Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217L89331 October 1999Rev 1 to BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SgsProbabilistic Risk Assessment
Nondestructive Examination
Large early release frequency
Flow Induced Vibration
ML20217F28913 October 1999Drill 99-08 Emergency Preparedness Exercise on 991013Grab sample
ML20212L1141 October 1999Safety Evaluation Granting Request for Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.cSafe Shutdown
Fire Barrier
Foreign Material Exclusion
Moisture barrier
Hemyc
Exemption Request
Continuous fire watch
Fire Protection Program
Fire Watch
0CAN109902, Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With30 September 1999Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With
RBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with30 September 1999Monthly Operating Rept for Sept 1999 for River Bend Station. with
ML20217G72130 September 1999Monthly Operating Repts for Sept 1999 for Waterford 3 Ses. with
ML20216J62727 September 1999Rev 0 to CALC-98-R-1020-04, ANO-1 Cycle 16 ColrShutdown Margin
ML20212F52622 September 1999SER Approving Request Reliefs 1-98-001 & 1-98-200,parts 1,2 & 3 for Second 10-year ISI Interval at Arkansas Nuclear One, Unit 1Liquid penetrant
ML20216G1209 September 1999Rev 3 to Rbs,Cycle 9 ColrShutdown Margin
Anticipated operational occurrence
0CAN099907, Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with31 August 1999Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with
RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With31 August 1999Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With
ML20211Q21431 August 1999Monthly Operating Rept for Aug 1999 for Waterord 3 Ses.With
ML20211F42825 August 1999Safety Evaluation Concluding That Licensee Provided Acceptable Alternative to Requirements of ASME Code Section XI & That Authorization of Proposed Alternative Would Provide Acceptable Level of Quality & SafetyProbabilistic Risk Assessment
Nondestructive Examination
Large early release frequency
Dissimilar Metal Weld
RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection6 August 1999Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection
ML20210K4723 August 1999SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate ValvesPower-Operated Valves
Backfit
0CAN089904, Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with31 July 1999Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with
RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With31 July 1999Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With
ML20210Q63631 July 1999Corrected Monthly Operating Rept for July 1999 for Waterford 3
ML20210S05831 July 1999Monthly Operating Rept for July 1999 for Waterford 3.With
ML20210K88329 July 1999Non-proprietary Addendum B to BAW-2346P,Rev 0 Re ANO-1 Specific MSLB Leak Rates
ML20210D89523 July 1999Safety Evaluation Accepting First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 - ISI-020
ML20210C6392 July 1999Rev 2 to River Bend Station,Cycle 9 Colr
0CAN079903, Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with30 June 1999Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with
RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With30 June 1999Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With
ML20209H37830 June 1999Monthly Operating Rept for June 1999 for Waterford 3 Ses. with
ML20196J80324 June 1999Rev 1 to Rbs,Cycle 9 Colr
ML20195J89517 June 1999Safety Evaluation Granting Relief for Listed ISI Parts for Current Interval,Per 10CFR50.55a(g)(5)(iii)Incorporated by reference
ML20207E8633 June 1999Safety Evaluation Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressure Safety Valves at Plant,Unit 3
ML20207E7232 June 1999Safety Evaluation Authorizing Proposed Alternative Exam Methods Proposed in Alternative Exam 99-0-002 to Perform General Visual Exam of Accessible Areas & Detailed Visual Exam of Areas Determined to Be Suspect
ML20196A62531 May 1999Non-proprietary Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SgsNon-Destructive Examination
Probabilistic Risk Assessment
Large early release frequency
Flow Induced Vibration
ML20196A01931 May 1999Monthly Operating Repts for May 1999 for Arkansas Nuclear One,Units 1 & 2.With
RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With31 May 1999Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With
ML20195K33931 May 1999Monthly Operating Rept for May 1999 for Waterford 3 Ses.With
ML20195C30428 May 1999Annual Rept on Abb CE ECCS Performance Evaluation ModelsFuel cladding
ML20195D19928 May 1999Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14Boric Acid
Nondestructive Examination
ML20206M77111 May 1999SER Accepting Relief Request from ASME Code Section XI Requirements for Plant,Units 1 & 2
0CAN059903, Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with30 April 1999Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with
RBG-45016, Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With30 April 1999Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With
ML20206S74030 April 1999Monthly Operating Rept for Apr 1999 for Waterford 3.With
ML20206F06929 April 1999Safety Evaluation Accepting Licensee Re ISI Plan for Third 10-year Interval & Associated Requests for Alternatives for Plant,Unit 1Boric Acid
Nondestructive Examination
VT-2
Incorporated by reference
ML20205T26222 April 1999LER 99-S02-00:on 990216,contract Employee Inappropriately Granted Unescorted Access to Plant Protected Area.Caused by Personnel Error.Security Personnel Performed Review of Work & Work Area That Individual Was Involved with
ML20206A21121 April 1999Safety Evaluation Authorizing Pump Relief Request PRR-001 & Valve Relief Request VRR-001 & Denying Valve Relief Request VRR-002Stroke time
Incorporated by reference
Power-Operated Valves
ML20205M69412 April 1999Safety Evaluation Granting Relief for Second 10-yr Inservice Inspection Interval for Plant,Unit 1VT-2
Incorporated by reference
Dissimilar Metal Weld
ML20205S06031 March 1999Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331Fuel cladding
ML20205R63531 March 1999Monthly Operating Repts for Mar 1999 for Ano,Units 1 & 2. with
ML20205D60631 March 1999Safety Evaluation Supporting Licensee Proposed Approach Acceptable to Perform Future Structural Integrity & Operability Assessments of Carbon SteelTime of Discovery
Nondestructive Examination
Through-Wall Leak
RBG-44969, Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With31 March 1999Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With
ML20205N96731 March 1999Monthly Operating Rept for Mar 1999 for Waterford 3 Ses.With
ML20205E85330 March 1999Corrected Pages COLR 3/4 1-4 & COLR 3/4 2-6 to Rev 1, Cycle 10, Colr
ML20205D47126 March 1999SER Accepting Util Proposed Alternative to Employ Alternative Welding Matls of Code Cases 2142-1 & 2143-1 for Reactor Coolant System to Facilitate Replacement of Steam Generators at Arkansas Nuclear One,Unit 2