthly operating report for the month of November,1996.
Should you have any questions regarding this submittal, please contact Mr.
James M. Peschel at (860) 437-5840.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY As M. H. Brothers th N Unit Director, Millstone Unit 3 Attachments (2) /;c th cc: H. J. Miller, Region 1 Administator W. D. Travers, Dr., Director Special Projects A.C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 t
f annIV A 9612200099 961130~
DR ADOCK 05000423 l
a_
l i
i i
' Docket No. 50-423 ;
B16086 i I
t
-i l
i 1
l i
i i
Attachment 1 Millstone Nuclear Power Station, Unit No. 3 )
l NNECO's Commitments t
i 1
' I I
l l .
i-1 December 1996 1
4 !
k I
. _. _ __ _. ._ __ . . - ~
- U.S. Nuclser R:gulatory Commission B16086\ Attachment 1\Page 1 Enclosure l List of Regulatory Commitments i
The following table identifies those actions committed to by NNECO in this l document. Any other actions discussed in the submittal represent intended or j planned actions by NNECO. They are described to the NRC for the NRC's (
information and are not regulatory commitments. Please notify the Manager - l Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any l questions regarding this document or any associated regulatory commitments. f I
Commitment Committed Date or l Outage NONE N/A i
t l
l j
. i
- . r i . !
! 4 i
i
^
- i Docket No. 50-423 i 1
i B16086 i
.i 1
1 l,
i i
}
i
~?
I f
t l'
a 1
1 Attachment 2
}
Millstone Unit No. 3 7
i Facility Operating License No. NPF-49 '
1 I
i t
Monthlv Operatina Report j'
I i
t
- f I~
s December 1996 1
1 1
-y..., .--- -, . ~..
w.m.. . , , , , . ,.
_ . . , e - - . _ , _ , . . - r -_ .
-_. . _ . ~ - . . . . . - . - _ . _ . . . . _
1 "U.S. Nucts:r R:gul: tory Commission
'B16086\ Attachment 2\Page 1 l
l AVERAGE DAILY UNIT POWER LEVEL I DOCKET NO. 50-423 ;
UNIT Millstone Unit 3 !
DATE 12/04/96 l COMPLETED BY 1. R. Hudson l TELEPHONE (203)444-5400 l
MONTH: November 1996 l i
DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL ;
(MWe-Net) (MWe-Net) .
1 0 17 0 1 2 'O 18 O l 3 0 19 0 !
4 0 20 0 5 0 21 O )
6 0 22 0
[ 7 0 23 0
'8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0
, 15 0 31 l i.
- 16 0 l
l INSTRUCTIONS
,- s i
On this format, list the average daily unit power level in MWe-Net for each
. day in the reporting month. Compute to the nearest whole megawatt.
," ' U.S. Nucirr R gulatory Commission [
B16086\ Attachment 2\Page 2 REFUELING INFORMATION REQUEST !
November 1996 ,
I 1
- 1. Name of the facility: Millstone Unit 3 j
- 2. Scheduled date for next refueling outage: To be determined :
l
- 3. Scheduled date for restart following refueling: To be determined l
- 4. Will refueling or resumption of operation thereafter rcqeire a technical l specification change or other license amendment? i N/A.
- 5. Scheduled date(s) for submitting licensing action and supporting information:
None.
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
In Core: (a) 193 In Spent Fuel Pool: (b) 416
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present storaae capacity: 756.
No increase reauested.
