RA-86-0143, Forwards Review & Comments on 860819 Reactor Operator & Senior Reactor Operator Exams

From kanterella
Jump to navigation Jump to search
Forwards Review & Comments on 860819 Reactor Operator & Senior Reactor Operator Exams
ML20214K492
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/22/1986
From: Kelley L
FLORIDA POWER CORP.
To: Munro J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20214K447 List:
References
TRA-86-0143, TRA-86-143, NUDOCS 8612020322
Download: ML20214K492 (46)


Text

'

'999 9

( 00* ENCLOSURE 3 g

Power C OR POR ATIO N CD ic S: 6 i August 22, 1986 G ?, _ E$

TRA 86-0143 So b-

?$ ,j <

c>:= --

ro Mr. John Munro PQ O O Chief, Operator Licensing Section m Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, Georgia 30323

Subject:

Crystal River Unit 3

('] 8/19/86 NRC-Issued License Exam

's ]

Dear Mr. Munro:

As per the current practice for examination reviews after NRC-issued operator examinations, please find enclosed our review and comments on the August 19, 1986, Reactor Operator and Senior Reactor Operator Examinations given at Crystal River Unit 3. We are including our comments and recommended action for each question under review.

If you desire any further information, please contact Mr. Johnie Smith, Nuclear Operations Training Supervisor, at (904) 795-0504, Ext. 107. Thank you for your attention in this very important matter.

Very truly yours, 9

Larry C. Kelley Manager, Nuclear Operations Training JGS/LCK/mkw

,m 06120 PDR -

V NUCLEAR OPERATIONS TRAINING DEPARTMENT: 8200 West Seven Rivers Drive

E I -

REACTOR OPERATOR EXAMINATION l

\ Question 1.05 This question does not ask for derivation or explanation for the fraction of flow to each OTSG.

This information is included as a part of ;he answer key.

RECOMMENDATION Give full credit for fraction of flow to each

! generator.

Question 1.13 The wording of this question does not adequately solicit the desired response. To arrive at the answer given, the candidate must assume that HPI/PORV cooling is initiated and that a swapover to the RB sump is required. An equally probable answer would be to address the rapid cooldown rate associated with an OTSG tube leak / rupture and the effect on this from actuation of the HPI system via the RB pressure actuation of the RBS system. (HPI would accelerate the cooldown rate which is a positive reactivity addition.) Neither case is specifically addressed by the reference given. ,

RECOMMENDATION Accept cooldown considerations as correct as well as sump dilution.

, Question 1.14 f

/

The initial step power change from 0 to 100% power is drawn along the vertical axis of the diagram. For this reason, it is easily missed.

RECOMMENDATION I Credit should be given for xenon traces which start from 100% equilibrium conditions as well as from xenon free conditions.

Question 2.05 The reference given states that hydrogen is the primary gas in the low pressure vent header---not that hydrogen is the primary gas of concern. Based on reference 1 (STS 3.7.11) , credit should also be given for oxygen since this is the gas which the operator can control (by excluding from the system). Both gases must be s present for a dangerous condition to exist.

l 1

y,-

e i RECOMMENDATION

(, ,

Accept either hydrogen or oxygen as correct.

Question 2.12 This question asks for nameplata ratings of the diesel ENGINE. The answer given is for GENERATOR ratings.

' Credit should be given for either answer--that intended or that actually requested. Diesel engine ratings are given on reference 2.

RECOMMENDATION Accept either engine or generator ratings.

Question 2.14 The information in the reference listed is wrong.

Correct information is supplied in reference 3.

RECOMMENDATION Change answer key to reflect correct information.

Question 2.18 This question assumes that an AUTOMATIC Main Steam Line Actuation has occurred. This assumption is not stated. No feedwater valves are affected by a manual actuation of the Main Steam Line Actuation circuit.

See reference 4.

RECOMMENDATION i

i Accept "NONE" as correct in addition to valves listed.

Question 2.21 7

Answer key is wrong. Correct answer supplied in l reference 5.

RECOMMENDATION Change answer key to 330 psig ( + or - 50)

Question 2.23 Answer key is wrong. Correct answer is "C". See reference 6.

RECOMMENDATION Change answer key as indicated.

n ,

Question 3.6 Knowledge of the physical operation of control board

- switches is normally only required when that switch has characteristic which differ from most other switches.

The switches listed in this question do not meet this requirement. We do not feel that this question tests I required operator knowledge.

RECOMMENDATION Delete question from exam.

Question 3.19 The answer key states "causes all of the EFW control valves to come open if they are in hand". This should read "causes all of the EFW control valves to come open if they are in AUTO.

RECOMMENDATION Change answer key as indicated.

Question 4.2 O This question asks "...What is done with DHV-3,DHV-4, and DHV-417" No reference is made to why these actions are taken. The answer for this question states "...to prevent isolation of the DHR system upon spurious ACI."

RECOMMENDATION Remove reason for actions from answer key.

Question 4.3 To complete the requested flow path, the operator must also open MUV-103. See reference 7.

RECOMMENDATION

. Add "open MUV-103" to list. Accept any five actions.

! Question 4.7' HPp-101 lists normal dose limits as 200 and 1000 mrem.

4 These limits may be approved by personnel other than j the Nuclear Plant Manager. This reference also states that doses above 1250 mrem / quarter must be approved by

- the Nuclear Plant Manager. No instructions are given for doses between 1000 and 1250 mrem. Either limit could be considered as correct with the wording of this l

i .. . . _ _ . _ _ _ _ _ _ _.__ _ . _ .- . _ _ _ _

o e f-s question. See reference 8.

(

( ,/ RECOMMENDATION Accept either 1000 or 1250 mrem / quarter as correct.

Question 4.13 The installation of the EFIC control system changed the setpoint for operation with no reactor coolant pumps and adequate subcooling to 65%. The referenced Ve has not been changed to reflect this change. See reference 9.

RECOMMENDATION Change the answer for part b to 65%.

Questions 4.11 and 4.13 These questions require that the operator memorize steps from?varification procedures. This is not supported by a performance based approach to training.

RECOMMENDATION No recommendation is being made on this exam, however, A it is requested that this knowledge not be required on

( future exams.

Question 4.19 AP-320 has recently been revised. There are now no immediate actions for this AP. See reference 10.

RECOMMENDATION Delete question from exam.

SENIOR REACTOR OPERATOR EXAMINATION Question 5.2 While it is true that reactive load is proporcional to excitation current, equally valid arguments can be made '

to say that both real load and output voltage are also proportional as follows:

1. Excitation current is varied to vary output 3 voltage. This in turn varies reactive load. Thus for reactive load to be proportional to excitation current, output voltage must also be proportional.  !

l

2. Real load may be calculated when given power

[)/

s ,,

factor and/or apparent power and/or reactive load.

Since power factor is determined primarily by the i

l

grid, a change in reactive load will result in a O change in read load.

dj No reference can be found which sites a direct proportionality between 'these parameters, there is also no reference which states that reactive load is the only one which is proportional.

RECOMMENDATION Delete question from exam.

Question 5.9 Linear heat rate is also limited to maintain an acceptable DNBR. See reference 11.

RECOMMENDATION Accept DNBR as correct.

Question 5.22 Answer on1 considers B~ decay. Should also address decay by B RECOMMENDATION Accept answer for B+ decay. See Reference 12.

l k

i l

i l

s l

l

,., - ---,-----n.. -, .-,-----,-r----n,-.. ,.- ,------. ,.,,--.-,n ,,- -_- ,-- _ - ,,- ,,n - ,,...,.n.----, - - - , - , , ,-, --

o ,

7_s Question 6.2

(/ There is no correct answer to this question. The same instrument is used to monitor both differential flow to the R C Drain tank and the Letdown coolers. See Reference 13.

RECOMMENDATION Delete question from exam.

Question 6.3 Due to changes in system operation based on experience, both A and B are incorrect. See reference 14.

RECOMMENDATION Accept either A or B.

Question 6.6 B and D are both correct. See reference 15.

RECOMMENDATION Accept B or D.

Question 6.8 Answer as written is incorrect. See reference 16.

RECOMMENDATION Change answer per reference 16.

Question 6.18 The automatic actions for ACI are closure of DHV-3 & 4.

If DHV-41 or 91 are open, an alarm will be actuated to alert the operator. See reference 17.

RECOMMENDATION Delete "...if DHV-41 or 91 are open" from answer key C

I 1

Question 6.21 i \

\ ) There are two possible answers to this question. An actuation of the RBIC by a 4 psig RB signal Will " arm" the spray system by aligning the valves as noted by the answer key. However, the RBS system is also armed by the activation of the HPI ES channels from either the 1500 or 500 RCS pressure setpoint or by the 4 psig R.B.

pressure setpoint. This completes the circuit for the R.B. spray permissive which must exist for an actuation of the RBS system on a 30 psig signal. See reference 18.

RECOMMENDATION Revise answer key to reflect either answer above.

-Question 6.25 Answer key states "...to match actual neutron power to feedwater". It should state "...to maintain feedwater flow within 5% of actual reactor power." See reference 19.

RECOMMENDATION Revise answer key as indicated.

Question 6.26

s. Answer key as written is vague. Should read "...in the

'A' 4160 ES switchgear room.

RECOMMENDATION Revise answer key as indicated.

Question 6.28 Due to lines connecting the two steam chest, the two OTSG's are actually cross connected by a variety of valve combinations. See reference 20.

RECOMMENDATION Delete question from exam.

Question 7.7 Per GET training, PIC's must be rezerced prior to entering a radiation area if they are reading in excess of 30 mrem. Question does not specify source of required information. See reference 21.

