NRC 2002-0058, June 2002 Monthly Operating Report for Point Beach Units 1 & 2

From kanterella
(Redirected from NRC 2002-0058)
Jump to navigation Jump to search
June 2002 Monthly Operating Report for Point Beach Units 1 & 2
ML022000017
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/09/2002
From: Webb T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2002-0058
Download: ML022000017 (9)


Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 Committed to Nuclear Excellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC 2002-0058 GL 97-02 July 09, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of June 2002.

Sincerely, T. J. Webb Regulatory Affairs Manager KML Attachment cc: J. D. Loock, PSCW NRC Region III NRC Senior Resident Inspector NRC Project Manager

Docket 50-266 and 50-301 NRC-2002-0058 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)

To Document Control Desk (NRC)

Dated July 09, 2002 Re: Monthly Operating Report - June 2002

NRC 2002-0058 GL 97-02 July 09, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of June 2002.

Sincerely, T. J. Webb Regulatory Affairs Manager KML Attachment cc: J. D. Loock, PSCW NRC Region III NRC Senior Resident Inspector NRC Project Manager

Docket 50-266 and 50-301 NRC-2002-0058 Bcc: R. A. Abdoo (WE) D. E. Day M. E. Reddemann K. E. Peveler R. A. Anderson(NMC) K. Kretzer G. A. Charnoff C. B. Jilek INPO Records Center A. J. Cayia L. J. Armstrong McGraw-Hill Companies R. R. Grigg (WE) R. M. Daflucas C. S. Smoker (NMC) T. E. Ruiz E. J. Weinkam III (NMC) T. W. Hanna G. D. Strharsky R. R. Winget D. A. Weaver (WE) B. Day RSL File (3) B. D. Kemp T.H. Taylor File A-2

Docket 50-266 and 50-301 NRC-2002-0058 ATTACHMENT 1 Letter from Thomas J. Webb (NMC)

To Document Control Desk (NRC)

Dated July 09, 2002 Re: Monthly Operating Report - June 2002

OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 07/02/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2002

1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 510.0 MONTH YEAR TO DATE CUMULATIVE 3, NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,343.0 227,952.8
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 720.0 4,343.0 224,437.0
5. UNIT RESERVER SHUTDOWN HOURS 0.0 0.0 846.9
6. NET ELECTRICAL ENERGY (MWH) 361,012.0 2,188,370.0 103,763,890.0 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 07/02/2002 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: June 2002 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G. Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 1 average daily power for the month of June was 501.4 MWe.

There were no Licensee Event Reports (LERs) submitted to the NRC.

There were no Significant Operating Events.

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 07/02/02 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD June - 2002

1. DESIGN ELECTRICAL RATING (MWE-NET) 515.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 512.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 3,554.4 221,336.1
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 720.0 3,518.6 218,348.7
5. UNIT RESERVER SHUTDOWN HOURS 0.0 0.0 302.2
6. NET ELECTRICAL ENERGY (MWH) 369,857.0 1,751,428.0 102,534,936.5 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15, 1997

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 07/02/2002 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: June 2002 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 2 average daily power for the month of June was 513.7 MWe.

There was one Licensee Event Report (LER) 301/2002-002-00, Pressurizer Safety Valve Failed to Lift at Test Pressure There were no Significant Operating Events.

This report reflects corrections made to the June 2001 and February 2002 reports.