Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation.
ML15246A120
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/20/2015
From: Brumfield T
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-47605
Download: ML15246A120 (12)


Text

"Enterg-- Directrgy Operuations,

&efomnce Rimrvermen tato Todd Brumfield Director, Regulatory & Performance Improvement RBG-47605 August 20, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Application for Technical Specification Changes for Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, "Generic Letter 2008-01, Managing Gas Accumulation"

- Supplement River Bend Station, Unit 1 Docket No. 50-458 License No. NPF-47 Reference 1. Entergy Letter; Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, "Generic Letter 2008-01, Managing Gas Accumulation" (RBG-47497) Dated September 2, 2014

2. NRC email; River Bend Station, Unit 1, Request for Additional Information Regarding TSTF - 523 (TAC No. MF4782), Dated March 27, 2015
3. Entergy Letter; Response to Request for Additional Information on Application for TSTF-523, "Generic Letter 2008-01, Managing Gas Accumulation," (RBG-47557) Dated April 28, 2015

Dear Sir or Madam:

In Reference 1, Entergy Operations, Inc. (Entergy) submitted a request for an amendment.

to the Technical Specifications (TS) for River Bend Station (RBS), Unit 1. The proposed amendment modifies the existing Surveillance Requirements (SRs) related to gas accumulation for the Emergency Core Cooling Systems (ECCS). This request was based upon Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-523, "Generic Letter 2008-01, Managing Gas Accumulation."

This initial submittal contained markups of the proposed specifications which were not in final form.

Ai¢-_

RBG-47605 Page 2 of 3 In Reference 3 in a response to an NRC Staff request for additional information (RAl),

RBS determined the notes to specifications SR 3.4.9.2 and SR 3.4.10.2 were no longer required. Revised markups of these pages were not included in that submittal. provides the final technical specification pages. There are no new commitments in this letter, If you have any questions or require additional information, please contact Mr. J. A. Clark at (225) 381-4177.

I declare under penalty of perjury that the foregoing is true and correct, executed on August 20, 2015.

NTB/JAC/bm b Attachments:

1. Final Technical Specification Pages cc: Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Blvd.

Arlington, TX 76011-4511 SNRC Senior Resident Inspector P. 0. Box 1050 St. Francisville, LA 70775 U. S. Nuclear Regulatory Commission Attn: Mr. Alan Wang MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Department of Environmental Quality Office of Environmental Compliance Radiological Emergency Planning and Response Section Ji Young Wiley P.O. Box 4312 Baton Rouge, LA 70821-4312

RBG-47605 Page 3 of 3 Public Utility Commission of Texas Attn: PUC Filing Clerk 1701 N. Congress Avenue P. 0. Box 13326 Austin, TX 78711-3326 RBF1-15-0133 LAR 2014-04

Attachment 1 RBG-47605 Final Technical Specification Pages Specification Page 3.4.9 3.4 -24 3.4.10 3.4 -26 3.5.1 3.5 -4 3.5.2 3.5-8 3.5.3 3.5 - 11 3.6.2.3 3.6 - 38 3.9.8 3.9 - 11 3.9.9 3.9- 13

RHR Shutdown Cooling System - Hot Shutdown 3.4.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.9.1-----------NOTE-------------

Not required to be met until 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after reactor steam dome pressure is less than the RHR cut in permissive pressure.

Verify one RHR shutdown cooling subsystem or 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> recirculation pump is operating.

SR 3.4.9.2-----------NOTE---------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam dome pressure is less than RHR cut in permissive pressure.

Verify RHR shutdown cooling subsystem locations 31 days susceptible to gas accumulation are sufficiently filled with water.

RIVER BEND 3.4-24 RIVE BED 3.-24Amendment No. 81-, 188

RHR Shutdown Cooling System - Cold Shutdown 3.4.10 ACTIONS (continued) ______________ __________

CONDITION REQUIRED ACTION COMPELETION TIME B. No RHR shutdown cooling B.1 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery subsystem in operation. circulating by an of no reactor coolant alternate method. circulation AND AND No recirculation pump in operation. Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.2 Monitor reactor coolant Once per hour temperature and pressure.

SURVEILLANCE REQUIREMENTS _______

SURVEILLANCE FREQUENCY SR 3.4.10.1 Verify one RHR shutdown cooling subsystem or 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> recirculation pump is operating.

SR 3.4.10.2 Verify RHR shutdown cooling subsystem locations 31 days susceptible to gas accumulation are sufficiently filled with water.

RIVER BEND 3.4-26 RIVE BED 3.-26Amendment No. 81-, 188

ECCS - Operating

, 3.5.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify, for each ECCS injection/spray subsystem, 31 days locations susceptible to gas accumulation are sufficiently filled with water.