RECOhMENDATION Accept 30 mrem as a required time to rezero PIC's.

I i

, l Question 7.8 The required observations prior to frisking are posted at the frisking stations. There is no requirement for the operator to memorize these steps.

RECOMMENDATION .

Delete question from exam.

Question 7.11 On a loss of one RCP, the ICS will run the unit back to 75% and not 70% as listed on the answer key.

See reference 22.

RECOMMENDATION Change part iv to 75%.

Question 7.13 This question tests the operators knowledge of procedure names (numbers). This is not required operator knowledge.

RECOMMENDATION Delete question from exam.

i r Question 7.19 Due to the installation of the EFIC system, this precaution is no longer applicable. Startup range instruments have no input to EFIC logic.

l- RECOMMENDATION Delete this question from future exams.

. /

t i

s a T l

, . - , , . - - . . . . . . , , - . - _ . - - - - - . . - , , . . . ~ _ - . _ - - . . _ . . . _ . - . - - - . - . _ _ - - . . - . . - . - .

s

),Ol e w e

PLANT SYSTEMS

. WASTE CAS DECAY TANK - EXPLOSIVE CAS MIXTURE LIMITING CONDITION FOR OPERATION 4

,. 7- ~

3.7.13.5dThe concentration of oxygen in any Waste Gas Decay Tank shall be !!mited to less (than'or equal to 2% by,' volume whenever the concentration of hydrogen in that Waste Gas Decay Tank is greater than or equal to 4% by volume.

APPLICABILITY: At all times.

ACTION: ,

Whenever the concentration of hydrogen in any Waste Gas Decay Tank is greater than or equal to 4% by volume, and:

a. The concentration of oxygen in that Waste Gas Decay Tank is greater than 2% by volume, but less than 4% by volume, without delay begin to reduce the oxygen concentration to within its limit.
b. The concentration of oxygen in that Waste Gas Decay Tank is greater than or equal to 4% by volume, immediately suspend additions of waste gas to that Waste Gas Decay Tank and without delay begin to reduce the oxygen concentration to within its limit.
c. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

A SURVEILLANCE REQUIREMENTS 4.7.13.5 The concentrations of hydrogen and oxygen in the in-service Waste Gas Decay l Tank shall be continuously monitored with the hydrogen and oxygen monitors required OPERABLE BY Specification 3.3.3.10 or by sampling in accordance with Specification 3.3.3.10 if the hydrogen and/or oxygen monitors are inoperable.

l CRYSTAL RIVER UNIT 3 3/4 7-54 Amendment No. $$,84 m

-- --- -----,-e--'w----u---ea,e , < - ,r-----tr-g amw., - - -v -,w-+++. ---~---,m--mw---vn -r----*r -----------se--

,, Fairbenks Morse Opposed Piston Enginas 3800TD8-1/8 - Page B1

'E

  • Rev. 6/76 e

e B. DATA (Oj '5 .

Engine Data (All data is based on full load engine speed as tabulated. )

-o

$ SPECIFICATIONS AND RATINGS O 'C p g. RATINGS Number of Cylinders .. . . . . . . . . . . . . . . . . . . . . . . 12 RPM .. . . . ... ...... . . . . . . . . . . . . . . . . . 900 KW . . (168 hr maintenance interval rating) *. . . . . . . . . . . . . . 3250 BMEP - psi . . .. . ....... . . . . . . . . . . . . . . . . 160.

Compression Ratio (Total swept volume) . . . . . . . . . . . . . . 13.8 Total Piston Displacement - cu. in. . . . . . . . . . . . . . . . . . 12443 Piston Speed - fpm . ... . . . . . . . . . . . . . . . . . . . . . 1500 BLOWER (Turbo-Compressor at Rated Load h Speed)

Air Delivery (Turbocharger) Approx. - cfm . . . . . . . . . . . . . 12740 Scavenging Pressure (Approx. ) - poi . . . . . . . . . . . . . . . . . 18 INJECTION NOZZLE (Pintle Type)

Discharge Pressure - psi . . . . . . . . . . . . . . . . . . . . . . 2200 + 100 - 0 PUMP - Water Type .. . . . ... . . . . . . . . . . . . . . . . . . . . . . . Centrifugal PUMP - Fuel Oil Type .. . . . ... . . . . . . . . . . . . . . . . . . . . . . . Gear PUMP - Lubricating Oil (j

  • Type . . . . . ... ... . . . . . . . . . . . . . . . . . . . . Gear Pump Relief Valve Setting - psi . . . . . . . . . . . . . . . . . . . 80

SUMMARY

OF OPERATING FIGURES A summary of the normal operating figures at the speeds listed as determined by factory tests is given as follows for reference: (Continuous full load rating 2850 kw)

PRESSURE - psi (1) Firin g Pre s s ur e - M ax. - ps t . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1325 TEMPERATURES - F.

(2) Exhaust - Max. (Individual Cyl. 'at Exhaust Port) . . . . . . . . . . . . . . ... I100 (3) Exhaus t - (Va riation Betwe en C ylinde rs ) . . . . . . . . . . . . . . . . . . . . . . . 300 (1) As indicated, the values given are maximum, however, the AVER AGE full load values are approximately 100 psi lower.

(2) As indicated, the values given are maximum, the AVERAGE full load values are approxi-mately 100 F. Iower and vary considerably with the ambient temperature, installation, operating conditiens, etc.

(3) Exhaust temperature variation between cylinders should not exceed 300 F at full load.

Any significant variation, over a period of time, in the exhaust temperature'of any one cylinder indicates an instrumentation or engine operational malfunction and a detaileo inspection should be performed to determine and correct the malfunction.

O V Refer to Plant Operating Instructions " Switch and Valve Setting Chart."

, .-w - . - , . , - . , . - .,.

- - - - - - - - - ~ -- , --r- -

,a. o' s y4 ,

3800TD8-1/8 - Psg3 B2 . Fairbanks Morse Opposed Piston Engines Rev. 2/76 MISCELLANEOUS G ' . C R A N K LEA D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18* i OVERSPEED GOVERNOR TRIPS AT RPM (UG8 Governor) .............. ' 990 - 1010 OVERSPEED GOVERNOR-TRIPS AT RPM (EGB10 Governor) ............ 1035 - 1053 ,

ENGINE WEAR LIMIT CHART Max. Wear Limit i New No Less No More Part Dimension Than Than CAMSHAFT Bearing Shell ID ........... .............

2.499 to 2.5005 2.5025 Camshaft Dia. .......................... 2.4945 to 2.4955 2.4925 Thrust Bearing End Clearance - Adjustable . . . . . . . .022 CRANKSHAFT C rank pin Journal - OD. . . . . . . . . . . . . . . . . . . . . . 6.745 to 6.747 6.740 Main B ea ring Journal - OD . . . . . . . . . . . . . . . . . . 7.994 to 7. 996 7.988 Crankpin Bearing Shell Thickness ............. .3722 to .3730 .370 Outboard Bearing - 12 Cyl. ................. 5.0025 to 5. 004

  • 5.005 Outboard Bearing Stub Shaft ................. 4.994 to 4. 9955 4.992 MAIN BEARING Shell Thickness Upper Crank - Blower End - Upper Shell . . . . . . . .740 to .741 .738 Upper Crank - Blower End - Lower Shell ...... .754 to .755 .752 Remainder of Main Bearing Shells ........... .747 to .748 .745 Thrust Bearing End Clearance . . . . . . . . . . . . . . . . .020 PISTON AND LINER Piston Diameter - OD ..................... See Note j Cylinder Liner - ID (Reapplication) ............ 8,145 (Cylinder liner wear limit may be extended by removing ridge in combustion area.

Dimension of 8.153 condemns liner for further application.)

Cylinder Liner Out-of-roundness at Assembly .003 Piston Pin - OD ......................... 2.995 to 2.9955 2.992 Piston Pin Bushing (Floating) - ID . . . . . . . . . . . . . 3.000 to 3.0005 3.004 Piston Pin Bushing (Floating - OD . . . . . . . . . . . . . 3.4955 to 3.496 3.492 Conn. Rod Bushing Bore (Assembled) - ID ....... 3.499 to 3.4995 3.503 Piston Ins ert Bushina (Assembled) - ID . . . . . . . . . . 3.001 to 3.002 3.004 Note: Use ring groove dimensions and new dimension of piston rings to determine the ring groove wear. The top ring groove only can be machined for a .015 or .030 oversize width piston ring. .

PISTON RINGS (" Fixed" Piston)

Compres sion - End Clearance . . . . . . . . . . . . . . . . .045 to .055 3/16 Oil Sc rape r - End Clearance . . . . . . . . . . . . . . . . . .020 to .035 3/32 Oil Drain - End Clearance .................. . 015

  • to .030 3/32 Compression (No.1 and 2) - Side Clearance ...... .004 to .007 .015 Compression (No. 3) - Side Clearance .......... .003 to .006 .015 Oil Scraper - Side Clearance ................ . 0015 to .007 .010 Oil Drain - Side Clearance .............,..... . 0015 to .0045 .008
j. TORSIONAL DAMPER - Monofilar Type 2

(12 Cyl. Engines) Upper Bushing (2.996 OD)

(ID ................... 2.374 to 2. 376 2.386 (OD................... 2.995 to 2.996 2.9935 -

Pin - OD .............................. 1.845 to 1. 847 1.842 Pin - OD .............................. 2.136 to 2.138 2.133 Weight (5. 750 OD) (ID................... 2.374 to 2. 376 2.386 Weight (6.188 OD) (ID ................... 2.374 to 2. 376 2.386 Spider Bushing Bore - 8 Holes . . . . . . . . . . . . . . . . 2.9985 to 3.000 3.010 l

i

l- .

s .- .

