Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217K968 | 19 October 1999 | Ack Receipt of Transmitting Rev 40 to Physical Security Plan for Washington Nuclear Plant 2.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required | |
ML20211A950 | 12 August 1999 | Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl | |
ML20210L146 | 3 August 1999 | Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams | Generic Fundamentals Examination |
ML20206U450 | 19 May 1999 | Ack Receipt of Which Transmitted Rev 39 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required,Since Changes Do Not Decrease Effectiveness of Security Plan | |
ML20196K696 | 30 March 1999 | Ack Receipt of ,Transmitting Rev 38 to Physical Security Plan for Plant.No NRC Approval Is Required,In Accordance with 10CFR50.54(p) | |
ML20204F026 | 19 March 1999 | Forwards Insp Rept 50-397/99-01 on 990201-04 & 0303-05.No Violations Noted.Areas of Physical Security Plan Effectively Implemented with Listed Exceptions | |
ML20203B900 | 8 February 1999 | First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Already Available in PDR, Documents in App B Released in Entirety & Documents in App C Being Withheld in Part (Ref Exemption 6) | |
IR 05000397/1998201 | 9 December 1998 | Forwards Insp Rept 50-397/98-201 (Operational Safeguards Response Evaluation) on 980921-24.Insp Rept Contains Safeguards Info Per 10CFR73.21.Without Encl.No Violations Noted | |
ML20154H713 | 13 October 1998 | Responds to 980911 Request for Reconsideration of Severity Level III NOV Issued on 980220 to WNP-2 for Violations of TS & 10CFR50.59.NRC Withdrawing Four Violations Grouped Into Severity Level III & Issuing Single Several Level Iv,Encl | |
ML20236W527 | 31 July 1998 | Confirms Telcon That Involved Representatives from NRR, Region IV & WPPSS Staff Re Operational Safeguards Response Evaluation Scheduled for 980921-24 at WPPSS Nuclear Project 2 Facility | |
ML20236L886 | 6 July 1998 | Ltr Contract:Task Order 14, WNP2 Safety Sys Engineering Insp, Under Contract NRC-03-98-021 | |
ML20236H875 | 1 July 1998 | Ltr Contract:Task Order 13, WNP2 Corrective Action Team Insp Under Contract NRC-03-98-021 | |
ML20249C814 | 26 June 1998 | Ack Receipt of from P Bemis & Discussions Between E Merschoff & V Parrish on 980622 Re Briefing by Supply Sys on Licensee C/As Re Fire Header Line Break Event on 980617.Arrangements for Meeting to Be Discussed W/Staff | |
ML20236J987 | 24 June 1998 | First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety | |
IR 05000397/1998002 | 24 April 1998 | Forwards Insp Rept 50-397/98-02 on 980406-09.No Violations Noted.Areas Examined Included Portions of Physical Security Program | |
ML20217B888 | 20 April 1998 | Ack Receipt of Ltr Which Transmitted Changes to Physical Security Plan & Informs That No NRC Approval Required | |
ML20217B796 | 20 April 1998 | Ack Receipt of ,Which Transmitted Rev 37 to Plant Physical Security Plan.Changes Do Not Decrease Effectiveness of Security Plan,Iaw 10CFR50.54(p) | |
ML20199A368 | 21 January 1998 | Forwards ERDS Implementaion Documents,Including Data Point Library 246 for Hatch,246 for McGuire & 247 for WNP2.Changes Should Be Made as Soon as Possible.W/O Encl | |
ML20198J513 | 7 January 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-397/97-07.Actions Will Be Reviewed During Future Insp to Determine That Full Compliance Has Been Achieved & Will Be Maintained | |
ML20197B221 | 19 December 1997 | Ack Receipt of Ltr Dtd 970509,transmitting Rev 35 to Physical Security Plan for Plant | |
ML20199E301 | 18 November 1997 | Forwards Insp Rept 50-397/97-07 on 971020-26 & NOV Re Gap in Vehicle Barrier Sys That Provided Pathway for Design Basis Vehicle to Gain Unauthorized Proximity to Vital Areas | |
ML20140G634 | 7 May 1997 | Forwards ERDS Implementation Documents Including Data Point Library Updates for McGuire Number 224,WNP2 Number 225, Beaver Valley Number 226 & Calvert Cliffs Number 227. W/O Encl | |
ML20138K054 | 7 May 1997 | Forwards ERDS Implementation Documents & Data Point Library for Listed Plants.W/O Encl | |
ML20137H089 | 27 March 1997 | Ack Receipt of Which Transmitted Change 34 to Physical Security Plan for Washington Nuclear Plant-2,per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan. W/O Encl Per 10CFR73.21 | |
ML20136G556 | 14 March 1997 | Ack Receipt of & Wire Transfer of Payment for Civil Penalty Imposed by NRC in | |
