NRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | 7 July 2023 | Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | |
NRC 2023-0006, Post-Exam Submittal Cover Letter | 1 March 2023 | Post-Exam Submittal Cover Letter | |
NRC 2023-0005, Report of Changes to Emergency Plan | 21 February 2023 | Report of Changes to Emergency Plan | |
NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan | 30 September 2022 | Sixth 10-Year Interval Inservice Testing (1ST) Program Plan | Safe Shutdown Boric Acid Shutdown Margin Stroke time Hydrostatic Incorporated by reference Aging Management Missed surveillance Large early release frequency Cold shutdown justification Fire Protection Program |
NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System | 26 September 2022 | License Amendment Request 295, Beacon Power Distribution Monitoring System | Shutdown Margin Probabilistic Risk Assessment Surveillance Frequency Control Program |
NRC 2022-0019, Report of Changes to Emergency Plan | 13 July 2022 | Report of Changes to Emergency Plan | |
NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, | 11 July 2022 | Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, | Safe Shutdown High winds Ultimate heat sink Hydrostatic Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Large early release frequency Turbine Missile |
NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report | 27 April 2022 | Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report | |
NRC 2022-0014, 2021 Annual Monitoring Report | 14 April 2022 | 2021 Annual Monitoring Report | Grab sample Offsite Dose Calculation Manual Hydrostatic Met Tower Chernobyl |
NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) | 7 April 2022 | Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) | Shutdown Margin |
NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process | 25 March 2022 | License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process | |
NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections | 22 February 2022 | Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections | Aging Management EVT-1 |
NRC 2022-0004, Report of Changes to Emergency Plan | 9 February 2022 | Report of Changes to Emergency Plan | |
NRC 2022-0005, Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations | 1 February 2022 | Refueling Outage U2R38 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations | Through-Wall Leak |
NRC 2022-0001, Report of Changes to Emergency Plan | 11 January 2022 | Report of Changes to Emergency Plan | |
NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) | 28 October 2021 | Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) | Shutdown Margin |
NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 | 15 July 2021 | Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 | |
NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 | 30 June 2021 | Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 | |
NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism | 23 June 2021 | Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism | |
NRC 2021-0021, 2020 Annual Monitoring Report | 29 April 2021 | 2020 Annual Monitoring Report | |
NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations | 22 April 2021 | Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations | |
NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report | 2 April 2021 | CFR 50.59 Evaluation and Commitment Change Summary Report | Surveillance Frequency Control Program |
NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary | 2 April 2021 | Technical Specification Bases and Technical Requirement Manual Change Summary | |
NRC 2021-0006, Report of Changes to Emergency Plan | 18 March 2021 | Report of Changes to Emergency Plan | |
NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 | 11 February 2021 | Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 | Exemption Request |
NRC 2021-0002, Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations | 21 January 2021 | Refueling Outage U1 R39 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations | |
NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report | 21 January 2021 | Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report | Finite Element Analysis Aging Management Liquid penetrant |
NRC 2021-0001, Report of Changes to Emergency Plan | 13 January 2021 | Report of Changes to Emergency Plan | |
NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise | 8 December 2020 | Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise | Exemption Request Pandemic Coronavirus |
NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses | 16 November 2020 | Application for Subsequent Renewed Facility Operating Licenses | Subsequent License Renewal |
NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) | 2 November 2020 | Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) | Shutdown Margin |
NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 | 5 October 2020 | NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 | High Radiation Area Significance Determination Process Foreign Material Exclusion RAMQC Control of Heavy Loads Coronavirus COVID-19 Preliminary White Finding Exclusive Use |
NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss | 15 September 2020 | Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss | |
NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements | 17 August 2020 | Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements | Exemption Request Pandemic Coronavirus COVID-19 |
NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss | 13 August 2020 | License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss | Safe Shutdown Pandemic Coronavirus COVID-19 Fuel cladding |
NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations | 12 August 2020 | NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations | |
NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding | 12 August 2020 | Response to NRC Inspection Report and Preliminary White Finding | Preliminary White Finding |
NRC 2020-0018, Report of Changes to Emergency Plan | 15 July 2020 | Report of Changes to Emergency Plan | |
NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic | 12 June 2020 | Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic | Fitness for Duty Enforcement Discretion Exemption Request Pandemic Coronavirus COVID-19 |
NRC 2020-0012, Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations | 20 May 2020 | Refueling Outage U2R37 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations | |
NRC 2020-0008, Report of Changes to Emergency Plan | 6 April 2020 | Report of Changes to Emergency Plan | |
NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) | 27 March 2020 | Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) | Shutdown Margin |
NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis | 6 February 2020 | License Amendment Request 289: Tornado Missile Protection Licensing Basis | Safe Shutdown High winds Tornado Missile Enforcement Discretion Tornado Generated Missile Tornado Missile Protection Earthquake |
NRC 2020-0001, Pressure Temperature Limits Report (PTLR) | 9 January 2020 | Pressure Temperature Limits Report (PTLR) | Hydrostatic Pressure and Temperature Limits Report |
NRC 2019-0044, Report of Changes to Emergency Plan | 1 November 2019 | Report of Changes to Emergency Plan | |
NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report | 18 October 2019 | Submittal of 2018 Update to Final Safety Analysis Report | Aging Management |
NRC 2019-0037, Technical Specification Bases Change Summary | 18 October 2019 | Technical Specification Bases Change Summary | Surveillance Frequency Control Program |
NRC 2019-0034, Technical Requirements Manual Change Summary | 18 October 2019 | Technical Requirements Manual Change Summary | |
NRC 2019-0032, CFR 50.59 Evaluation and Commitment Change Summary Report | 18 October 2019 | CFR 50.59 Evaluation and Commitment Change Summary Report | |
NRC 2019-0042, NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information | 17 October 2019 | NextEra Energy Point Beach, LLC, Relief Request 1-RR-13 and 2-RR-13, Response to Request for Additional Information | |