~

1.4.7 Standby Coolant Heating System i L /~'

  • Standby Coolant Pump -

A: DJP-3, B: DJP-4  ;

Location : In EGDG radiator compartment. 1

  • -Electric Standby Heater -

A: DJHE-1, B: DJHE-2 Location : In EGDG radiator compartment.

  • Coolant Drain Tank -

A: DJT-3, 8: DJT-4 Location : In bottom of EGDG radiator compartment.

Note - This tank is used for draining the Jacket Coolant or Air Cooler Coolant to and can be seturned using the Standby Coolant Pump.

1.4.8 Radiator Fan and Drive

  • Radiator Fan -

Location : In EGDG radiator compartment.

  • Right Angle Drive Gear Box - '

Location : In EGDG radiator compartment.

Location : Radiator end of engine.

I

()

  • Gearbox 011 Cooler -

Location : In EGDG radiator compartment.

1.4.9 Diesel Engine

,

  • Name Plate Ratings:

l o2750 KW at 0.8 power factor - Continuously with i

an expected maintenance period.

o 3000 KW at 0.8 power factor - 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />, no maintenance.

o 3300 KW at 0.8 power f actor - Not more than 30 minutes.

Description:

Fairbanks Morse Model 38TD8-1/8 Diesel Engine.

It is a 12 cylinder, opposed piston, turbo-charged, fast air start, i nternal combustion engine. It provides the function of prime-mover for the emergency generator to which it i s attached. A vertical drive unit couples the upper l crank shaft to the lower for power transmission.

P O

14 er--- - -w-Te--+t- ------?yw?---y-, c y--e -w me&, ---e-- e-y-, ew-mw,:-w-w-----w-w

1 s Qve tYiou ENCLOSURE 1 TITLE 6900V. Reactor Aux Bus 3A LOCATION 119' Turbine Bldg.

BKR. .

NO. LOAD COMPONENT IDENTIFICATION l 1 Breaker 3101 Unit 3 Aux. Trans. Feed

'2 ' RCP f 1Mi2MMNL+=moc=msd A h Aeac to rc C ool'a n f P ump ,

. -;:n j

_3  :

RCP-lcin d st'* '

C' Reactor Coolant Pump 4 4 Breaker 3103 Unit 3' Start Up Trass. Feed l

l hder6M,od h o L t/ywg gfi Ju G ryo R (STM C 'n 470 D v ~e-t 6 I, e nega,/,

I >

T i

I OP-700A Page Rev.0 1. . 3

( i g i g i > [f n' .M -*

W

u o=

ENCLOSURE 2 TITLE 6900V. Reactor Aux Bus 3B LOCATION 119' Turbine Bldg.

I BKR.

NO. LOAD COMPONENT IDENTIFICATION 1 Breaker 3102 Unit 3 Aux. Trans. Feed 2 , ;, RCP-1B JAR '

B.' Reactor Coolant-Pump 3: RCP-10' Y $ % " " "2E'O'D'fReactor3 Coolant-Pump' '

4 Breaker 3104 Unit 3 Start Up Trans. Feed A I 1

e x

OP-700A Rev. O L . . Page 4

! II '

I d ' 'E E lilt ai " r ) R a pi s t M I 'm at"- 9 'ESN E ' -

i

Q b h lorJ O- 0 - -

2.1.4 Maintenance Bypassing p, R e ) - +- S NrL d

}/ Each EFIC channel is provided with a key operated bypass switch located on the cabinet alarm panels (Fig.7 ). All switches are  !

j keyed alike and the key is captive when the switch is in the bypass position. The channel bypass function is subject to the i following interlock features:

l

  • If a NI/RPS channel is in channel bypass only the 4

corresponding EFIC channel may be bypassed.

If an EFIC channel is in maintenance bypass, and any other but the corresponding NI/RPS channel is placed in bypass, the bypass for the EFIC channel will be j removed.

Placing a NI/RPS channel in bypass will cause the c l corresponding EFIC channel's maintenance bypass ,

indication to actuate and the bypass condition for the 1

EFIC channel will be annunciated, even though the EFIC channel is NOT actually in maintenance bypass.

Only one EFIC channel may be bypassed at a time.

j The EFIC maintenance bypass feature does NOT bypass the i

EFW initiation from ES-HPI.

2.1.5 Main Steam Line and Feedwater Isolation

In addition to the initiation of EFW, EFIC will also initiate i Main Steam Line Isolation (MSLI) and Main Feedwater Isolation (MFWI) in the event of a low OTSG outlet pressure condition (<600 PSIG.) The initiation logic for these functions is the same as for the initiation of EFW in that it takes at least two channels j to agree that the function is necessary before it will be i

21

r initiated.

(See Fig.10 A-H) The manual and reset functions also c' work in the same fashion except that in most cases the O initiations will have to be reset, or taken manual control of, in both the "A" and the "B" \

EFIC systems in order for the operator to regain control of equipment. See Fig. 9 and 9B.

't '

When Main steam line isolation occurs the MSIV's on the affected OTSG . (s) will 'be closed and, if the MSLI function is AUTOMATICALLY initiated by low OTSG pressure, Main Feedwater will be isolated by:

  • Closing the main block valve (s)
  • closing the startup block valva (a)
  • closing the low load block valve
  • Closing the MFWP suction valve (s)(s)
    • Tripping the MFW Pump (s)* Closing the MFW cross connect Main feedwater isolation will NOT occur coincident with-MS MSLI is MANUALLY initiated. If MFWI is required it must also eb g

manually initiated by pressing the " Main Feed Isolation" pushbuttons for the required OTSG (s).. The initiation of MFWI will not cause the MSLI function to actuate.

The main steam and feed water isolation functions low e y initiat d b OTSG outlet pressure may be bypassed during plant shutdown and cooldown, by the same switches that bypass the EFW initiation. OTSG outlet pressure must be below 750 PSIG before bypassing will be allowed. In order to prevent an initiation from occurring the system must be bypassed before OTSG pressure dccreases to 600 PSIG. The bypass will be automatically reset wh n steam pressure increases back above 750 PSIG when the plant 10 returned to operation.

22

'd,$ -

l.4.2.2 PUMP DESCRIPTION The pumps were manufactured by Byron- '

Jackson. Each pump is a type DVS, 14x18x27 horizontal, double-bearing pump. It has a sleeve type thrust bearing and sleeve radial bearing. An integral (attached) main pivot shoe oil pump is supplied.

Looking from the pump end, suction is on the left and the discharge is on the

right. The pump .is rated at 12,700 GPM with a 630 ft." head (about 275 9). The shutoff headsis 760 ft (about 330l#). '

1.4.3. FW BOOSTER PUMP AUXILIARY OIL PUMPS (FWP-6A, 68)

Each of the FW Booster Pumps has an auxiliary oil pump. The auxiliary oil pump is manually started 5 minutes before starting the FW Booster Pump. Once booster pump is up to speed, the auxiliary oil pump is manually secured.

1.4.4. MAIN FEEDWATER PUMPS (FWP-2A, 28) 1.4.4.1 ' TURBINE DESCRIPTION Each of the Main Feedwater Pump Turbines is a Delaval, type KJDF, 10 stage, duel inlet condensing steam turbine. Each of the turbines is rated 8,500 H.P. at 5,500 RPM. Rotation is counter clockwise in the i direction of steam flow. Critical speed is 3,500 RPM.

FW HANDOUT 4 Rev.0 12/10/85 L . . -_-._ -, . .-. . _ _ - -- - . _ . _ _ . _ . _ - _ _ .

l OCXd5 b41- -

'sNYtand'R  !

o e ,

4 4, 4 4m b E mataaren e E

'I una!9 un29  !!

ui> <

@ 0 .oGnmJf { j x

<4

  • Ow-'60 -

l7 " p . . ,.g

@ amo o o uns,:

g -

O",, -4l ^'

n. ca. car.cm

@ enes @@ @@@unao 8e* nmo lF -

r O

tt. iss -if x 1.- 11 ti c c

, ,a Q u u u "

_g 4@

e ir

,o y, e ,

s. ,

0 Q@ kg i a ir m-Xuna; { 3,iD, 7 g Q, ow ss)

. C Q,, ens,  ::

qn29 :i G

? '-

j. u _

h #4 cns> ._

_@ 04 $ ) I I.___) Qn-nD u -

  • 4 On SS ) i $.

'il.a, tai' dlifa'ns@-+

-c  :>o-o-

" en29 e ,a., @,-* 2"$> " :: "

,,.., i T e:n: s o ll yt,'!)hai" te2o .

l tu2o Q g '" enuo q,,o x

r . y,,i,neaccatss' -

e /

t g e ED -+

unau @ O,,1 .i.. ,

~ s f .. .

I

, ,..n . . . . E f

gn@e, f Qggp - U Deatu p .

ntseANn secHx; en29
:

oocument sec:gn nn i, l ex. . . un , e-XGia NFGR M ATIO N O N LUf 2 l

= r..a,o .% m-X una; O.n'm l .m ? r .'"'

- C. H. Nuclear . 3 m r.

,. e..i.

I  ;,

e omain I t -_

l M i M On to ,

l , . _, ,, , . _p ,, c. ... n.... ,. .aw m  %

g 3 g{ g ., . ... . .- .

n. FLORIDA POWER CORPORATION 48';

1 u

.~ ~ -~

CRYSTAL RIVER PLANT _

(

'r x

Tkk' PIPING F s. 5151De f Os .

l I ) FEEDWATER i.u.vice i.s><ctio. et sists "

i

""am,C(^8  :".'.;'.fn. i.:.:.:.:.:::::.:::.:.";.;:N.

