ML23208A211 | 27 July 2023 | Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions | Shutdown Margin Reactor Vessel Water Level Packing leak Water Inventory Control Surveillance Frequency Control Program Pressure Boundary Leakage |
GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 6 June 2023 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Reactor Vessel Water Level High Radiation Area Ultimate heat sink Tornado Missile Water Inventory Control Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Condition Adverse to Quality FLEX Tornado-Generated Missile Abnormal operational transient Fukushima Dai-Ichi Seismically rugged Tornado Missile Protection Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Tornado Missile Risk Evaluator Earthquake Recently irradiated fuel Offsite Circuit Fire Protection Program |
ML23033A049 | 1 February 2023 | Emergency Action Level (EAL) Technical Bases Document Revision 3 | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Stroke time Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Cyber Security FLEX Pressure and Temperature Limits Report Surveillance Frequency Control Program Scram Discharge Volume Process Control Program Earthquake Maintenance Rule Program Fuel cladding Pressure Boundary Leakage Fire Protection Program Grace period |
ML22223A051 | 11 August 2022 | Report of Technical Specification Bases Changes | Safe Shutdown Unanalyzed Condition Shutdown Margin Ultimate heat sink Grab sample Stroke time Anticipated operational occurrence Water Inventory Control Hydrostatic Probabilistic Risk Assessment Abnormal operational transient Surveillance Frequency Control Program Feedwater Controller Failure Fuel cladding Pressure Boundary Leakage Offsite Circuit |
CNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process | 26 May 2022 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process | Surveillance Frequency Control Program |
ML21279A231 | 6 October 2021 | Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement | Shutdown Margin Packing leak Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
ML21266A161 | 23 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program Recently irradiated fuel |
ML21105A052 | 15 April 2021 | EAL Technical Bases Document Revision 1 | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Stroke time Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Cyber Security FLEX Pressure and Temperature Limits Report Surveillance Frequency Control Program Scram Discharge Volume Process Control Program Earthquake Maintenance Rule Program Fuel cladding Pressure Boundary Leakage Fire Protection Program Grace period |
ML21062A198 | 3 March 2021 | Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 | Surveillance Frequency Control Program |
ML20262H225 | 18 September 2020 | Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Using the Consolidated Line Item Improvement | Surveillance Frequency Control Program |
GNRO-2020/00022, Report of Technical Specification Bases Changes | 21 July 2020 | Report of Technical Specification Bases Changes | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio High Radiation Area Stroke time Anticipated operational occurrence Water Inventory Control Hydrostatic Operating Basis Earthquake Squib Qualified Offsite Circuit Incorporated by reference Missed surveillance Surveillance Frequency Control Program Scram Discharge Volume Feedwater Controller Failure Battery sizing Power Operated Valves Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Scaffolding |
ML20134H880 | 12 May 2020 | Technical Specification Bases 3.1 | Shutdown Margin Probabilistic Risk Assessment Squib Surveillance Frequency Control Program |
ML20134H867 | 12 May 2020 | Technical Specification Bases 2.0 | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding |
ML20134H877 | 12 May 2020 | Technical Specification Bases 3.0 | Fire Barrier Tornado Missile Internal Flooding Incorporated by reference Missed surveillance Turbine Missile |
ML20134H887 | 12 May 2020 | Technical Specification Bases 3.2 | Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding |
ML20134H889 | 12 May 2020 | Technical Specification Bases 3.3 | Shutdown Margin Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program Scram Discharge Volume Fuel cladding Recently irradiated fuel |
ML20134H931 | 12 May 2020 | Technical Specification Bases 3.4 | Grab sample Hydrostatic Abnormal operational transient Surveillance Frequency Control Program Fuel cladding Pressure Boundary Leakage |
ML20134H935 | 12 May 2020 | Technical Specification Bases 3.5 | Reactor Vessel Water Level Stroke time Water Inventory Control Operating Basis Earthquake Surveillance Frequency Control Program Power Operated Valves Fuel cladding Scaffolding |
ML20134H937 | 12 May 2020 | Technical Specification Bases 3.6 | High Radiation Area Stroke time Water Inventory Control Surveillance Frequency Control Program Recently irradiated fuel |
ML20134H950 | 12 May 2020 | Technical Specification Bases 3.7 | Safe Shutdown Water Inventory Control Surveillance Frequency Control Program Feedwater Controller Failure |
ML20134H953 | 12 May 2020 | Technical Specification Bases 3.8 | Safe Shutdown Qualified Offsite Circuit Surveillance Frequency Control Program Battery sizing Recently irradiated fuel Offsite Circuit |
ML20134H956 | 12 May 2020 | Technical Specification Bases 3.9 | Surveillance Frequency Control Program |
ML20134H959 | 12 May 2020 | Technical Specification Bases 3.10 | Shutdown Margin Water Inventory Control Hydrostatic Surveillance Frequency Control Program |
CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 | 26 February 2020 | Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 | Safe Shutdown Surveillance Frequency Control Program |
GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. | 13 June 2019 | Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. | Grace period |
GNRO-2018/00039, Report of Technical Specification Bases Changes | 20 August 2018 | Report of Technical Specification Bases Changes | Shutdown Margin Reactor Vessel Water Level Probabilistic Risk Assessment Recently irradiated fuel |
