Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with | Thermography |
ML20212D596 | 15 September 1999 | Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 | Hot Short High winds Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Earthquake Fire Protection Program |
NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with | |
NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with | 31 July 1999 | Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with | |
ML20196J425 | 30 June 1999 | Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 | |
ML20209D269 | 30 June 1999 | Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 | Feedwater Heater |
ML20196F334 | 22 June 1999 | Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 | |
ML20195F978 | 10 June 1999 | Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 | Boric Acid Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Operability Determination Liquid penetrant Overspeed trip |
NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with | 31 May 1999 | Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with | |
ML20209D275 | 31 May 1999 | Revised MORs for May 1999 for Pbnps,Units 1 & 2 | |
ML20196F352 | 30 April 1999 | Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) | Shutdown Margin Earthquake Fuel cladding |
NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With | |
NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with | |
NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with | |
ML20207D675 | 22 February 1999 | Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars | |
ML20206R900 | 13 January 1999 | SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 | Non-Destructive Examination Nondestructive Examination |
ML20206P150 | 5 January 1999 | LER 98-S03-00:on 981207,security Officer Discovered Uncontrolled Safeguards Info Drawing.Caused by Failure to Follow Established Procedures & Policies.Drawing Was Controlled by Site Security.With | Time of Discovery |
ML20216F993 | 31 December 1998 | Piedmont Municipal Power Agency 1998 Annual Rept | |
NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with | Safe Shutdown Missed surveillance |
NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with | 31 December 1998 | 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level Packing leak Non-Destructive Examination Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Hydrostatic Coatings Temporary Modification Zebra Mussel High Energy Line Break Tornado Generated Missile Foreign Material Exclusion Flow Accelerated Corrosion Process Control Program Stress corrosion cracking Eddy Current Testing Operability Determination Earthquake Biofouling Liquid penetrant Fire Protection Program Fire Watch Flow Induced Vibration Overspeed trip Water hammer |
ML20198E638 | 17 December 1998 | LER 98-S02-00:on 981130,security Access Was Revoked Due to Falsification of Criminal Record.Individual Was Escorted from Protected Area & Unescorted Access Was Restricted. with | |
ML20198C767 | 10 December 1998 | Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 | Incorporated by reference |
NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With | Enforcement Discretion |
ML20195J510 | 16 November 1998 | Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program | |
ML20198J594 | 3 November 1998 | 1998 Graded Exercise,Conducted on 981103 | Boric Acid Health Physics Network High Radiation Area Safe Shutdown Earthquake Chernobyl Fuel cladding Power change Siren Overspeed trip Potassium iodide |
NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With | |
NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored | 21 October 1998 | Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored | Safe Shutdown Fire Protection Program Hourly Fire Watch |
ML20154M912 | 14 October 1998 | Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 | Hydrostatic Nondestructive Examination VT-2 |
ML20154L675 | 14 October 1998 | Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 | Boric Acid Non-Destructive Examination Nondestructive Examination VT-2 Liquid penetrant |
ML20153G460 | 30 September 1998 | USI A-46 Seismic Evaluation Rept, Vols 1-2 | Safe Shutdown High Radiation Area Safe Shutdown Earthquake Probabilistic Risk Assessment Emergency Lighting High Energy Line Break Design basis earthquake Earthquake Scaffolding |
NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With | 30 September 1998 | Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With | |
ML17354B097 | 9 September 1998 | Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils | |
ML15261A468 | 4 September 1998 | Safety Evaluation Supporting Amends 232,232 & 231 to Licenses DPR-38,DPR-47 & DPR-55,respectively | Safe Shutdown Probabilistic Risk Assessment Maintenance Rule Program |
ML20151W385 | 31 August 1998 | Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 | |
ML20151W454 | 31 July 1998 | Corrected Page to MOR for July 1998 for Pbnp Unit 1 | |
ML20151W447 | 31 July 1998 | Corrected Page to MOR for July 1998 for Pbnp Unit 2 | |
NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 | 31 July 1998 | Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 | Missed surveillance |
ML20236Q316 | 10 July 1998 | Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 | Hydrostatic VT-2 Incorporated by reference Pressure Boundary Leakage Pressure boundary leak Through-Wall Leak |
ML20236L677 | 7 July 1998 | Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 | Safe Shutdown Safe Shutdown Earthquake Emergency Lighting Finite Element Analysis Operability Determination Earthquake Fire Protection Program |
ML20151W426 | 30 June 1998 | Corrected Page to MOR for June 1998 for Pbnp Unit 2 | |
NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 | 30 June 1998 | Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 | Missed surveillance B.5.b Mitigating Strategies |
ML20248F744 | 31 May 1998 | Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity | |
ML20151W422 | 31 May 1998 | Corrected Page to MOR for May 1998 for Pbnp Unit 2 | |
NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 | 31 May 1998 | Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 | |
ML20151W401 | 30 April 1998 | Corrected Page to MOR for April 1998 for Pbnp Unit 2 | |
NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 | 30 April 1998 | Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 | |
ML20217F313 | 17 April 1998 | Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 | High Radiation Area Hydrostatic VT-2 Liquid penetrant |
ML20216D707 | 31 March 1998 | Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 | |
ML20151W398 | 31 March 1998 | Corrected Page to MOR for March for Pbnp Unit 2 | |
NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable | 30 March 1998 | Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable | Fire Barrier Fire Protection Program |