-. .n. .O::::

. i aia

    • "' F,.O-sc: 302-081 or 29 i

j . l l

io

c.

2.2.2 Construction Figure 3 is a sectional view of the OTSG. Structurally, the OTSG consists of 15,531 Inconel tubes surrounded by a 137.875 -

inch-ID carbon steel sheel which is h.188 inches thick. The tubes and the shell are joined by tubenheets which are circular, perforated plates 2h inches thick. Inconel was selected for J

the tube material for_two reasions: It has good corrosion Que K.2%

resistance, and its coefficient of thermal expansion is very near that of carbon steel, as shown in Figure h.

First consider that, since the OTSG is of straight-shell, straight-tube design, and since the coefficient of thermal expansion of C. (S tko Inconel is sughtly greater than that of carbon steel, certain Co e r g d ac ident or upset conditions might arise during which the tubes g gg could become significantly warmer than the shell. The tube would then become axially loaded in compression and its behavior as a column would have to considered. On the OTSG, the tubes act structurally es columns in the space between tube support plates l rather than between tubesheets. The tube-sheets constitute a built-in boundary, and the tube support plates approximate a pin-end for the tube passing through the plate.

Similarly, should the tubes become substantially cooler than the shell, they would be in tension. During normal plant operation, these temperature limitations will create no problems for the plant operators. It is during upset and accident times that these limits become critical to the structural integrity of the steam generator. For example, if the unit were' allowed to boil dry,.

~

~

than the tubes would_become much wemmer them.the shell and could

_ ,_1, o ver >

t

V. 3 -

Pa 7 * '/ - / -PRIMARY SYSTEMS REVIEW 7

/

O Multiplier- normally left in the "100" position.

In this position the totalizar will count up 1 digit every 100 pulses.

)

l l

Clear Button- will clear the totalizer when l pushed if the stop- start switch is in the stop l position.

Test Button- this button is normally not used.

To perform a feed 0 operation the Jollowing steps are performed:

Determine the required batch size and enter this number  :

into the Batch Controler " Batch Size" thumbwheels. '

Enter a "Preshutdown" value of 10-20 gallons less than batch size. $r clear the " Totalizer" by placing the " Start-Stop" to "Stop", pressing the " clear" button until the totalizer goes to 0, and the placing the " Start-Stop" switch to

" Start" This provides the " Makeup and Purification Feed Permit".

Select a feed source by turning the " Feed Select Sw" to the desired source, and pulling the handle up.

t Feed may be supplied from any one of 5 sources. (Fig.18) i Any one of the three RC Bleed tanks.

i Domineralized Water l

l Boric Acid Storage Tank l

When the source is selected and the handle pulled up, ,

l the white light below the selected source will come on '

and all of the red and green lights in the column below

! the selected source will also come on. These lights are

' located on the " Waste Disposal Feed Permit" panel, (Fig. 18) on the back of the main control board on the l Heating and Ventilation panel. This indicates that these valves are being commanded to travel to the i required position as required by the permit.

I When all of the valves reach their required position, i the " Waste Disposal Feed Permit" is established and the l l " Waste Disposal Feed Permit" light comes on.

I 66 i

i

--, ~

PRIMARY SYSTEMS REVIEW O If MUV-112 is in its normal (to MUT) position, or a "CRD Dilution Permit" exists the " Feed Permit" light on MUV-103 (Feed Valve) will come on and the valve may be 1 opened.

If the feed source is an RC bleed tank, the pump asso-ciated with the selected tank will automatically start when MUV-103 reaches its fully open position. The pump will stop if MUV-103 leaves its fully open position for any reason.

If the selected source is domin water, it will be supplied from the Auxiliary Building Domin Water system.

When the batch size is reached, the feed permit will be terminated, MUV-103 will close, The Waste Transfer (RC Bleed Tank) pumps will stop and all valves in the WD flowpath will close. ,

If the selected feed source is the Boric Acid Storage b l Tank, the supply valve to the MU&P system (CAV-57) must be manually opened to complete the feed permit, and the boric acid pump must be manually started after MUV-103 ,

is opened. The boric acid pump must be manually stopped and CAV-57 must be manually closed when the batch has O been completed.

1 During the Feed operation, feed flowrate into the MUSP system may be controled using the " Valve" knob on the batch controlar. This knob controls the position of MUV-108.

When the batch has been completed the " Feed Select SW" handle should be pushed back in.

To summarise the things required for a " Feed" permits t

s. A flowpath must be aligned from the selected feed source to the MU4P system. (WD Feed Permit)
b. The preset feed cannot have been obtained. This means that the number on the batch size thumbwheels must be larger than the number on the totalizer.

(MU&P Feed Permit)

O -

67

i i

l 6 l 7 )

l 8  ! 9 l 10 ore.

. . -- 3

1. FOR Clis(R.L 40fE3 sEl CA.efisc ,0 302-661 s.(ET I

> II

{

i 1

"2 *

,5

^I 4 s u

's .

^

)

,,3 ,,3 -

T y

M&.d9 g y -

e@ I M

.s

>y Giis x -

    1. -, p - 2 D.E.ls,
c. tit
  • t 3,

wasoll

% %5.2$

)(

)

) ) ) bO '

'M (

v wt# _,, v

(

m _

v

._ *'l-o l - -, v MW '

M (

Gi2EiD

~

gy 3 -

a

n. gig

- ga gsj g b a=ia!>E,Q:gg;.3, IW i

n, wi h i x d GJ,j,aimmu,<),

e' '**"""5 SiiiP 4y (.i.

E: (ae.2W A

g '; e iK A["  ;%e.z.W

'}. Giiisip gijy "?? ""'* 1

4b)a 'G

%l" * ,,-

f O'aO*

s /r .w.

?,

O ra r>

s

$T \

,wi FicAri ,

LEfetWI M, _.

3A

  • FILTDI E g' { wrar em - tav. t e -e O G=Ta g O

= *fGiEliiD -id g ;q; C m %ee "m" ?""l%

E ddli i os Gii3 idii q Giiil---

me.up giis --

i. .

W* p)

' GiEiD g . ,. .. m

.e d4 )W 3

if -x Gii2

. sia . n u giis oEii'E

@, @ , ,M,

-sa :g; Giis =

7 GisiD .A- Giis g=:"'

4 =_49 L .

w gg e

O . MAR

.. IN PROGRESS' (p kGiDiD e,

to.ua.st, r. as ,4.,

g a

~

w 3. h o INN h*

,u, .

s -cia < >

.. N _

,,, /. .

. . u . n . -. . .

..,u.~.-....,.

u. a,

. u.,o-o

.iE.w i = i v i =. . - . . - . =

.. . . . . . , ~ .

a > t.

GiED 7;g I ,y

,u a .. a == as c s I .'3 ",". ,T"./l*.'0":."".t'-" .'+

Rk ,- g ..

,,, m , ,,

c.,.c n , FLORIDA POWER CORPORATION __

g

_u . ,.

CRYSTAL RIVER PLANT

(*v ' ' '

  • u,,n ,

.n ..

NUCLEAR PLANT PIP!hG hL u. SYSTEW Flow OI ACAAns

( Liv. i20~ 10[]

,. WAKE UP & PURIFICATION g.,,t g l . v i s7g Q=M w rf.*

ist .e ceistem enre a.srs case et. sus

        • i~iiCc'*
, , , 2.".tlk:::::::::.":"::EU:.:.::

---'-u.--- - - .ua s gllpa'a FO,,,3,02,

s. oe ,661 38 O f, I f $ 1 . Mhf'E '

- -- -- - ^^

9, 7

, 2.3.9 Dose The quantity of " Radiation" absorbed, per unit of mass, by the body or by a portion of the, body. (10 CFR 20.4(a))

2.3.10 Dose Rate The total quantity of " Radiation" absorbed, per unit of mass, by the body or by any portion of the body during a specified period of time (normally one (1) hour). (10 CFR 20.3(a))

2.3.11 Exposure A measure of the ionization produced in air by X or ganma-

" Radiation" (RHH).

2.3.12 Exposure Limits (Administrative)

The maximum dose an individual may accumulate over a specific l2 period of time as specified by a "RWP/SRWP" or Health Physics l

Personnel (normally 200 mrem / week or 1000 mrem / week not to j exceed 1250 mrem / quarter without prior authorization from the l

Nuclear Plant Manager).

l 2.3.13 Health Physics i

See " Radiological (Radiation) Protection".

2.3.14 High Radiation Area

! An area with very high " Dose Rates" (i.e., greater than 100mr/

hr).

2.3.15 Personnel Monitoring Equipment / Dosimetry Devices Devices designed to be worn or carried by an individual for the purpose of measuring.the dose received. (10 CFR 20.202.b.1) 2.3.16 Protective Clothing (PCS)

Clothing worn for the purpose of protecting individuals from i

"RadioactivesMa,terial" and/or " Radiation".

RSP-101 Rev. 05 Page 3 1

i .

P- nC" ':Nff5M'?SPff M ?M ^ ~ D WP -

~ NNOl'

v- a

(

207 v-i5- (e. , e ) , I gi v >

EFW TRAIN "B"

  • Valves ASV-5, ASV-204, MSV-55, and MSV-56 receive Open signals.
  • Valves EFV-1 receives an open signal.
  • The EFW control valves EFV-55 and EFV-56 are released and allowed to control flow. These valves are normally in the full open position when no EFW actuation signal is present.
  • Vector logic is enabled Af ter EFW has been actuated, flow will be controlled by modulating the EFW control valves to maintain OTSG level at setpoint. If the control valves H/A stations had not been in Auto, the EFW cctuation would have caused them to be placed in Auto. The cetpoint to be maintained is automatically determined by the control modules located in the "A" and "B" EFIC cabinets. The module in the "A" cabinet controls flow from the "A" EFW train to the A and B OTSG and the module in the "B" cabinet controls flow from the "B" EFW train to the A and B OTSG.