1
- 9. The projected date of the last refueling that can be discharged to the {
spent fuel pool assuming present license capacity:
l End of Cvele 7. j I
l l
I
- U.S. NLicisir 4rgulttory Commission
~
- B16086\Att chmsnt 2\Prg) 3 l t
UNIT NAME Millstone Unit 3 DATE 12/04/96 OPERATING DATA REPORT COMPLETED BY 1. R. Hudson ;
TELEPHONE (203) 444-5400 '
OPERATING STATUS :
- 1. Docket Number 50-423
- 2. Reporting Period November 1996 Notes: '
- 3. Utility Contact 1. R. Hudson l
- 4. Licensed Thermal Power (MWt): 3411 i
- 5. . Nameplate Rating (Gross MWe): 1253 i
- 6. Design Electrical Rating (Net MWe): 1153.6
- 7. Maximum Dependable Capacity (Gross MWe): 1184.20
- 8. Maximum Dependable Capacity (Net MWe): 1137.00
- 9. If Changes Occur in Capacity Ratings (Items Number 4 Through 8) Since Last Report, ,
Give Reasons:
N/A
- 10. Power Level To Which Restricted, if any (Net MWe): 0
- 11. Reasons For Restrictions, if Any: NRC Category lll Facility; NRC Confirmatory Order requiring implementation of an independent corrective action verification program; NRC Order requiring a third-party review of the employee concerns program at Millstone Station; design basis verification response pursuant to 10CFR50.54(f).
i This Month Yr.-To-Date Cumulative
- 12. Hours In Reporting Period 720.0 8040.0 93000.0 13 Number Of Hours Reactor Was Critical 0.0 2158.8 67080.1
- 14. Reactor Reserve Shutdown Hours _
' O.0 0.0 6525.8
- 15. Hours Generator On-Line 0.0 2156.7 65912.4
- 16. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 17. Gross Thermal Energy Generated (MWH) 0.0 7317189.0 216937728.1
- 18. Gross Electrical Energy Generated (MWH) 0.0 2577448.5 74905103.1
- 19. Net Electrical Energy Generated (MWH) -4797.1 2431283.6 71301708.8
- 20. Unit Service Factor 0.0 26.8 70.9
- 21. Unit Availability Factor 0.0 26.8 70.9
- 22. Unit Capacity Factor (Using MDC Net) 0.0 26.6 67.3
- 23. Unit Capacity Factor (Using DER Net) 0.0 26.2 66.5
- 24. Unit Forced Outage Rate 100.0 73.2 19.8
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Shutdown at time of this report.
21 if Unit Shutdown At End Of Report Period, Estimated Date of Startup: To be determined.
- 27. Units in Test Status (Prior to Commercial Operation):
- Forecast Achieved INITIAL CRITICALITY N/A N/A l
INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
,_.m -
~ ~ '
B16086\ Attachment 2\Page 4 '
UNIT SHUTDOWNS AND POWER REDUCTIONS - , ;
DOCKET NO. 50-423 UNIT NAME Millstone Unit 3 i i DATE 12-04-96 COMPLETED BY Irene R. Hudson TELEPHONE (860) 444-5400 j REPORT MONTH: November 1996 2
No. Date Type' Duration Reason Method of License System Component Cause & Corrective ;
(Hours) Shutting Event Code' Code' Action to !
I Down Reactor' Report # Prevent Recurrence
- 96-01. 03-30-96 F 720 B/D 4 96-006-00 BA ISV Valves inoperable due to original l design deficiencies, in that an !
improper valve design did not meet GDC 57. Corrective action is to install t vendor kit to modify valve disk to '
meet GDC 57.
Continued shutdown: NRC Category Ill facility: NRC Confirmatory Order requiring independent corrective !
action verification; NRC Order requiring third-party review of t Millstone Station employee concerns j program; design basis verification for i response to NRC pursuant to 10CFR50.54(f). l t
t
'F: Forced 2
Reason Method *lEEE Standard 805-1984, S: Scheduled A - Equipment Failure (Explain) 1 - Manual " Recommended Practices B - Maintenance or Test 2 - Manual Scram for System Identification in C - Refueling 3 - Automatic Scram Nuclear Power Plants and D - Regulatory Restriction 4 - Continued from Previous Month Related Facilities" E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
F - Administrative 6 - Other (Explain) 'IEEE Standard 803A-1983, G - Operational Error (Explain) " Recommended Practices H - Other (Explain) for Unique identification in f Power Plants and Related Facilities - Component ;