Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-6247, Forwards Corrective Action Program Components & Responsibilities & Products Established by Util in Response to 861231 Requests + (ML20209B468)
- NOC-AE-000541, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Npps. Readiness Disclosure for STP, Encl + (ML20209B470)
- ML20209B473 + (ML20209B473)
- NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With + (ML20209B475)
- ML20209B476 + (ML20209B476)
- ML20209B478 + (ML20209B478)
- SVP-99-102, Summary Rept of Changes,Tests & Experiments Completed, Covering Period 990201-0430. with + (ML20209B479)
- ML20209B482 + (ML20209B482)
- ML20209B483 + (ML20209B483)
- ML20209B488 + (ML20209B488)
- ML20209B492 + (ML20209B492)
- ML20209B493 + (ML20209B493)
- ML20209B494 + (ML20209B494)
- ML20209B495 + (ML20209B495)
- ML20209B497 + (ML20209B497)
- ML20209B498 + (ML20209B498)
- NPL-99-0376, Forwards Errata to Pbnp 1998 Annual Monitoring Rept, Originally Submitted by Ltr Dtd 990427.List of Corrections, Provided + (ML20209B502)
- ML20209B503 + (ML20209B503)
- ML20209B507 + (ML20209B507)
- ML20209B508 + (ML20209B508)
- ML20209B509 + (ML20209B509)
- ML20209B510 + (ML20209B510)
- ML20209B511 + (ML20209B511)
- ML20209B513 + (ML20209B513)
- ML20209B514 + (ML20209B514)
- ML20209B515 + (ML20209B515)
- ML20209B516 + (ML20209B516)
- ML20209B517 + (ML20209B517)
- ML20209B521 + (ML20209B521)
- NOC-AE-000569, Suppl to 990607 Application for Amends to Licenses NPF-56 & NPF-80,relocating cycle-specific Operating Parameters from TS to Colr.Suppl Adds Min Measured RCS Flow to TS Section 6.9.1.9.a Which Lists Parameters Included in COLR + (ML20209B524)
- ML20209B525 + (ML20209B525)
- 05000374/LER-1986-014-06, :on 860731,electrical Terminations at Safety Relief Valve Limit Switches Found to Be Insulated W/Okonite Tape & Kapton Insulated Wire.Caused by Failure to Use Compatible T-95 Tape.Terminations Repaired + (ML20209B526)
- ML20209B527 + (ML20209B527)
- ML20209B531 + (ML20209B531)
- ML20209B532 + (ML20209B532)
- ML20209B533 + (ML20209B533)
- ML20209B534 + (ML20209B534)
- ML20209B536 + (ML20209B536)
- ML20209B537 + (ML20209B537)
- ML20209B539 + (ML20209B539)
- ML20209B541 + (ML20209B541)
- ML20209B544 + (ML20209B544)
- ML20209B545 + (ML20209B545)
- ML20209B546 + (ML20209B546)
- U-603218, Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant + (ML20209B548)
- 05000382/LER-1986-011-01, Forwards LER 86-011-01,revised Per Determination That Deviations to App R Requirements for Fire Barriers w/228 Seals Identified to Have Sleeve Type Configuration as Described in LER Not Required + (ML20209B549)
- ML20209B551 + (ML20209B551)
- ML20209B553 + (ML20209B553)
- ML20209B556 + (ML20209B556)
- ML20209B557 + (ML20209B557)
- ML20209B559 + (ML20209B559)