If EFW is actuated and at least 1 RC pump is running, the system will control OTSG level at approximately 24 inches. This control cet point is completely separate from the ICS low level limits.

If no RC pumps are running the control module will select a cetpoint of 65% on the EFIC "High Range" instrument. The control modules also have a ramp rate function that controls the rate of OTSG level increase between approximately 2 and 8 inches per ninute. The parameter that determines the actual ramp rate is OTSG outlet pressure. When pressure is at the low and of the control band (about 800 PSIG), the lower ramp rate is selected.

15 l

r w

% hat

  • eE hb b

, . [ ,., .. EEs t pff k ,.

~ l " g,0. .pe a ,.

, { vr.ar ,Yg,,3g ,'

[~ '

On+ 1

"'" "'+

e' e alc [td' Etat .,,, c.' . p

, 4 w tU"'"o. m3 ,[4  ! e.....

- &m,,- = o- ,e> .

T. . e ... ,, ) e..

c.m:,og+:4

.c><

=

O u-sso su -_

D " "" ' 's ]

_{ br.-.64, j

l

,! .  ; b =

g[* -

.wr.=

5 I O bIjh, Qj+( pdJ l "~~?

.  ; feenmo, g

(H

, _ ,,= u e .~. ,>

r 3:: ::e...,.,, y ,, .....

i h" 0 " *)

7 g,,.,g 3ri a e .g Lutj i' N EFr fr,i "

ow no ,gg

! b.. - 3 74 I ex (

_.en2.) REACTOR'U*Id!N **

e-e9 I.

COOLAN .

l C

LET00*ff U{ ~

DRAIN, 0_ d COOLERS "'U9 (' R H

~~

l TO 8 5* q 4, ee TE p . .L

- r .- E w 7 R e-90 hR c.. .,3 9 s

' "'~

Ona*3 / t anr. i ai li Qngu)M, a sar is: ii ~ 5 0 REACTOR { jj REACTOR j,}j* 8 C)4+ BLOD. FAN l+ h -

FAN Q u" 12) * *M ' ' Ondo Q+44,,h

! ^BLOD.5M];QE2D e.

e)

- 'r q) q ir .e

fown <4>p ... <

e -.2 0 e .. . c ,> 7 "A,y6, .i- c.. . ., o c ., ,,3 VENTILATION 6 O d'O -

VENTIL AT 10N llvt=,

Zh. !d ,,

FAN WOTOH {llvtn e 2$. fA FAN WOTOR M,). mg 25 a Q-g D-Hin )

.,s.o..-

1. .......

ss a , -a e . . . . , ,,

o e

, , ... g e - 1, ,, y 1 (t), , h.

I M. C.

,-,e O A I 4 s ,

g

). n, c, g .

caalg t ua na ,, nu m ; , ,

y utum &

__ ,, ta.n q ;

e J2=  ?.,. 3 e J:"% [ ,.,5, % i e as u ..

1e>

A"e ..e e... , o

, >e, m

s 4g-+.

e-.o e.. . .,e m.. . 4 , 4 e -4.

j. 3. g,ps, e..

u.m.o,,m.4, e

vf 4f H ,= (. H -

e-,,o ,. ena ,

M 0-z'0 knad g ..ag DE

@@@ g :-gr@@t@

aa a-,,o fa om enaw @

E 0 " 219 4 =

gg

' e"1 a

'1'l U

= '

Tenuo Tenao T o., 30 APERTUll .

" Tw r"

(', A llD r ir , o ir

_ g Alco Available On Aperture card

  • . L I.

g  :: GE.S Ca in

"'~

l 2 1 4 $

l l l l

m -,

-at tr$10[ Oufl!{t

.- - mi. 5 w EchTvt iaise ems

.e qip Oi '

422.L) 9 *_2 ,

c d

[ ir r 3r .

- ao i.,'Jum.r,a. s  !  ;  ?

?  ? , , -

t.

,p,, g ,i e

,m .1,,

n

- 3o, tvt.ix J1:1 .i i 4 i U s

i r _

i O,,,- m k 7 <> c^

s O_ m . _. /-_q>,m.,5 7 . um, g ," ,,,.,

{

E l['

sits's g,,. yg N{ Gov-m) *"I L e- "" ]" ' N)h (

,79

  • ?,,,, N2r'N' _.g ,l M 9"rd,

@ '3 $

~

r '

b xt'til.9 O' LEO () n..,

vImT 1

iuns i,o<wcuo - ,a .m 6 ~I 3

,08,81,",t- { ,,

j) w amo e r e

.43 l

E uas h A O-Xues r j"E6 C

viu vtht u' tit 0 F

d Qrd$ ~[M 3 fg*fh y y N DAalmD?UIN e.

d b h "

5 C. R. D.

"' ii CL G. W T R.

uuou, $ laim ggg @,

FILTER $

j i .., . . t >

REACTOR l.

dibN_ \r ,

o

-*- BLDC. FAN R. s P t 3 4 e: tis l m* <> -

9 x 7

i, Q1n12) Qn' 9 VENTILATION l I. ,

'~

+f g bcSts q,y g trum '

t re fp i} n.c.

e..e0"$1" e )'a}lr-g c J.dd a

  • id a ,rg t ].,mm ,,, " " "" s p , ,, , ,_. ( , ,,,, va l

- O o, H,

  • M NUCLEAR SERvlCE ril

) 1.{.w.)Da'l6s"t it 6 fts}

BOOS,os TER PUMP 5 c.f.u.e M' iai. ** .

-- g . :is e . _

r O. . $

. . ."' p. . ... z  :. -mr W ~~~- - "- "

    • 1 i j' t'A'AD u " 119 [, .'M q t . *'.0 M ,

'f

" " ~ 4 ^

4 e g y 0 . . ! . . e . > 0 n. :-) . c ',-

uttE9 C.H.Nuclar

}

Q i-M' ,. ,. ,. ,.

~~

L

  • F hh202,0332 -O l u.,.ao

..e .

. em, -

, e, .. . . . . _ . . . . . . . . . _

C . . .... . . , . . . , . ...

..iO UI'EN I. 8 N'l ,$

FLORIDA POWER CORPORATION

" g) i r ["] u. ens '

...n n.

's m i s - /e CRYSTAL river PLANT _

F fu, uten9W W :f 7 JcriRFirx t s. sisttu r"$.T0m 4  :: estio QItid

.c

  • I

@-f O' 9""

F01L110 "" 3

  • i" i

[I il i '""'-'"'"'

NUCuAR ,,RViCo.

CLOSED CYCLE C00LlHC w 7 T' y

't ' I  ; ' "'o"

""'n'"'t: ca EEja;:i:.:.::::::::E:Hi:!:!.

"" ,,,. W F..w ,, llp $ 2 %$8 g g '};: @ !E i- Lo,,3,03-601 33

. ,  ; i.

i i l l

.+ w e+., . . ! -

o e o E@4k;k . ,,,..,.,.,.,,,.

to m r;

. ees .

t

( J' 0 La *m%m! a een? .

0"

'g+7 " "0?),, a I' 1

_b pda 0-g,ri, jiq J -

~

,1v gg, og

..  ! $$#0sh 31jf-bgajy~

h6'Lato~

'0 .. _ gpM!0hpg , n

~

lW+ [L '

. Eg rre -: g  :  :-

~

d f fIhjNg$M,hy

,S e u$8.kJ lr @eg I m . ,w e n;.1+1 .

qs-

~

ee .R -

-t )

~!- ~

c. 0$N@0

+$I

- @+, I@ . <

~ ~ '

de tg . 0i! krb 0080kj0Pg6'!

~

0? 00f 0 30 ,+ g0}*h 6$h[1 gBbh} "gf hi e .

.j. 9@@}I"'

'0 80 .

54" d

$10-{g ja 6

1d @$n+@b8-  !

h b9a. - .: .

. frigg$.y'6g w-63

-e

==

q4 .

l'M Pr*

gj p 1 m: pg

  • e- he..e_.. r:-t ilt'g i 'i vi!

! 8 MN 'h

. I' l! " p eg.qd*i@

D .

""

  • 1 itg >

-e ilWj ;g!j ' CH' .

.2 @ "00$ k. 2__gdr$8 1_ si; ji pE E' ig

' /g? g*li~ "

(9 -

l n! li l "g k e w tw a 4 Cff$ b@

d( .

P 3li

.i. .

W

qm , , . . _ . . . . . .

I Y,11 jO

.f ,

i LPMS REV O2 Date 06-09-86 AP-320 LOOSE PARTS MONITORING SYSTEM

% .._ ENTRY n D,.,..., .

SgPTONS n, , , 'l , , ,l , F-] 3gl l jg a *2 p -

.c.. (; .'q ,, , g

1. Loose Par lty-Monitos ..._CL [, , 'f]. , " " '""

I alarm.

f NOTE l

There are F_Q immediate actions in this abnormal procedure. [

t t

i T!!IS PROC'EDURE ADDRESSES NON-SAFETY RELATED COMPONENTS i

Reviewed By PRC - -

_/ Date 06-09-86 Mtg.# 86-23 Approved By NPM f A Date 6 / A /' 4

.1 AP-320 Page 1 of 11 LPMS

( /

s i

O

g. -+ = . w s -.g, . ~ , _

. - - . . . ...m

C 'I ll POWER DISTRIBUTION LIMITS s ) aAsEs

b. The measurement increased by 5 percent to account for measurement error.of enthal For Condition !! events, the core is protected from exceeding 20.3 kW/f t locally, and going below apressure minimum l IMBALANCE, andDNBR of 1.30 by automatic protection on power, AXIAL POWE temperature.

mandatory since the AXtAL POWER IMBALANCE is an explicit input to t Protection System.