RBG-47886, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | 24 July 2018 | Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | Surveillance Frequency Control Program Recently irradiated fuel |
ML18128A052 | 30 April 2018 | License Amendment Request Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 - Evaluation of Proposed Changes | Safe Shutdown Time of Discovery Offsite Dose Calculation Manual Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Fuel cladding Grace period |
ML18128A053 | 25 April 2018 | License Amendment Request Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 - Radiological Effluent EAL Threshold Values, EP-CALC-RBS-1801, Rev. 0 | |
GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | 12 April 2018 | Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | |
GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. | 10 April 2018 | Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. | Reactor Vessel Water Level Stroke time Water Inventory Control Hydrostatic Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Power Operated Valves Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
ML18085A579 | 26 March 2018 | Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Temporary Modification Incorporated by reference Scram Discharge Volume |
RBG-47799, Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | 28 February 2018 | Application for Technical Specification Change Regarding Risk - Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) | Safe Shutdown Shutdown Margin Loop seal High Radiation Area Stroke time Internal Flooding Hydrostatic Probabilistic Risk Assessment Squib Incorporated by reference Surveillance Frequency Control Program Scram Discharge Volume Feedwater Controller Failure Large early release frequency Spiral reload Battery sizing Overtravel License Renewal Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Unidentified leakage Overspeed trip |
RBG-47801, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | 15 November 2017 | Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control | Safe Shutdown Reactor Vessel Water Level Stroke time Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Hydrostatic Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
RBG-47775, Revisions to the Technical Requirements Manual and the Technical Specification Bases | 20 July 2017 | Revisions to the Technical Requirements Manual and the Technical Specification Bases | Reactor Vessel Water Level Stroke time Hydrostatic Fuel cladding Offsite Circuit |
RBG-47605, Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation. | 20 August 2015 | Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation. | |
RBG-47603, Revisions to the Technical Requirements Manual and the Technical Specifications Bases | 11 August 2015 | Revisions to the Technical Requirements Manual and the Technical Specifications Bases | Safe Shutdown Loop seal Ultimate heat sink Fire Barrier Internal Flooding FLEX Missed surveillance Spent Fuel Pool Instrumentation Battery sizing Turbine Missile Fuel cladding Recently irradiated fuel |
GNRO-2015/00002, Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014 | 27 March 2015 | Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014 | |
GNRO-2015/00020, Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density | 27 March 2015 | Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density | |
GNRO-2014/00058, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) | 29 August 2014 | Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) | High Radiation Area Scram Discharge Volume Pressure Boundary Leakage Offsite Circuit |
GNRO-2014/00057, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) | 29 August 2014 | Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) | High Radiation Area Offsite Dose Calculation Manual Earthquake Grace period |
GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints | 1 August 2014 | License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints | Functionality Assessment |
GNRO-2014/00050, Correction of Technical Specification Typographical Error | 31 July 2014 | Correction of Technical Specification Typographical Error | |
RBG-47461, Application for Change to Technical Specification 3.8.1, AC Sources - Operating | 9 July 2014 | Application for Change to Technical Specification 3.8.1, AC Sources - Operating | Safe Shutdown Mission time Stroke time Anticipated operational occurrence Probabilistic Risk Assessment Fuel cladding Offsite Circuit |
ML13316B024 | 8 November 2013 | Application for Technical Specification Changes: Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specifications End States | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Incorporated by reference Battery sizing Maintenance Rule Program Recently irradiated fuel Offsite Circuit |
RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases | 25 July 2013 | Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases | Safe Shutdown Reactor Vessel Water Level Grab sample Fire Barrier Internal Flooding Tornado Generated Missile Turbine Missile Pressure Boundary Leakage Offsite Circuit |
RBG-47361, Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. | 16 July 2013 | Application for Technical Specification Changes Technical Specification Task Force Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. | Shutdown Margin Incorporated by reference |
GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update | 21 December 2012 | Technical Requirements Manual and Technical Specification Bases Update | Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Squib Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Fuel cladding Pressure Boundary Leakage Power change |
RBG-47300, Changes to Technical Specification 3.8.1; AC Sources - Operating | 26 October 2012 | Changes to Technical Specification 3.8.1; AC Sources - Operating | Offsite Circuit |
ML12277A081 | 2 October 2012 | Proposed Techincal Specification Changes | Safe Shutdown Reactor Vessel Water Level High Radiation Area Ultimate heat sink Post Accident Monitoring Scram Discharge Volume Fuel cladding Recently irradiated fuel Offsite Circuit Grace period |