Issue date | Title | Topic | |
---|---|---|---|
ML19071A030 | 13 March 2019 | Summary of Public Meeting to Describe Requests Omaha Public Power District for Partial Site Release from NRC Control of the Fort Calhoun Station | |
ML19070A307 | 28 November 2018 | FCS Partial Site Release Meeting Summary | |
ML17167A262 | 27 June 2017 | Summary of 5/31/2017 Meeting at Double Tree Hotel, Omaha, Ne, to Discuss and Accept Comments Regarding the Fort Calhoun Station Post-Shutdown Decommissioning Activities Report | Aging Management |
ML16298A291 | 27 October 2016 | Summary of Presubmittal Teleconference with Omaha Public Power District to Discuss Decommissioning Licensing Actions for Fort Calhoun Station, Unit No. 1 | |
ML16259A113 | 20 September 2016 | 9/13/16 Summary of Presubmittal Teleconference with Omaha Public Power District to Discuss License Amendment Request for Use of a Different Methodology for Evaluating Certain Class 1 Structures at Fort Calhoun, Unit 1 | |
ML16036A350 | 23 February 2016 | 2/3/16 Summary of Teleconference Meeting with Omaha Public Power District to Discuss Proposed Request to Revise Table S-2, Plant Modifications Committed, for the NFPA 805 Amendment Issued 6/16/14 for Fort Calhoun Station, Unit 1 | |
ML15114A378 | 7 May 2015 | 4/23/15 Summary of Pre-application Meeting with Omaha Public Power District, Proposed License Amendment Requests to (1) Reclassify Systems Based on ANSI 58.14 and (2) Adopt American Concrete Institute Code ACI-318 (1971) for Fort Calhoun St | Hydrostatic |
ML15105A470 | 15 April 2015 | Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements | Fire impairment |
ML14344A087 | 19 December 2014 | 12/2/2014 Summary of Meeting with Omaha Public Power District to Discuss Containment Internal Structures at Fort Calhoun Station, Unit 1 | |
ML14230A080 | 21 August 2014 | Memorandum to File, Verbal Granting of Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building | |
ML14175A518 | 11 August 2014 | Summary of Category 1 Public Meeting with Exelon to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons Learned Near-Term Task Force Recommendation 2.1, Seismic | Safe Shutdown Earthquake Probabilistic Risk Assessment |
ML14192A982 | 6 August 2014 | Summary of Meeting with Omaha Public Power District to Discuss License Amendment to Revise TS 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem, or Component Due to Inoperable Power Source | |
ML14163A002 | 16 June 2014 | Summary of Audit Conducted March 5-9, 2012, Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants | Safe Shutdown Probabilistic Risk Assessment |
ML14156A283 | 16 June 2014 | Summary of 5/22/2014 Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station | |
ML14147A359 | 9 June 2014 | Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station | |
ML14139A358 | 5 June 2014 | 5/9/2014 Summary of Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station | |
ML14139A344 | 29 May 2014 | Summary of Closed Meeting Between Representatives of the Nuclear Regulatory Commission, Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Analysis | |
ML14143A289 | 23 May 2014 | May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station | Spent Fuel Pool Instrumentation |
ML14065A253 | 5 March 2014 | Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station | Spent Fuel Pool Instrumentation |
ML14031A162 | 10 February 2014 | Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station | |
ML13339A724 | 5 December 2013 | Meeting Summary Slides | Tornado Generated Missile Tornado Missile Protection Spent Fuel Pool Instrumentation Exemption Request |
ML13338A299 | 2 December 2013 | Summary of Public Meeting in Omaha, Ne | |
ML13220A779 | 8 August 2013 | Summary of July 24, 2013 Meeting with Omaha Public Power District | Tornado Generated Missile Tornado Missile Protection |
ML13134A186 | 3 June 2013 | 4/22/2013 - Summary of Meeting with Omaha Public Power District - Potential License Amendment Requests for Fort Calhoun, Unit 1 Related to Flood Protection for Raw Water System, Tornado Missile Protection, Piping/Code Use, and Alternate Sei | Functionality Assessment Tornado Generated Missile Tornado Missile Protection |