The QUADRANT POWER TILT limit assures that the radial power distribution satisfie the design values used in the power capability analysis. Radial power distribution measurements are made during startup testing and periodically during power operation.

State is 4.49,for Transient State is 11.07, and for the Maximu l

The QUADRANT POWER TILT limit at which corrective action is required provides DNB and linear heat generation rate protection with x-y plane power tilts.

The limit was the event the tilt is not corrected, the margin for uncertainty In o reducing the power by 2 percent for each percent of tilt in excess of thelimit.O is reinstated by 3/4.2.5 DNB PAR AMETERS The limits on the DNB related parameters assure that each of the parameters are

maintained within the normal steady state envelope of operation assumed in the transient and accident analyses.

i The limits are consistent with the PSAR initial assumptions and have been throughout analytically each demonstrated adequate to maintain a DNBR of 1.30 or grea analyzed transient.

The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> periodic survelliance of these parameters through Instrument readout is changes and other expected transient operation. The 18 m the RCS total flow rate is adequate to detect flow degradation and ensure correlation of the flow Indication channels with measured flow such that the Indicated percent flow will provide suffielent verification of flow rate on a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> basis.

CRYSTAL RIVER - UNIT 3 B3/42-3 Amendment No. U, 77 5

,9

~^

._a*

~

?

DZ lQ

==

i -

i.J Oproducing an electric voltage when the junctions of ciency of 33% and are listed in the rectangular box m

7 e

two dissimilar metals are kept at different temperatures along the diagonal to the appropriate mass chain. 3 tre one form of an energy <onversion device. A /

thermionic converter in which electrons emitted by a hot surface are collected to produce an electric cur. Radioactive Decay Chains A e

rsnt is another form of an energy-conversion device. As nuclear processes occur, whether in natural g radioactivity or under artificially induced conditions, The fuel for a radioisotopic power generator must the nuclides change in accordance with the scheme 3 =

be s fe and reliable and low in both weight and cost.

Th:se requirements would result in a rejection of shown in Fig. 2. To understand the use of this scheme g radioisotopes with a half-life less than 100 days more fully, consider the uranium-238 decay chain (one because they would have to be replaced too often. of three such chains found in nature). On the Chart H:.lf-lives greater than 100 years would be rejected we start with the parent uranium-238 which emits an because the activity would be too low to obtain an in- alpha particle. The daughter nucleus is in the second ,

ititi power density greater than 0.1 watts / gram. Among sp.**e diagonally down to the left (see Fig. 2). This g the candidates that would qualify as fuel sources for square represents the isotope thorium-234. (This nu-radioisotopic power generation are 3H, "Co. "Kr, #Sr, clide is also identified by the historical symbolUXi,

'*:Ru, 5 8FCs, *Ce, "FPm, ' roTm, 8'0Po, mPu, 24'Pu, which is the name given to it before it was identified  %

a4 Am and 844Cm. The calculated initial power den. as thorium.)

g sity in watts /gm for these sources are indicated by the Thorium-234 in turn emits a negative electron, so v lu s in the triangular box along the diagonal line the loss of mass is not sporeciable. However, there a through the appropriate mass chain. Is a loss of one negative (narge, which means that

  • In reactor technology, the term fuel burnup refers the atomic number Z increases by ene. In effect, one E to ths amount of fissionable material that is consumed neutron has changed into a proton. The move one L (or the amount of power produced) before it's fuel ele- space up and one space to the left (see Fig. 2) leads a =

mtnt is removed from the reactor for processing. A to protactinium-234 which has isomeric states. Each p common unit is the number of megawatt-days of heat of these states undergoes negative beta emission, so y ensrgy produced per metric ton of fuel (MWD /MT), another move diagonally upward to the left leads to -

wh rs a metric ton is 1000 kilograms, or 2200 lb. For wanium 234. y I er reactors, enriched fuellifetimes would cor. Uranium 234 emits an alpha particle ending at g to an optimum exposure of 30,000 MWD /MT. mi uit of the various nuclear reactions and decays ,"'"

th:1 occur over this long exposure, various trans. *

  • uranium and fission product nuclides will be produced in quantity. Many of these nuclides are of it'terest for _3 special power applications. The production data for ,- w , . . . , ,. =

these nuclides are given on the Chart in two ways:  ;

E e

1. Grams per metric ton of light water reactor fuel . w +* . . . - n.veron ',

exposed to 30,000 MWD /MT. ""' -

2. Kilograms per megawatt year of electric energy delivered from a reactor exposed to 30,000 s. w '""**" N

' " * * ' " 3 MWD /MT. * * - 'moa t% g

.-. ~ ,. 1 The grams per ton (metric) values are quoted at s- ci,on i discharge and are listed in the circle along the a w 'a w ,.. ,, j diagonal to the appropriate mass chain for both low q cnrichment uranium fuel and plutonium mixed oxide *****"8'" -

fu11. The kilograms per 1000 megawatt years of elec- p,gure 2. R.iarnre Locaroons or the Products or various A tric energy values assume a thermal-toelectric effi- Nuciesi Proceun q 14 a _

=

T2 E

~

i

-I i

11 a

i i

, .g . . - - . 1

r-s-

. . . . . , ,, "r L.- L  ;, -

n- x Y t?

A .

- o r  :

?? V L Y ' a s ow a i ,

g r 5y q 2 (e.l.np O to case sum

" = '* _tr.LL__._____ -

s . _-

h 1 y e

,I s _ .- y . +l (c ttoY en"l

$ j 1' .lt.22..__

8' 8 p

. r Mui9

,e l

, 2," l l

, we i iw a

- cc.- no ,

a j e 2 .,

e.

S,

., ,, . e, ov

-i ** rll s! o .- '

p 1 " ' "* * ' (S i::Mui) 3,ddlD @ S MDC3' T

5 -:

l l8 t .rd,

< o) r n C u

7 #g i irg

(; l l euolp.L 1

h fi f!

s v

. onrRh!

,vt e aw i V 8 8

l re -s i e e

t. i-
  • l 7 la j

V

  • ,; l l I----'--

d4'  !! O r,: i c

.- 3e A.

D-[ya 8

l2 h!* , I,n,,=,

y) '" '"  :

d 8 @ S.I l 8 l fV

.,, ,e A :e -oc 'Ai - . .;-.

- . 9  : -

F

, . L ._4%_.. i

<  : - i s -

3 ,s.

3 .

a 3:I s$  :; . 3  : .6.%_

r. . .

a k : 3 W  :

v @ ,,, 3 -

m.l"lm.l

,____.tL____...___,

% h.9 4

n .__

D t_____ESi__ ...___ a i

{

s

'1o g

e w 7g g...

? g ,

.......__.)t 1 ,p .. -i. g. , i Y

U o

l IF 63 (

wu <. . . , c.- .. , , <...., .._,.. _:

L . _ . . ./b./%_....

8 E $8 --N bl,s,gim ol

$ *N J @

nn .te,

@ i tw a >,, .ur, ll ,

o e

e r e u ,

1 a-5 11 kl\ bW et ' h

. - U'

  • P. L. p. 3' (r,, i ng)

W

  • P. L. P.

?

Welsf@t 6' yo g grys,t 7

'Ii do e' $1PAAAf0R i e i $1PAA470R ,

a.

g h. I6 ' "'

I g

  • eac{

m C (&R(M(Af(R$

so  ? rw# muu (&R(HIAf[RS 3c  ? t ,

, s (' , ,g u m( - .g ol tw

" !'l.;..

j Xy. o o) rf lW- * ,,,,,.

jX - ..

o) r be 3

w -

(}-]b. ., 3 -

g o. -

(}-)lu.io g a

@g< ,,. @Elu ---------^-----

I


^------

i

.i

c. .

2, .. , , Mus ,,,,.,, ....... e. w '

._.__ ..........n____ ...__ .. ____.

u M

~s p

= === == ;===f k

, , . , , , , , 9 Q ~ ' -

  • h rn_A.. N

,%yg" * ,pp!*Il  %

a w @d i -a

_ *EPr4> m e- ,,.

., @N*m" 9 '

v"wgam l@ 1n~4@" '

a'

.R [,,d W b,. Lm

~.,,o.. h D 1 i,,

A 3e &j, t

s wm

=

@ @ '(muinj,e' t l

d

. .i

,^V, ,

________8

,g p------ U_3 y

E.LE _ _ _ __ __ _ .r t-lp'b3 3 l

r("jf

.DL) en) p

[

_ __ J_J') c.

L__gl__m.___________b_'_-za__=

hia

__________--__p__7__n_o_-_-_@___ s 6 6 g O.. .W @ @9 D -

run, I ,* @ . .w

]i 6 @ 0 @ w@x-8";'.M" g 8 ea. samaat noris ses ,e s., sii sai in;rgegg u d

w l sw 'y - 6- ko

, L~uu  ;

a k"

74>

J I r

IN i WAR,u... PROGRESS' 4 v< ,

3 4 s

\ n A - .,. i i i

g" "' s nI D

g a m

hs him @ m

)s him

f '

sa @h-

[G a d

a

@h. . .

e p--,-

.____as. 4 1 g d

y :: em, @- *[ _. EDN '";!N" EDHiy.;,@,

q 1

~

% f t-uu: 6 0@2 9' N F gc. @n HocJo '"Y[$UO

g _

, g_ i GED:

p . ________ ______.