SR 3.5.1.2-----------NOTE- -------

1. Low pressure coolant injection (LPCI) subsystems may be considered OPERABLE during alignment and operation for decay heat removal with reactor steam dome pressure less than the residual heat removal cut in .permissive pressure in MODE 3, if capable of being manually realigned and not otherwise inoperable.
2. Not required to be met for system vent flow paths opened under administrative control.

Verify each ECCS injection/spray subsystem manual, 31 days power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.5.1.3 Verify ADS accumulator supply pressure is 31 days

Ž 131 psig.

SR 3.5.1.4 Verify each ECOS pump develops the specified flow In accordance with rate with the specified pump differential pressure. the Inservice Testing Program PUMP DIFFERENTIAL SYSTEM FLOW RATE PRESSURE LPCS _>5010gpm _>282 psid LPCI >_5050 gpm > 102 psid HPCS > 5010gpm > 415psid (continued)

RIVER BEND 3.5-4 RIVERBEND .5-4Amendment No. 841-, 188

ECCS-- Shutdown 3.5.2 SURVEILLANCE REQUIREMENTS (continued)________

SURVEILLANCE FREQUENCY SR 3.5.2.2 Verify, for the required High Pressure Core Spray 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (HPCS) System, the:

a. Suppression pool water level is > 13 ft 3 inches; or
b. Condensate storage tank water level is > 11 ft 1 inch.

SR 3.5.2.3 Verify, for each required ECCS injection/spray 31 days subsystem, locations susceptible to gas accumulation are sufficiently filled with water.

SR 3.5.2.4--------------------NOTE--------------

1. One low pressure coolant injection (LPCI) subsystem may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned and not otherwise inoperable.
2. Not required to be met for system vent flow paths opened under administrative control.

Verify each required ECCS injection/spray subsystem 31 days manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

(continued)

RIVER BEND 3.5-8 RIVE BED 35-8Amendment No. 84-,188

ROIC System 3.5.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.3.1 Verify the RCIC System locations susceptible to gas 31 days accumulation are sufficiently filled with water.

SR 3.5.3.2--------------------NOTE------------------31 days Not required to be met for system vent flow paths opened under administrative control.

Verify each RCIC System manual, power operated, and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3,5.3.3--------------------NOTE---------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with RCIC steam supply pressure < 1075 psig 92 days and >_920 psig, the RCIC pump can develop a flow rate >_600 gpm against a system head corresponding to reactor pressure.

SR 3.5.3.4-----------NOTE- -------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with RCIC steam supply pressure _<165 psig 24 months and >_150 psig, the RCIC pump can develop a flow rate >_600 gpm against a system head corresponding to reactor pressure.

(continued)

RIVER BEND 3.5-11 RIVE BED 3.-11Amendment No. .8!-!44-1-68, 188

RHR Suppression Pool Cooling 3.6.2.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.3.1 Verify each RHR suppression pool cooling 31 days subsystem manual, power operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position or can be aligned to the correct position.

SR 3.6.2.3.2 Verify RHR suppression pool cooling subsystem 31 days locations susceptible to gas accumulation are sufficiently filled with water.

SR 3.6.2.3.3 Verify each RHR pump develops a flow rate In accordance

> 5050 gpm through the associated heat with the Inservice exchangers to the suppression pool. Testing Program RIVER BEND 3.6-38 RIVERBEND .6-38Amendment No. 8-4-, 188

RHR - High Water Level 3.9.8 ACTIONS (continued) __________________________

CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.3------NOTE- --

Entry and exit is permissible under administrative control.

Initiate action to close Immediately one door in each primary containment air lock.

C. No RHR shutdown cooling C.1 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from subsystem in operation. circulation by an discovery of no alternate method. reactor coolant circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND C.2 Monitor reactor coolant Once per hour temperature.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.8.1 Verify one RHR shutdown cooling subsystem is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> operating.

SR 3.9.8.2 Verify required RHR shutdown cooling subsystem 31 days locations Susceptible to gas accumulation are sufficiently filled with water.

RIVER BEND 3.9-11 RIVERBEND .9-11Amendment No. 841-, 188

RHR - Low Water Level 3.9.9 ACTIONS (continued) __________

CONDITION REQUIRED ACTION COMPLETION TIME B. (continued) B.2----------NOTE-----

Entry and exit is permissible under administrative control.

Initiate action to close Immediately one door in each primary containment air lock.

C. No RHR shutdown cooling C.1 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery subsystem in operation. circulation by an of no reactor coolant alternate method. circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND C.2 Monitor reactor coolant Once per hour temperature.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.9.1 Verify one RHR shutdown cooling subsystem is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> operating.

SR 3.9.9.2 Verify required RHR shutdown cooling subsystem 31 days locations susceptible to gas accumulation are sufficiently filled with water.

RIVER BEND 3.9-13 RIVE BED 3.-13Amendment No. 841, 188