Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20059L03420 September 1990Forwards Addl Station Blackout Info Re Diesel Loading & Alternate Ac Analysis,Per 900404 Meeting.Info Will Be Helpful When Evaluating Unit O Diesel Generator cross-tie Mod
ML20059K67417 September 1990Suppls Responses to Violations Noted in Insp Repts 50-454/89-11,50-455/89-13,50-456/89-11 & 50-457/89-11. Corrective Actions:Procedures Changed & Valve Tagging Status Provided
ML20065D05117 September 1990Forwards Objectives & Scope of 901205 Emergency Plan ExerciseHigh Radiation Area
ML20059K50814 September 1990Forwards Tj Kovach to E Delatorre Re Visit by Soviet Delegation to Braidwood Nuclear Station in May 1990
ML20064A70914 September 1990Forwards Endorsement 133 to Nelia Policy NF-187 & Endorsement 116 to Maelu Policy MF-54
ML20059H53211 September 1990Requests Withdrawal of Application for Amend to Licenses NPF-11 & NPF-18,per 891215 & s.Amend Would Have Removed Applicability of Tech Spec (TS) 3.0.4 to TS 3.6.5.2, Secondary Containment Automatic Isolation Dampers
ML20059L66110 September 1990Forwards Byron Station Units 1 & 2 Inservice Insp Program
ML20059H4277 September 1990Provides Supplemental Response to NRC Bulletin 90-001.Plant Initial Review of Calibr Records Completed on 900831
ML20059G1616 September 1990Submits Supplemental Response to Generic Ltr 89-06, Certifying That SPDS Satisfies or Will Be Modified to Satisfy Requirements of Suppl 1 to NUREG-0737.Classroom Instruction on SPDS Incorporated Into Program
ML20059G0945 September 1990Forwards LaSalle County Station Unit 2 Third Refueling Outage,Asme Section XI Summary Rept for Spring 1990 Insp
ML20059F4894 September 1990Forwards Listing of Changes,Tests & Experiments Completed During Month of Aug 1990 for Plant
ML20059G17531 August 1990Provides Results of Util Reevaluation of Response to NRC Bulletin 85-003.Util Believes That Previous Testing Results & Subsequent Submittals Provide Assurance of Continued Operability of Sys motor-operated Valves
ML20059C68930 August 1990Forwards LaSalle County Nuclear Power Station Unit 2,Cycle 4 Startup Test Rept & Test Rept SummaryShutdown Margin
ML20059B97228 August 1990Forwards Reactor Head & Upper Shell Insp Plan,Per 900419 Meeting.Insp Plan Does Not Encompass Uppermost shell-to- Shell Weld Due to Technological LimitationsLiquid penetrant
ML20059F03127 August 1990Provides Schedule for Completion of Installation of Mods to Plants Reactor Water Level Instrumentation,Per Generic Ltr 84-23.Penetrations Will Be Installed During Outage 13 for Dresden & During Outage 12 for Quad-Cities
ML20059E95327 August 1990Forwards Summary of Fabrication History for Upper Reactor Vessel,Per 900419 Technical Meeting.Summary Indicates That Fabrication Mismatches,Considered to Be Significant for Development of Insp Plan,Identified at head-to-flange WeldHydrostatic
ML20064A37524 August 1990Forwards Revised Pages to Operating Limits Rept for Cycle 2, Correcting Fxy Portion of Rept,Per Tech Spec 6.9.1.9, Operating Limits Rept
ML20064A36824 August 1990Forwards Response to 900517 Request for Addl Info Re Design of Containment Hydrogen Monitoring Sys.Util Proposes Alternative Design That Ensures Both Containment Isolation & Hydrogen Monitoring Sys Operability in Event of LOCA
ML20059C72023 August 1990Forwards Effluent & Waste Disposal Semiannual Rept,Jan-June 1990 Gaseous Effluents-Summation of All Releases & Rev 8 to Quad-Cities Station Process Control Program for Processing of Radioactive Wet WasteProcess Control Program
ML20059D82723 August 1990Provides Written Communication Re Util Intentions & Commitments,Per 900808 Telcon W/M Wallace.Standing Order 90-24 Issued to Provide Administrative Controls Beyond Tech Spec Requirements to Assure Svc Water Pump Availability
ML20059C07822 August 1990Submits Supplemental Info to Util 900412 Response to Notice of Violation in Insp Repts 50-295/89-40 & 50-304/89-36.Info Regards Requalification program,180 H of Required Training Through SAT Process & Policy for Remediation of Individual
ML20056B40621 August 1990Submits Supplemental Response to Generic Ltr 88-14 Re Design & Verification of Instrument Air Sys.Mfg Purchase Specs & Vendor Manuals Reviewed for Air Quality Requirements
ML20056B43320 August 1990Forwards Errata,To Radioactive Effluent Rept for Jan-June 1990 & Gaseous Effluent Errata Sheet
ML20064A01816 August 1990Submits Supplemental Response to NRC Bulletin 88-008,Suppls 1 & 2.Surveillance Testing Revealed No Leakage,Therefore Charging Pump to Cold Leg Outage Injection Lines Would Not Be Subjected to Excessive Thermal StressesNondestructive Examination
Liquid penetrant