D g /cQfC O 3 M - dc%'

p__ ___ __________ ._______________________________ ,,

I 'N FLORIDA POWER CORPORATION WI.E.I,URh, carstu. nivcn etaar K

( a fill iwisiwt rtAni ripii.s its 6 n.n. surns rtos oiAcnani EM  % a,aehle m in a atacar sTEAAd f' " j "

'""'""'*""'**"M'

"' "iU@ '"

4Pcrtrrr, r,,vi ~~. =~'#M. s:.:n:.J" .~~s.':'.:Ci"'.d::"

g< ig_i v

.. i . . ,a

<='= wn io i 01 l L.

FO-302,-

g 1

~A ... .

_i

  • ' l

'8

+

z w, a-

a. .

f..

i . , . , . , . , . , . , . , .

% a ,

r e n -

[?..fQF7 -

N

, j pa j!,.l I 11 ;

!!!5 i,ngi f

i,,h 9 '"O i i,l b 7 "li .

i 1 -)

I

! 5.l i BZ

'(mU) o- -lg 5_l3 8l' s;  :.. /,1 i Qx_l1, J

in e

i Ss -

i' N ' '

@@ b 1 /:O p!! a

~

, i =

gh $ ~-

~

.* @g/ Sho e  ! ll l 'is ll t N v. O l ' ' !r fg h--e}(2

~

a y pg gg';;7; O,7?L J- N% P-3

~

i ; j 3 e .

< n.

,f g-e e %'"

l eh b * '

L . . D.: .

6 6*ia_R ,,NPQ s %JkM. ....ib t I ~j k .

~

l } ja <

g

's ,h '$ l h

': p:

g t y .

se,' se

. ;d:, ; .

~

~

m4 -

oLjP9u q Wl l

Df

.W G g;

e, Ni 6 ,- , -

v.. -

-3,

.a m .

",, J3 ...

. ;- s y- .

~ .;h ' - + 1pb

)g} dus. -

l 4a --7 { , jOiUs--(j-~~gVp gV

e~3 4-- rn _

s i[. .

'4 , _ , , _ _

," .;;i - ' '

- j~._ .. . . -

&b nM -

Ob

. .. W4 g_ .. . .

, . 9@ - ~ .

' ~ '

. O 'i , , .

Q)E"I p. <a S 49

  • b  :

~. [, .- 1,)2 ' k 5 ' 2~E

. .). ...,nN Pl(- Mr[@ l

,,ts tw,p {-(-6 4

c

!, cus p ces --cas- {4 e:s ,d .

, , '.I

'g 6 _ g

~I .

^ '

n

  • hrJ a eeee . .

, ..y  ; ,

Je g- -- w!5) ---- ;rt:.--*<

iig ,g,,: ; w i s

g S pg i;  ; i -

8 e,e.,,  ; ; .

- ."g0 (

s W; 3 ~ r , &.

- ' j Q1 *

- - I - 6 -

, , . i . i i

, i Q Q ,2. s * *

  • Q

..-y Me, ,

f' L3 Fcom Le v4 o -c; l Fw 0 ,y

. .. G, Lad LVnfu 5 ysie rn

{ Q Pressure Turbine Hood Sprays j2 seal and spray water system supplies water to the LP turbine exhaust hood spray nozzles. The flow of this water is controlled by va l v es CO V-119 and COV-120. Operation of these val ves is discussed in the Condensate System lesson.

Condenser Isolation Valve Sealing Water Supply Val ves that are exposed to main condenser vacuum are supplied with gland sealing water f rom the seal and spray water system through GWV-8. This water is supplied through a lantern ring to th0 packing glands of the valves. The supplied seal water flows dcwn along the valve stem and iont the condenser.

System Operation 5e Seal and Spray Water System (GW) is aligned, filled and 4nted, a n d operate d pe r O P-603 " Con densate System" ope ra ting p roce du re. Normally the GW system is one of the first systems started when the plant is being started up and one of the last systems shutdown when the plant is shutdown and cooled down.

While the plant is operating, the GW system runs continously and the only operator f unctions required are monitoring of system parameters and period adjustments and lubrication as required.

As the GW system was originally designed, the Condensate System tas to provide all seal and spray water requirements once it was operating. Plant operating experience later demonstrated the the condensate system coul d not supply suf ficent amounts of water to the GW system so the system is now run continously.

O) t v

Q Ulf (o . b - n

)5

. .. Crem A VO  %}. [ Liv I is manually placed in the demineralizer vessel through a fill '

connection located on the floor above. As with filters, exhausted resin beds are extremely large radiation hazards and all operating and radiation control procedures must be strictly adhered to to prevent excessive.~ exposures or contamination problems. Instructions for changing domineralizar resins are found in OP-407-K, " Operations Involved While Changing Resins".

4.2.4. System Shutdown The MUSP system is kept in operation maintaining pressurizer level and RC Pump seal injection during plant shutdown and for most of the plant cooldown. When RCS temperature decreases below 300 Dag F, the circuit breakers for the non-running MUPs and the HPI valves (MUV-23, 24, 25, 26) racked / locked out and red tagged. This is done to limit the possibility of an inadvertant HPI actuation causing an overpressure situation when the RCS is below normal operating temperatures. When the i

j RCS temperature is < 200 Dag F, and pressure is less thanl50 PSIG, the running makeup pump is stopped and its circuit breaker locked out and red tagged.

4.3 ABNORMAL OPERATION 4.3.1 MUV-16, 31, a~51' Air Failure and'Raset Pnusmatically operate.d valves MUV-16, 'MUV-31,' and'MUV-51 have an air failure protection scheme in their control circuits that will allow limited operation of the valves in theavent of a failure of their instrument air supply. (See i

Fig. 15) If'the air' pressure to eithar the valve' positioner l or the E/P controler decreases to 411PSIG, the solenoid 43 L _ l

vElYe7 a-v'ill" beTde-energized.i This 'ttill TientiL the aiir pressure -

O

-offofihd[ air-lockvalve,,' causing ~it~toclose. In this-situaQki[i(([thA[mir, pressure ' signal going to ' the ' valve

$peratiling 511aphram ^ will"be : " locked --in" ~and will'-not . change.

, - ~ _.

a regardless Lof'wh[at}hsppensl to the: air pre'ss'ure up' stream. -

Widriltti{ solenoid is de-energized, . an - annunciator alarm is <

ScEuatied1 and ' ~ the '" Air L Fail' 1 Reset" ' pushbuttons are ,

b'ackl3.ghted. In the case of MUV-16 and MUV-31, their control stations will be automatically shifted to manual.

If the operator wants to change position of the valves while they are in the air failure mode, he can press and hold the " Air Fail Reset" button. This will energize the solenoid valve and allow whatever air pressure remains to go to the air-lock valve. The operator can then attempt to position the valve from its control station. When the " Air Fail Reset" is released, the system will revert to its air failure mode.

When air pressure is restored, the " Air Fail Reset" Button

will have to be pressed in order to open the solenoid valva l and allow air pressure to be applied to the pressure switch. After the system is reset MUV-16 and 31 will have i

to be returned to automatic operation.

1 4.3.2. Loss of.NNI/ICS Power If power to the Non-Nuclear Instrumentation (NNI) system is lost, many of the MU&P System instrunrntation will also be lost. The most important of these instruments will be

letdown flow and HPI flow. Present guidelines call for the I

l isolation of letdown and initiation of full HPI if NNI or l

l 44

~

Oces. (, . 09 /6

. To reset the automatic f unction or stop the screens, an operator must do so at the local push button. .

()/

\_-

3.1.2 Manual operation is covered 4.n OP 604 Circulating Water System 3.2 Circulating Water Pumps 3.2.1 To start any circulating water pump the four (4) start .

permissives must be satisfied.

[

a.; ; Lube waterflow:is,normaltia, gpm to;the upper bearing.

  • b. f Water box;has_ been primed . toy 115 feet.

e c. Pump . trip permit:. thirty. (30) seconds have -elapsed since pump last. ran.

d. _. Cooling. & seal: water flow;. normal: pressure +;15; psi at bearing.

3.2.2 Once cooling water is flowing through the condenser, cae heat exchanger valve (CWV) may be aligned and placed in

  • automatic as per OP 604 Circulating Water Syste=.

3.2.3 When the ARV's are placed in automatic position, if a circulator trips, the associated (ARV's) priming valves will close and the vacuum breaker on the inlet & outlet water boxes will open in 1.25 seconds, draining the water bex.

3.2.4 When the heat exchanger inlet & cutlet valves ( r.iV) are in autor..atic and a circulator t rips, the aftected he.it exchancer valve will close in 4 seconds.