ML13144A776 | 24 May 2013 | Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection | |
ML13114A881 | 25 April 2013 | 4/22/2013 - Summary of Closed Meeting with Omaha Public Power District to Discuss Flooding Issues Associated with Fort Calhoun, Unit 1 | |
ML13093A473 | 3 April 2013 | Summary of Meeting with Omaha Public Power District | |
ML12366A032 | 25 January 2013 | Summary of Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 | |
ML12338A191 | 3 December 2012 | Meeting Summary with Omaha Public Power District to Discuss Update of Issues and Oversight Activities at Fort Calhoun Station | Fire Barrier |
ML12269A224 | 25 September 2012 | Meeting Summary of with Omaha Public Power District | |
ML12220A377 | 3 August 2012 | Summary of Meeting with Omaha Public Power District | |
ML12104A264 | 13 April 2012 | 4/4/12 Summary of Meeting with Omaha Public Power District, Fort Calhoun Station | |
ML120400458 | 9 February 2012 | Summary of Meeting with Omaha Public Power District to Discuss Specifics of the Transition of Fort Calhoun Station to Regulatory Oversight Under the NRC Inspection Manual Chapter 0350 Process | |
ML112211617 | 5 August 2011 | 7/27/2011- Summary of Public Meeting with Omaha Public Power District to Discuss Post-Flooding Recovery Actions for Fort Calhoun Station | |
ML111680151 | 11 July 2011 | 5/26/11 Summary of Prelicensing Meeting with Omaha Public Power District to Discuss License Amendment Request to Adopt Risk-Informed National Fire Protection Association Standard NFPA 805 or Fort Calhoun Station, Unit 1 | Probabilistic Risk Assessment Fire Protection Program |
ML111660027 | 14 June 2011 | Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding | |
ML111020407 | 17 May 2011 | Summary of 03/02/11 Closed Pre-Licensing Teleconference with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Control Rod Withdrawal at Power | |
ML111101437 | 17 May 2011 | Summary of Pre-Licensing Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification | |
ML111020136 | 12 April 2011 | Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance | |
ML110260006 | 7 February 2011 | Summary of 1/13/2011 Pre-Licensing Meeting with Omaha Public Power District to Discuss Fort Calhoun Station'S Extended Power Uprate, Spent Fuel Pool Criticality, and Proposed License Amendment Request Modeled After TSTF-493 | |
ML102380230 | 26 August 2010 | Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding | |
ML102110137 | 6 August 2010 | Summary of 7/16/2010 Conference Call with Licensee to Discuss the 10/14/2008 Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | |
ML101940301 | 29 July 2010 | 6/30/2010 Summary of Teleconference Meeting with Omaha Public Power District to Discuss NRC Staff Request for Additional Information Dated 2/12/2010 on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 | |
ML101460629 | 26 May 2010 | Summary of Public Meeting with Omaha Public Power District on the Fort Calhoun Station 2009 Performance | |
ML100620072 | 23 March 2010 | Summary of Category 1, Teleconference with Omaha Public Power District to Discuss NRC Staff Request for Additional Information on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 | |
ML093140177 | 18 November 2009 | Summary of November 5, 2009, Category 1 Meeting with Omaha Public Power District to Discuss Plans for Extended Power Uprate License Amendment Request for Fort Calhoun Station, Unit 1 | |
ML091680138 | 30 June 2009 | Summary of Conference Call Regarding Issues Related to the Cracking of Mitsubishi Heavy Industries Ltd.-Fabricated Replacement Steam Generators for San Onofre Nuclear Station, Unit 3 | |
ML091240596 | 4 May 2009 | Meeting Summary, 2008 EOC Public Meeting with Omaha Public Power District on Fort Calhoun Station | |
ML090370643 | 13 February 2009 | Summary of Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 | Fire Protection Program |
ML090370411 | 13 February 2009 | Summary of Meeting with Omaha Public Power District to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 |