NRC 2004-0003, December 2003 Monthly Operating Report for Point Beach, Units 1 and 2

From kanterella
(Redirected from NRC 2004-0003)
Jump to navigation Jump to search
December 2003 Monthly Operating Report for Point Beach, Units 1 and 2
ML040230264
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/12/2004
From: Cayia A
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2004-0003
Download: ML040230264 (6)


Text

Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC January 12, 2004 NRC 2004-0003 TS 5.6.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR 27 Monthly Operating Report In accordance with Technical Specification 5.6.3, attached is the Monthly Operating Report for December 2003 for the Point Beach Nuclear Plant, Units 1 and 2.

This letter contains no new commitments and no revisions to existing commitments.

A. C ia Site V esident, Point Beach Nuclear Plant Nucler Management Company, LLC Enclosure cc: Administrator, Region III, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector - Point Beach Nuclear Plant, USNRC 6590 Nuclear Road

-I 1-1-:5 N,

Telephone: 920.755.2321

ENCLOSURE I NRC MONTHLY OPERATING REPORT

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 01/06/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD December - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8,546.5 240,145.9
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 8,538.2 236,596.7 S. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 381,368.5 4,343,003.0 109,894,312.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit I DATE: 1/13/2004 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: December 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (I) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit I average daily power for the month of December was 512.6 MWe.

There were no LERs on Unit I for the month of December.

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 01/06/04 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD December - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 522.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 518.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7,594.6 233,347.7
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 744.0 7,471.1 230,236.8
5. UNIT RESERVED SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 386,253.5 3,713,278.0 108,501,081.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 1/13/2004 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: December 2003 (Month/Year)

NO. TYPE DURATION METHOD OF CAUSE/CORRECTIVE ACTIONS DATE F: FORCED DHOURSA REASON (I) SHUTTING S: SCHEDULED (H ) DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (I) Rcason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination 5. Other (Explain)

F. Administrative G. Operational Error (Explain)

H. Other (Explain)

SUMMARY

Unit 2 average daily power for the month of December was 519.2 MWe.

There wvere no LERs on Unit 2 in the month of December.