ML20136B793 | 6 March 1997 | Forwards Insp Rept 50-397/97-02 on 970127-31 & 0212-14. Inspector Determined That Physical Security Program Was Effectively Implemented | |
ML20135E516 | 4 March 1997 | Ack Receipt of Transmitting Changes to Physical Security Plan for Washington Nuclear Plant 2,rev 33.Based on Determination That Changes Do Not Decrease Effectiveness of Security,No NRC Approval Required | |
ML20134L326 | 14 February 1997 | Discusses in Response to 961126 NOV & Proposed Imposition of Civil Penalty & Forwards Order Imposing Civil Monetary Penalty - $100,000 | Enforcement Discretion |
ML20134H152 | 7 February 1997 | Fourth Partial Response to FOIA Request for Documents. Forwards Documents Identified in App G & H Being Made Available in PDR | |
ML20132E343 | 19 December 1996 | Fowards Emergency Response Data System Implementation Documents.W/O Encl | |
ML20133C894 | 16 December 1996 | Forwards Insp Rept 50-397/96-23 on 961118-22.No Violations Noted | |
ML20132F152 | 13 December 1996 | Ack Receipt of Which Transmitted Changes to Physical Security Plan,Rev 32.No NRC Approval Required for Implementation of Changes,But Changes Will Be Subj to Insp | |
ML20149G201 | 1 September 1994 | Ltr Contract,Mod 4 to Task Order 22,extending Period of Performance at No Addl Cost,To IPE Reviews,Internal Events - Human Reliability Analysis Only (Washington Nuclear 2) | |
ML20059L503 | 28 January 1994 | Extends Invitation to Participate in Workshop Re Emergency Preparedness & Incident Response on 940222 in Arlington,Tx | |
IR 05000397/1993048 | 15 December 1993 | Forwards Insp Rept 50-397/93-48 on 931116-23 & Nov.Violation of Concern Because It Appears to Be Repeat of Previous Problems.Encls Withheld (Ref 10CFR2.790) | |
ML20058F968 | 16 November 1993 | Forwards Safeguards Info Ref in SECY-93-270 Re Proposed Amend to 10CFR73 to Modify Design Basis Threat for Radiological Sabotage to Include Use of Land Vehicle by Adversaries.Safeguards Info Withheld | |
IR 05000397/1993034 | 2 November 1993 | Forwards Insp Rept 50-397/93-34 on 930929-1006.No Violations Noted.Encl Withheld (Ref 10CFR2.790) | |
ML20059B265 | 25 October 1993 | Forwards SER & TER Re Topical Rept WPPSS-FTS-129 BWR Transient Analysis Model. Topical Rept & Supporting Submittals Acceptable | |
IR 05000397/1993020 | 15 October 1993 | Discusses Insp Rept 50-397/93-20 on 930402-0517 & Forwards Notice of Violation.Violation of Concern Because of Apparent Misconduct of Personnel Involved W/Falsification of Plant Records | Fire Watch |
ML20059J073 | 29 September 1993 | Ltr Contract,Definitizing Task Order 14, Emergency Operating Procedures - WNP2 | |
ML20059D669 | 24 September 1993 | Ltr Contract,Awarding Task Order 22, Individual Plant Exam (IPE) Reviews,Internal Events - Human Reliability Analysis Only (Washington Nuclear 2) | |
ML20059D690 | 23 September 1993 | Ltr Contract Awarding Task Order 21,to IPE Reviews,Internal Events - Front End Only (Washington Nuclear 2), to NRC-04-91-066 | Mission time |
ML20059C664 | 23 September 1993 | Ltr Contract,Awarding Task Order 22, Individual Plant Exam (IPE) Reviews,Internal Events,Back End Only (Washington Nuclear 2) | Mission time |
ML20057C662 | 27 August 1993 | Forwards Insp Rept 50-397/93-28 on 930809-13.No Violations Noted | |
ML20126J860 | 30 December 1992 | Advises That Rev 12 to Facility Number 2 Contingency Plan Is Consistent W/Provisions of 10CFR50.54(p) & Acceptable | |
ML20126J885 | 30 December 1992 | Advises That 920805 Rev 23 to Facility Physical Security Plan Is Consistent W/Provisions of 10CFR50.54(p) & Acceptable | |
ML20127F059 | 30 December 1992 | Forwards Insp Rept 50-397/92-34 on 921207-11.No Violations Noted | |
ML20127E369 | 1 October 1992 | Responds to Undated Ltr (Received on 920908) Forwarding Objectives & Limitations for Plant Annual Emergency Exercise Scheduled for 921208.Exercise Objectives & Limitations Appear Adequate to Meet Emergency Plan Goals & Requirements | |
ML20059M092 | 27 September 1990 | Advises That Name Will Be Removed from Mailing List Unless Notification of Wish to Remain on List to Continue to Receive Info Re Facility Received within 30 Days | |
IR 05000397/1990019 | 3 August 1990 | Forwards Safeguards Insp Rept 50-397/90-19 on 900723-27.One licensee-identified Violation Re Removal of Keyclad from Protected Area & Another Re Failure to Search Vehicle Cargo Compartment Reviewed.Rept Withheld (Ref 10CFR73.21) |