ST"-35-7

P 0.d06 G.OQ f*Ctri b h. h A//J-9 &7 hev V

00-PS-CLOSES AT 15 PSIG TO INSURE WATER DRESSURF AT UPPER y BRG. ,

/ D0-PS -

/

00-FS- OPENS WHEN ' WATER FLOW DROPS TO LESS THAN 1GP.M j

! 00- FS -

p 6

CW-LS-CONTACT CLOSES AT 115 FT / CW-LS - '

IN THE CONDENSER INLET THIS INSURES CONDENSER PRIMING PRIOR TO PUMP START e / PROVIDES 30 SFC DELAY I

-(m) T.D.C_ / INSURES ROTATION HAS STOPPED i

REPOTE

+ LOCAL' l

_ [ _ _eE m sSisE_

SELECTOR l o OSE CONTROL RM __ LOCAL BKR l P.B. START SELECTOR START o CLOSE PB l' l INSIDE CB-TGF PB AT BKR CUBICLE O OUTSIDE CUBICLE Y  !

l BKR CLOSE l l SIGNAL l l

(

b/ CIRCULATING WATER START PERMISSIVE INTERLOCKS Rev 4

(,, If -

rot- M PRIMARY SYSTEMS REVIEW MVl CONTROL FUNCTIONS Decay Heat Pumps and DHV-34 & DHV-35 The DH pumps will start on a HPI actuation signal of 1500 psig, a LPI actuation signal of 500 psig, and a RB Isolation and Cooling actuation signal of 4 psig building pressure.

The pumps will continue to run until shutdown by the operator. DHV-34 & DHV-35 (if closed) will also open on these actuations.

DHV.-5 & DHV open on a 500 psig LPI actuation to allow LPI water to be injected into the core.

DHV-llo & DHV-lli - LPI flow control valves set at 3000 gym. valves may be throttled by using a bypass key and operating key operated switches at the ES test cabinet.

INTERLOCKS b BWST level heater interlock to prevent uncovering the heaters while they are energized.

Automatic Closure Initiation - The Decay Heat O- system is protected from over pressure by the ACI. Decay Heat drop line valves DHV-3 and DHV-4 are closed when RCS pressure exceeds 284 psig as indicated by RC-3A-PS8 and RC-3B-PS9 respectively. This interlock can be bypassed using key operated switches located on the ES test Cabinets.

2.3.4 SYSTEM INTER-RELATIONS The Decay Heat system is connected to the RCS for normal DH operations via the RCS "B" hot leg and returns via the core flood nozzles.

The discharge of the "A" Decay Heat pump can be directed to the pressurizer spray line via DHV-91 to aid in RCS depressurization during cooldown.

The Decay Heat system is connected to the Spent Fuel Cooling system by a line between DHV-39 and

, DHV-40 to take a suction on the SF system with the DH pumps and returns to the SF system via a line between DHV-7 and DHV-8. These connections allow the DH system to use the SF connections O for chemical addition, filling and draining the 77 t

. - ~ . - , - - - . - , , , - - , - - - ,- . - - , - - , - - , , - - , - - - - - - . - - - - - - . - - - . - - - - - - - - - , - - - . .

i., L I ag o r- v- a st r o O

}f repositioned. This can be a problem because i

O spurious RBIC ES B actuations require several valves to be reset quickly at the local control stations to prevent equipment damage. Some examples of the equipment that could be damaged because of loss of cooling are the CRDN and RCP motor stators.

The original reason for this configuration was to meet the three feet electrical separation between trains ES A and ES B. For this reason, a common i reset switch for the valves was not provided. It 5 was also not desirable to have two control -

switches on the MCB for the same device. The final solution was to place switches for AB valves in the ES AB section of the MCB with power provided from ES A. A local control switch was then provided for ES B control. An engineering l

study, REI 80-4-74, is underway to provide a j quicker means of resetting the "AB* valves after an ES B actuation.

2.2.10.5 REACTOR BUILDING ACTUATION REACTOR BUILDING SPRAY PERMIT

(

In order to have a reactor building spray permit, -

i one of the following two sets of conditions must be present.

1. HPI block 4 actuated on 2 out of 3 channels PAGE 49 Rev. 0

t

, (RC-1,'2, and/or 3) l OR t

l

2. HPI bypassed after an actuation on 2 out of 3 channels.

! NOTE: This is required so that when the '

j operator is required to bypass HPI early in an event in order to regain manual control of the various plant components the RB spray actuation will not be defeated. (This used to be a problem until the BS start circuitry was modified by MAR 85-05-01-01.

In order to have a Reactor Building Spray actuation, the RB spray permit must be coincident with a greater than 30 psig signal on 2 out of 3 RB spray channels (RB-4, 5, and/or 6). $

The RB spray permit, once set, can be reset in any O one of three different ways:

1. Under normal conditions it will be reset by the operator using the two reset pushbuttons on the ESF-A (actuation A) and ESF-B (actuation B) sections of the main control board.
2. If HPI is bypassed and the associated ES 4160V bus undarvoltage relays actuate, the permit will automatically be reset to facilitate block loading of the EDG.
3. If HPI is bypassed and is than reactuated by i

either LPI or RB ISO and COOLING the permit will automatically be reset to faciliate block loading.

The RB spray ectuation permit circuits function the same for both ES actuation A (BSP-1A) and ES actuation B (BSP-1B).

A status light labled " AUTO START PERNIT BSP-1A(B)" indicates the status of the BSP auto start PAGE 50 Rev. 0

7

& A >~

- Co r '/- /f tu t A situation where this is not the case is if either

_ the reactor or feedwater subsystem was not tn automatic, in which case any signal to automatically change power would be passed to the subsystem in automatic, but would be blocked from the system in manual. This would create an unstable situation.

Cross limits can take one of two forms. The reactor can cross limit feedwater, meaning that the reactor is changing power, but feedwater is either leading or lagging the power change. In this case, there is a problem or condition preventing the reactor from responding to a demanded power change (i.e. a relay failure prevents control rod motion), while feedwater is responding to the signal for the new power level.

When the deviation between tsactor and feedwater demand exceeds a 54 deadband, that portion of the error in excess of 54 is inverted, and summed with the feedwater demand signal. The effect of this inversion

w. --

process is to maintain a maximum deviation of 54 bet. ween the feedwater demand signal and reactor demand signal to promote stability. If actual

~ ' '

feedwater flow exceeds reactor power by 64, the portion of the demand in excess of 54, or 14, is inverted, and summed to feedwater demand. The addition

of a -14 demand will reduce feedwater demand by 14, 1

l _ and actual feedwater flow will be reduced by 14, and l

will be maintained a maximum of 14 greater than

.. . .. --- ~

reactor power.

l STM CH. 504 79 Rev. 01/15/85 t

\

e a

w ,,- ys ,

, y-, - - - - - - - ,

.e .. .

When reactor power is limiting feedwater demand.

s cross limits will either raise or lower feedwater demand to maintain feedwater within 54 of reactor power. Cross limits will remain in effect until feedwater has returned to within 54 of reactor output.

The second form of cross limits as when feedwater cross limits the reactor. An example of this situation is when a BTU limit takes effect during an up-power transient. The Integrated Master is increasing its signal to the reactor and feedwater subsystems, but the BTU limit will not allow feedwater to increase as at should. This causes reactor power to increase while feed flow is being limited.

Actual loop "A" and "B" feedwater flows are summed.

and the difference between actual feed flow and demanded feed flow, or feedwater flow error, is sent b)

\s , to the cross limits circuit. If feedwater demand exceeds actual feedwater flow by more than f54, that portion of the error in excess of 54 is inverted, and

'sAmmed with the reactor demand signal. This limits

,_ reactor power to its current value, or causes it to decrease, ensuring heat generation remains less than 54 above heat removal. When reactor power is again within 54 of feedwater flow, cross limits are

. . . . __ released, and normal ICS control is be restored.

STM CH. 504 80 Rev. 01/15/85 O

2/

  • *
  • CLASS : General Employee Training LESSON: Radiation Protection

{

( Techniques Instructional Content

@UMf5Tl04) If >30 mR, prior to entering the RCA, REZERO PIC If > c. When reading PIC, scale must be horizontal 7 d. If lost, wet, contaminated or off-scale report Tf35 to H.P.

e. Return PIC to H.P. by date listed ork PIC for hN fNKRMtNT TO STi>0eg f. Demonstrate PIC charging unit operation pg 2. 'Ihermoluminescent Dosimeter - T.LD.
a. Radiation displaces (and thereby stores energy) electrons in lithium crystals

/

b. When heated, light is given off, light is measured to give mR reading - % of light emitted = to dose.
c. Sent off-site to be read monthly
d. Reading used for permanent record "lb STu g e. Recortis Gamma arri Beta DOSE RATE INSTRUMENTS - indicate the rate of radiation N3} exposure in mR/HR or CPM (counts per minute)

,1. When monitoring for radiation, an Eberline E-130A or similar instrument is used - CONSTANTLY READING SURVEY INSTRUMENT DEMortSTRAq a. 0-10, 0-100, 0-1000 mR/Hr (scale 0-10mR with multiplier switch x1, x10, x100)

NOTES FOR LP MODIFICATION:

O TRNG PGM: GET(RAD) 70 GT-1 07/10/86 LP REV.5

I

d. z s- ~

tor- y.f v mm

  • N ".,L 4, (

e eR Runbacks are accomplished by " locking up" the O ULD (i.e. manual controls are switched out of the circuit), and decreasing demand at a preset specific rate to a pre-determined maximum value.

When the demand is again below the limiting value, the ULD reverts to its normal manual mode, and the normal operator input for rate of change and power level are back in the circuit.

RUNBACKS CAUSE LIMIT E&TL RCS FLOW l.1 x FLOW 204/ MIN RCP's 75/454 504/ MIN FWP's/FWBP's 554 504/ MIN ASSYM. ROD 604 304/ MIN j Should more than one runback condition exist at the same time, the one with the fastest rate of change of power will take precedence. When its i load limit is reached, the runback with the next l

l highest rate of change takes place, etc.

B. Tracking:

l The ULD transfers to the tracking mode to l

maintain coordination of the plant under certain l

limiting conditions. In track, the MWg is used

( as the mwd; therefore, tracking is accomplished

\

t STM CH. 504 12 Rev. 01/15/85