ML20217C63230 September 1999Proposed Tech Specs 3/4.17.B, Control Room Emergency Filtration Sys, Eliminating Unnecessary in-place Testing of HEPA & Activated Charcoal Filters Based on Sys Operating Time
ML20212H28624 September 1999Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be RepairedEnforcement Discretion
ML20212H43524 September 1999Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge SysEnforcement Discretion
ML20211Q18410 September 1999Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement
ML20211Q7353 September 1999Proposed Its,Rev 15Safe Shutdown
Unanalyzed Condition
Time of Discovery
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Squib
Abnormal operational transient
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Process Control Program
Feedwater Controller Failure
Overtravel
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Power change
Unidentified leakage
ML20211G09225 August 1999Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS SubmittalReactor Vessel Water Level
ML20211B98613 August 1999Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year IntervalStroke time
Squib
Cold shutdown justification
ML20211C26313 August 1999Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year IntervalBoric Acid
Non-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Scram Discharge Volume
Liquid penetrant
Through-Wall Leakage
Dissimilar Metal Weld
ML20211B9996 August 1999Proposed Its,Rev 13Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Stroke time
Hydrostatic
Squib
Locked High Radiation Area
Abnormal operational transient
Fuel cladding
ML20210N0234 August 1999Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal
ML20210J16430 July 1999Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM)Fuel cladding
Power change
ML20216D60926 July 1999Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8High Radiation Area
Stroke time
Hydrostatic
Squib
ML20209H03313 July 1999Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS
ML20209D4007 July 1999Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0
ML20196K1681 July 1999Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7
ML20210A30330 June 1999Rev 14 to Fermi 2 Security Personnel Training & Qualification PlanContraband
ML20196F46824 June 1999Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8
ML20212H5042 June 1999Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS
ML20206M1127 May 1999Proposed Tech Specs Section 3.6,converting to ITSHigh Radiation Area
Stroke time
Hydrostatic
Squib
ML20206M8656 May 1999Rev 30,Vol I to Technical Requirements ManualFuel cladding
ML20206H55230 April 1999Proposed Rev 5 to Improved TS PagesHigh Radiation Area
ML20205T53620 April 1999Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg ComplexTemporary Modification
ML20196K6622 April 1999Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal
ML20205A32023 March 1999Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used
ML20211G03910 February 1999Revised ODCM, Including Revs to Revised ODCM Index,Odcm 01.01 Page 2 Paragraph 1,ODCM 02.01 Page 2 Section 1.0,ODCM 05.01 Page 2 Sections 1.0,2.0 & 3.0 & ODCM 13.05 Page 2Offsite Dose Calculation Manual
ML20203B31928 January 1999Proposed Tech Specs Page 60d,incorporating Approved Amend 103 Changes for Use by NRC in Issuing SER
ML20202D95526 January 1999Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized
ML20206P13331 December 1998Proposed Tech Specs,Revising pressure-temp Limit Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4,deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR for SLCSHydrostatic
ML20198D13914 December 1998Rev 28 to Vol 1 of Technical Requirements Manual
ML20198B81210 December 1998Rev 27 to Fermi 2 Technical Requirements Manual,Vol I
ML20155A71122 October 1998Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose
ML20154Q07715 October 19986 to Fermi 2, Technical Requirements Manual, Vol IReactor Vessel Water Level
ML20154L95512 October 1998Proposed Tech Specs Re Rev of Statement on Normal Shift Length & Other Misc ChangesSafe Shutdown
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Scram Discharge Volume
Process Control Program
Fuel cladding
Pressure Boundary Leakage
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
ML20154L9049 October 1998Proposed Tech Specs,Incorporating Proposed Changes Re Surveillance Test Interval/Aot Extension Program
ML20154M4619 October 19985 to Vol 1 of Fermi 2 Technical Requirements ManualScram Discharge Volume
ML20154H8938 October 1998Rev 24 to Fermi 2 Technical Requirements Manual,Vol ISafety Limit Minimum Critical Power Ratio
Abnormal operational transient
Fuel cladding
ML20154E56228 September 1998Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TSSafe Shutdown
Reactor Vessel Water Level
Anticipated operational occurrence
Post Accident Monitoring
Scram Discharge Volume
Battery sizing
ML20153F01925 September 1998Proposed Tech Specs Pages Re Condensate Storage Tank Low Level Hpci/Rcic Suction Transfer
ML20153F39323 September 1998Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1
ML20237E89826 August 1998Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a
ML20237E97720 August 1998Rev 4 to EWI-09.04.01, Inservice Testing ProgramHigh Radiation Area
Stroke time
Squib
Scram Discharge Volume
Power-Operated Valves
Power Operated Valves
ML20237D63118 August 1998Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1
ML20236W47031 July 1998Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for OperationReactor Vessel Water Level
ML20236U46023 July 1998Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals
ML20236U04216 July 1998TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change
ML20236P5421 July 1998Proposed Tech Specs Pages 30,50 & 53 Containing Administrative Changes Re Power Rerate Program
ML20236F06726 June 1998Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904Squib
ML20249C51219 June 1998Proposed Tech Specs Pages Re Rev 2 to 960726 LAR to License DPR-22,to Establish TS Requirements That Are Consistent W/Analysis Inputs Used for Evaluation of Radiological Consequences of MSLB Accident
ML20236P92410 June 1998Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1Shutdown Margin
High Radiation Area
Offsite Dose Calculation Manual
Process Control Program
Earthquake
ML20248L8025 June 1998Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High FlowMinimum Critical Power Ratio