NRC 2004-0018, January 2004 Monthly Operating Report for Point Beach, Units 1 and 2

From kanterella
(Redirected from NRC 2004-0018)
Jump to navigation Jump to search
January 2004 Monthly Operating Report for Point Beach, Units 1 and 2
ML040550434
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/12/2004
From: Vanmiddlesworth G
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2004-0018
Download: ML040550434 (6)


Text

Noc Committed to Nuclear Excellen 5 ,t Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC February 12, 2004 NRC 2004-0018 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Monthly Operating Report In accordance with Technical Specification 5.6.3, attached is the Monthly Operating Report for January 2004 for the Point Beach Nuclear Plant, Units 1 and 2.

This letter contains no new commitments and no revisions to existing commitments.

Gary D. Van Middlesworth Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region ll, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC I 1.

6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 Telephone: 920.755.2321 Dl_

ENCLOSURE I MONTHLY OPERATING REPORT 4 pages follow

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 02/03/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD January 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 240,889.9
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 744.0 237,340.7
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 381,232.0 381,232.0 110,275,544.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETfER 97-02 DATED MAY 15,1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 02/03/2004 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: .JA2OO 4 (Month/Year)

TYPE METHOD OF CAUSE/CORRECTIVE NO. DATE F: FORCED DURATION REASON (1) SHUING ACTIONS 5: SCHEDULED (HOURS) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 1 average daily power for the month of January was 512.4 MWe.

There were no LERs for Unit 1 for the month of January.

OPERATING DATA REPORT DOCKET NO. 50-30 1 UNIT NAME POINT BEACH NUCLEAR PLANT UNIT 2 DATE 02/12/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD January 2004 I. DESIGN ELECTRICAL RATING (MWE-NET) 522.0

2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 234,091.7
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 744.0 230,980.8
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 387,708.0 387,708.0 108,888,789.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SIIUTD OWNS DOCKET NO. 50-30 1 UNIT NAME POINT BEACH NUCLEAR PLANT UNIT 2 DATE 02/03/2004 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD: y-2OO4 (Month/Year)

TYPE METHOD OF CAUSE/CORRECTIVE ACTIONS NO. DATE F: FORCED DURATION (HOURS) REASON (1) SHUTTING DOWN (2) COMMENTS S: SChEDULED N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of January was 521.1 MWe.

There were no LERS for Unit 2 in the month of January.