NRC 2004-0027, February 2004 Monthly Operating for Point Beach Units 1 and 2

From kanterella
(Redirected from NRC 2004-0027)
Jump to navigation Jump to search
February 2004 Monthly Operating for Point Beach Units 1 and 2
ML040830590
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/12/2004
From: Vanmiddlesworth G
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2004-0027
Download: ML040830590 (9)


Text

Nu Committed to Nuclear Exceln _ Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC March 12, 2004 NRC 2004-0027 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Monthly Operatina Report

Reference:

1) Letter from Nuclear Management Company, LLC to NRC, "Monthly Operating Report" dated December 11, 2003 In accordance with Technical Specification 5.6.3, Enclosure 1 contains the Monthly Operating Report for February 2004 for the Point Beach Nuclear Plant, Units 1 and 2.

In Reference 1, Nuclear Management Company, LLC, (NMC) submitted the Monthly Operating Report for November 2003. NMC subsequently identified an error in the Net Electrical Energy (MWh) on the Unit 1 Operating Data Report of that submittal. This was determined to be due to a weakness in the software program that generates the report. All other reports generated in 2003 and all subsequent reports were reviewed and found to be correct. Enclosure 2 contains the corrected data.

This letter contains no new commitments and o revisions to existing commitments.

~/I Ga Van Middlesworth Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosures cc: Administrator, Region ll, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC 6590 Nuclear Road

,,c" -Z,kA Telephone: 920.755.2321

Page 2 Desk bcc: J. P. Cowan F. D. Kuester G. D. Van M. E. Holzmann(P460) Middlesworth J. G. Schweitzer E. J. Weinkam D. E. Cooper D. A. Weaver K.

INPO Records IlI (NMC) B. T. Dungan (P346)

K. Meyer M. L. Schug Center T. E. Ruiz K. Kretzer J. Rogoff P. J. Russell J. D. Shaw (WE) C. S. Smoker K. M. Locke J. D. Loock (NMC)

C. B. Jilek J. H. McCarthy(PSCW) B. D. Kemp File

ENCLOSURE I MONTHLY OPERATING REPORT 4 pages follow

I OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 03/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD February - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 696.0 1,440.0 241,585.9
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 696.0 1,440.0 238,036.7
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 353,743.0 734,975.0 110,629,287.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

I I

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 03/02/2004 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Februay - 2004 (Month/Year)

TYPE METHOD OF CACTIONS CTV NO. DATE F: FORCED DURATION REASON (1) SHUTTING ACTIONS S: SCHEDULED (HOURS) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 1 average daily power for the month of February was 508.2 MWe.

There were no LERs for Unit I for the month of February.

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 03/02/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD February - 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 696.0 1,440.0 234,787.7
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 696.0 1,440.0 231,676.8
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 360,666.0 748,374.0 109,249,455.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

9 UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 03/02/2004 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: Februar - 2004 (Month/ear)

TYPE METHOD OF CACTIONS CTV NO. DATE F: FORCED DURATION REASON (1) SUTTG CA S S: SCHEDULED (HOUS) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of February was 518.2 MWe.

There were no LERs for Unit 2 in the month of February.

ENCLOSURE 2 UNIT 1 NOVEMBER 2003 OPERATING DATA REPORT ORIGINALLY DATED DECEMBER 11, 2003 I page follows

I OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 02/12/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD November - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7,802.5 239,401.9
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 720.0 7,794.2 235,852.7
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 368,656.5 3,966,634.5 109,517,943.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997