ML20059A39915 August 1990Forwards Response to NRC 900521 Request for Addl Info Re Plant Inservice Insp ProgramBoric Acid
VT-2
Scaffolding
ML20059B89614 August 1990Documents Approval of Schedular Extension & Accepts Human Engineering Discrepancies Discussed
ML20058P77913 August 1990Provides Supplemental Response to NRC Bulletin 89-001 Re Mechanical Plugs Supplied by Westinghouse,Per .All Mechanical Plugs from Heats NX-3513 & NX-4523 Removed from Hot Legs of Plant Steam Generators
ML20059D17310 August 1990Responds to NRC Re Exercise Weaknesses Noted in Insp Repts 50-373/90-05 & 50-374/90-06.Corrective Actions: LOA-FP-01, Fire Alarm Response Will Be Revised to Alert Control Room Operators to Refer to Emergency Action Levels
ML20063Q10510 August 1990Forwards Monthly Operating Repts for Jul 1990 for Byron Units 1 & 2 & Corrected Monthly Operating Rept for June 1990 for Unit 2
ML20058P3489 August 1990Forwards Summary of Fuel Performance,End of Cycle 10,May 1990. No Leakage or Fuel Failure Noted
ML20058M8227 August 1990Forwards Response to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective ActionsScram Discharge Volume
ML20058N0557 August 1990Provides Supplemental Response to NRC Bulletin 88-008, Suppls 1 & 2.Surveillance Testing Performed Revealed No Leakage,Therefore,Charging Pump to Cold Leg Injection Lines Would Not Be Subjected to Excessive Thermal StressesNondestructive Examination
Liquid penetrant
ML20058N0657 August 1990Responds to NRC Bulletin 88-009 Re Incore Neutron Monitoring Sys Thimble Tube Integrity.Thimble Tube Insps Will Be Performed at Every Refueling Outage Until Sufficient Data Accumulated on Thimble Tube Wear
ML20058N2976 August 1990Forwards Rev 34 to Security Plan.Rev Details Addl Gate Position for Security Testing & Maint.Rev Withheld (Ref 10CFR73.21)
ML20058M8046 August 1990Advises That W/Completion of Operator Training Program,Plant SPDS Meets Requirements Delineated in NUREG-0737,Suppl 1
ML20058M8596 August 1990Forwards Rept of Metallurgical Exam That Revealed No Evidence of Defects,Porosity or Slag in Weld Overlay. Rept Responds to IGSCC Insp Performed on Facility IGSCC Susceptible PipingWeld Overlay
Stress corrosion cracking
ML20056A3352 August 1990Responds to NRC Bulletin 88-009 Requesting That Addressees Establish & Implement Insp Program to Periodically Confirm in-core Neutron Power Reactors.All Timble Tubes Used at Plant Inspected & 18 Recorded Evidence of Degradation
ML20058M4101 August 1990Forwards Listing of Changes,Tests & Experiments Completed During Month of Jul 1990 for Plant
ML20058M82931 July 1990Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issue Resolved W/Imposition of Requirements of Corrective Actions. Status of Implementation of Generic Safety Issues EnclScram Discharge Volume
ML20056A02730 July 1990Provides Addl Info Re Resolution of Number of Older Licensing Issues,Including Containment Isolation Valve Position Indication,Per NRC
ML20056A07427 July 1990Forwards Justification for Rev to Installation Schedules for Two Commitments Re Safeguards Inadequacies & Program Concerns.Encl Withheld
ML20056A70327 July 1990Responds to NRC Re Violations Noted in Insp Repts 50-373/90-13 & 50-374/90-14.Corrective actions:LRP-1250-3 Revised to Include Addl Requirement for Extremity MonitoringOverexposure
ML20064A54927 July 1990Responds to NRC Re Violations Noted in Insp Repts 50-373/90-12 & 50-374/90-13.Corrective Actions:Program Implemented Identifying & Correcting Repetitive Local Leak Rate Failures Through Testing & LER Investigation
ML20055J22326 July 1990Requests Withdrawal of Proposed Amend Re Deletion of Confirmatory Order
ML20055J11926 July 1990Responds to Generic Ltr 90-04, Request for Info Re Status of Implementation of Generic Safety Issues Resolved W/ Imposition of Requirements or Corrective Actions. Current Status of Issues Encl
ML20055J16326 July 1990Forwards Reactor Containment Bldg Integrated Leak Rate Test Quad-Cities Nuclear Power Station Unit 2,900427-28, & Related Apps Describing Type a Test,Per 10CFR50,App J, Section V.B.1.Next Test Scheduled for Fall 1991
ML20055J12225 July 1990Notifies That Plants Current Outage Plannings Will Not Include Removal of Snubbers.Removal of Snubbers Scheduled for Future Outages.Completion of Review by NRC by 900801 No Longer Necessary
ML20055J12625 July 1990Notifies That Replacement of 13 Snubbers w/8 Seismic Stops on Reactor Coolant Bypass Line Being Deferred Until Later Outage,Per Rl Cloud Assoc Nonlinear Piping Analyses
ML20055H76325 July 1990Forwards Financial Info Re Decommissioning of Plants
ML20055H76624 July 1990Forwards Supplemental Response to Generic Ltr 90-04, Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions